Field Trip Report 17, Aug. 2010 TEAM MEMBERS GOPIRAAMAN LVS TRA-MI NGUYEN CLAIRE BORDEROLLE CHENFEI YAN JIEUN PARK KWANG NAM KIM YOSHIYA TOUGE HIROYUKI.

Slides:



Advertisements
Similar presentations
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
Advertisements

City of Rye Community Reconstruction Program Committee Meeting #4 Tuesday, August 12, :00 PM, Rye YMCA.
The Benefits of Modeling with Bentley’s Haestad Methods Solutions.
The Stony Brook Watershed Historical Sewer System Changes Wellington Hall Advisor: Ferdi Hellweger Northeastern University Boston, MA August 10, 2005.
Flood Analysis Study of Incheon-Gyo Catchment with SOBEK Model TEAM BLUE Adviser : Shie – Yui Liong (NUS) Leader : He Shan (NUS) Members :
HydroAsia Final Presentation team Purple Reducing Flood Damage by Increasing Green Area.
NETWORK SIMPLIFICATION 1D/1D dual-drainage simulation.
WOODED PROPERTY BOUNDARY ALONG SAM HALL ROAD SECURITY GATE AT PROPERTY ENTRANCE.
The Science and Policy of Environmental Sustainability Preliminary Itinerary Seoul National University, August
Using HEC-1 for Subdivision Runoff Detention Pond Design Stacie Kato April 26, 2004.
Volusia County Public Works
2 nd HYDROASIA ~ The Application of Hydroinformatics Systems in Urban flow Analysis by SOBEK Team Purple
Goals Development Goals for Aspen Falls Presented by Donald Norris, City Engineer.
B LUE T EAM B LUE T EAM - W EB WORK AND TEAM PRESENTATION
Agenda Item 13.2 LUB Update Strategy for Secondary Suites.
Company LOGO Sun-Ah, Lee Sinae, Chae Sophie, Klose Shi, Yundi Jean, Girard Oriol, Raurell Thang, Nguyen FLOOD ANALYSIS STUDY AT INCHEON GYO WATERSHED GREEN.
Skilled Trades 1201 Residential Plumbing.
1D, 2D integrated Flood Risk Mapping (Incheon-gyo Catchment) Team RED Seongjoon BYEON Myeongsoo HAM Michele ROMANO K. Shobha YADAV Masahiko.
Water Quality in Local Lakes and Ponds Aquatic Ecology Unit.
Scotland. Waste Water Treatment Cities – Glasgow and Edinburgh Cities – Glasgow and Edinburgh Coastal Area - Lossiemouth Coastal Area - Lossiemouth Rural.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
HydroAsia face-to-face meeting Opening presentation.
2 “A process that encourages the development and management coordinated water, land and related resources to maximize the economic welfare and social.
Drainage Task Team Volusia County Public Works Judy Grim, P.E. Road and Bridge Director.
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
Meeting Summary Dr. Rabi Mohtar – Comments from meeting Corn is one of the most water-inefficient crops Make sure you understand the soil characteristics.
Floyd’s Fork Stakeholder Process 1 Lindell Ormsbee, Director Kentucky Center of Excellence for Watershed Management
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Area of Inundation Industrial Drive Area of Flooding =
The Aral Sea Field trip May Our team Yard in Tastak village.
Where the Missouri River Meets the Mississippi River Edward "Ted" and Pat Jones-Confluence Point State Park.
Terra Squad Land Use Examples Isa Zachary Kaseem.
1D, 2D Integrated Flood Risk Mapping (Incheon-gyo Catchment) Team RED Seongjoon BYEON Myeongsoo HAM Michele ROMANO K. Shobha YADAV Masahiko.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
Case Kuninkoja- Stormwater investment and stormwater programme of Turku Tallinn Olli-Pekka Mäki.
TCC Budget Highlights Capital Budget - $190.43M Operating Budget - $384.9M Total Budget – $575.33M.
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
DONG DONG-A UNIVERSITY Historical Flood in in. 2 DONG-A UNIVERSITY Online Collaboration Web Platform Web Platform was used as part of the communication.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
FME: The Catalyst for a Multi- Participant Hazardous Spills Database for Peel Region Doug Seaborn Project Lead: Enterprise GIS Development & Deployment.
Miami. Miami: Climate Miami’s client is similar to Houston in several ways. It has one of the highest levels of rainfall of any major U.S. city. It receives.
ASCE 2007 International Roundtable Building Water Infrastructure for Sustainable Development Development of Flood Control Scheme in Japan - Comprehensive.
HYDROASIA 2008 FLOOD ANALYSIS STUDY AT INCHEON GYO CATCHMENT TEAM GREEN NGUYEN HOANG HUYSUN YABIN GWON YONGHYEON SUZUKI ATSUNORI LI WENTAO LEE CHANJONG.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design
Park Eunseon Arunoda Basnayake Seo Jonkok Terazono Mashiko Yellow Team.
Flood Analysis Study of Incheon-Gyo Catchment with SOBEK Model 24 August 2007 BLUE TEAM Advisor : Shie – Yui Liong (NUS) Leader : He Shan (NUS) Members.
BOILER HOUSE CONDENSOR SHAFT PUMP CLEAN WATER IN THE BOILER THERMAL POWER STATION FUEL OR GAS STEAM TURBINE GENERATOR.
City of Plymouth Plymouth Utilities Water System.
SUDS/ Planning workshop A tool to evaluate integrated amenity and storm water indicates of SUDS Rohit Singh Research Supervisors: Prof. Chris Jefferies.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Great Lakes Water Level Variability OHSU-TS-068B-2013.
You have 10 seconds to name…
Water Flow THE AMAZING DROP.
CE 3372 Water Systems Design
My 5 favorite place.
Flooding adapted from a presentation by Prof. David R. Maidment
Upper Snake Reservoir Operations October 13, 2015
Memorial Park Detention Basin Project
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Detention Pond and Channel Stabilization for Bartholomew Park
The _______________ are yellow, Red and orange in autumn. seasons There are 4______________.
5B Unit 1 Tai O.
البزل Drainage ا.م.د. حياوي ويوه الجوذري.
Жирэмслэлт ба тархины харвалт
The West Atlanta Watershed
Marina Dhow cruise Dubia Marina Dhow Cruise.
Engineering Design Process
Presentation transcript:

Field Trip Report 17, Aug TEAM MEMBERS GOPIRAAMAN LVS TRA-MI NGUYEN CLAIRE BORDEROLLE CHENFEI YAN JIEUN PARK KWANG NAM KIM YOSHIYA TOUGE HIROYUKI YAMABE ADVISOR: PROF. LIONG SHIE-YU

Incheon Gyo Watershed INTRODUCTION  Before 1985  Just sea;  Area 34 km 2 ;  900,000 persons;  Area use for industrial and residential. Incheon Gyo watershed Retention pond Flood gate and pumps Sea

Incheon Gyo Watershed RETENTION POND  2 water gate;  12 pumps with a total capacity to 95 m 3 /s:  The total capacity of retention pond is 2,332,620 m 3 ;  There are 3 retention ponds : Suknam (540,000 m 3 ), Incheon (1,245,208 m 3 ) and detention storage in pipes. Sewer network

Incheon Gyo Watershed The pump house Gate Retention pond

Wolmido Island Amusement park

EXHAUSTIVE HYDROASIA

Team Orange Sleeping Beauties and Dinner together