1 Exchange Network Node 2.0 Flow Migration Open Conference Call August 27, 2008.

Slides:



Advertisements
Similar presentations
Slide 1 FastFacts Feature Presentation September 12, 2012 To dial in, use this phone number and participant code… Phone number: Participant.
Advertisements

Slide 1 FastFacts Feature Presentation October 30, 2008 We are using audio during this session, so please dial in to our conference line… Phone number:
EDOS Workgroup Update June 18, 2013 Laboratory Orders Interface Initiative.
ICIS-NPDES Plugin Design Preview Webinar ICIS-NPDES Full Batch OpenNode2 Plugin Project Presented by Bill Rensmith Windsor Solutions, Inc. 3/15/2012.
Demystifying the Protocol and Specification v1.1 Prepared for the Node Mentoring Meeting by: Rob Willis, Ross & Associates February.
RBA Securitisation System Technical Delivery Forum
Welcome to the DPA Fiscal Accountability Self-Assessment Tips -Please place your phone on Mute -Do not put your phone on hold -Please keep all cellular.
Communication Strategies, Cessation Services and Other Tools to Improve Campus-Wide Compliance with Tobacco-Free Campus Policies September 24, 2014 Hosted.
1 Exchange Network Node 2.0 Open Conference Call March 26th, 2008.
1 Exchange Network Node 2.0 Open Conference Call February 27 th, 2007.
Whad’ya Node ? Mentoring Conference New Orleans, LA March 1, 2005 Node Building 101.
1 Exchange Network Node 2.0 Open Conference Call for Node Builders June 21 st, 2007.
1 Exchange Network Node 2.0 Open Conference Call October 18 th, 2007.
Presented by the EPA AQS Team. Agenda Introductions Housekeeping/Overview of GoToWebinar Presentation Q& A session – use Question box to submit your questions.
Slide 1 FastFacts Feature Presentation 12/16/2014 To dial in, use this phone number and participant code… Phone number: Participant code:
Electronic Reporting: ICIS Data Publishing Presented by: Alison Kittle, U.S. EPA Elisa Willard, Colorado Department of Public Health & Environment Roy.
State of Delaware Department of Natural Resources and Environmental Control.
Exchange Network Node Help Desk NOLA Conference Feb 9-10, 2004.
The Exchange Network Browser Mike Matsko: New Jersey DEP Exchange Network National Conference May 30, 2012.
Workshop for University-wide Web Redesign Project Prepared by: OCIO Date: 31 Aug 2011.
Beaches Data Flow Getting Notification Data Into PRAWNS Dennis Murphy Delaware DNREC (302)
Interview Tips October 14, 2008 Beijing Normal University, BELL 2008 Yi Ru.
Re-engineering Testing This net meeting will begin at 10:00 a.m. mountain time You must dial in to the conference call to receive audio: Phone Number:
Welcome to the NALA Presentation to CACPS about Curriculum-Based Certification Helpful hints to make this web cast presentation effective and easy to follow:
Introduction to the Exchange Network January 9 th, 2012.
Building Your Linkedin Network to 500 connections.
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 4, 2010.
EHR-S Functional Requirements IG: Lab Results Interface Laboratory Initiative.
Environmental Response Resource Registry (ER3) Project Exchange Network Conference 2012 May 30 – June 1, 2012.
Features of mobile apps. Introduction of mobile apps  FACEBOOK  Facebook is an online social networking service. Its name comes from a colloquialism.
Electronic Submission of Medical Documentation (esMD) eDoC eClinical Templates on FHIR using Structured Data Capture Use Case May 13, 2015.
Node and Flow Configuration (NFC) Node Mentoring Workshop 2/9/2004.
1 Node NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich.
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 3, 2010.
Introduction to the Exchange Network May 30th, 2012.
EDOS Workgroup Update May 21, 2013 Laboratory Orders Interface Initiative.
Challenge Grant Update: Linking the Network of Natural Heritage Biodiversity Data to the Environmental Information Exchange Network.
Exchange Network Conference San Francisco, CA April 18, 2006 Network and Node 101.
EPA’s Water Quality Exchange (WQX) National Water Quality Monitoring Conference San Jose, California Kristen Gunthardt, US EPA Curtis Cude, OR DEQ.
Electronic Submission of Medical Documentation (esMD) eDoC eClinical Templates on FHIR using Structured Data Capture Use Case May 13, 2015.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage (eDoC) Workgroup June 26, 2013.
Electronic Submission of Medical Documentation (esMD) eDoC Workgroup November 4, 2015.
Data Provenance All Hands Community Meeting June 11, 2015.
Electronic Submission of Medical Documentation (esMD) Author of Record Workgroup Friday, June 22,
November 10, 2015 National BILT meeting1 National Business and Industry Leadership Team (BILT) Meeting for Networking and Convergence Technology November.
Welcome to Baxter Connect Audio/ Web Training Hosted by Qwest.
State of Arkansas Department of Environmental Quality (ADEQ) Air Division State and Local Emissions Inventory System (SLEIS) 2012 Exchange Network Conference.
Electronic Reporting: ICIS Data Publishing Presented by: Alison Kittle, U.S. EPA Elisa Willard, Colorado Department of Public Health & Environment Roy.
Electronic Submission of Medical Documentation (esMD) Electronic Determination of Coverage Harmonization August 14, 2013.
EDOS Workgroup Update Laboratory Orders Interface Initiative.
The Exchange Network Node Mentoring Workshop User Management on the Exchange Network Joe Carioti February 28, 2005.
Electronic Submission of Medical Documentation (esMD) eDoC eClinical Templates on FHIR using Structured Data Capture Use Case May 27, 2015.
Environmental Response Resource Registry (ER3) Project Exchange Network Conference 2012 May 30 – June 1, 2012.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
6/13/2016 U.S. Environmental Protection Agency 1 Starting a Facilities Flow Lee David
Introduction to the Exchange Network May 30th, 2012.
Data Access Framework (DAF) All Community Meeting July 31, 2013.
FastFacts Feature Presentation
EZ MESSENGER CUSTOMER portal training
FastFacts Feature Presentation
FastFacts Feature Presentation
Alaska Measures of Progress Technology Director Webinar Presented by: Ryan Jensen March 10, 2016 Webinar Logistics: Audio will be streamed through Microsoft.
The Advantages of a Trial Balance Software
Please enter *6 to mute your phone and reduce background noise.
Node 2 Migration.
Challenge Grant Update
Welcome to Forest Coordinator Training
State and Local Emissions Inventory System (SLEIS)
Presentation transcript:

1 Exchange Network Node 2.0 Flow Migration Open Conference Call August 27, 2008

2 Introductions This conference call is hosted by the Network Technology Group (NTG), which is the technical work group of the Exchange Network (EN) governance NTG members present: Connie Dwyer, EPA OEI (EPA Co-chair) Glen Carr, Oregon DEQ (State Co-chair) Dennis Burling, Nebraska DEQ Dennis Murphy, Delaware DNREC Tom Aten, Wisconsin DNR Chris Clark, EPA OEI

3 Conference call agenda Provide a general background for migrating existing flows to Node 2.0. Outline efforts being undertaken to migrate existing Exchange Network dataflows. Discuss migration timeline and resources. Question and Answer.

4 Conference call basics Feel free to ask questions at any time during the presentation: before, during, or after! Please put your phone on mute when you’re not asking questions (if your phone has a mute function) Please don’t put this call on hold if your hold function plays music This web conference has a chat feature. Please feel free to send questions or comments to the meeting organizers at any time during the call.

Flow Migration Basics All EN flows will be available to both version 1.1 and 2.0 Nodes. EN Partners can use the same schema for both 1.1 and 2.0 Nodes. No changes to the schema are necessary. CDX will support submissions from both 1.1 and 2.0 nodes. CDX will phase out support for Node 1.1 flows over time. 5

Migrating flows to Node 2.0 Node 2.0 includes new features and fields, like ‘dataflow’, to make message processing simpler. Partners who are upgrading to Node 2.0 will submit some additional information in their messages. The additional information will be clearly defined in FCD addenda for each flow. 6

Major Dates September 30, 2008: CDX NGN in production October 15, 2008: Flow Addenda for major EN flows completed 7

CDX NGN CDX will support two new endpoint for Node 2.0. Old endpoint: New endpoint: New flows and redesigned existing flows will be available on the new CDX Node (Next Generation Node) called NGN which also supports Node 1.1 and 2.0 flows. 8

NAAS NAAS 2.0 supports Node 1.1 flows. NAAS 3.0 must be used for Version 2.0 Nodes All accounts on NAAS 2.0 are available through NAAS 3.0 Bottom line: no additional administration is needed for existing accounts or flows 9

SSL Certificates Node servers use SSL certificates to encrypt messages on the Network Access to CDX NGN Node will require those partners to add the NGN SSL certificate to their Node server trust list You will need an SSL Certificate for your Node 2.0 server if it is a new server. Contact the node helpdesk if you need an SSL certificate: 10

11 Questions on Flow Migration? For Questions on Flow Addenda:  questions to: or For General Questions:  Contact the NTG co-chairs: For help connecting your 2.0 Node to CDX contact: Connie Dwyer, EPA Co-chair EPA OEI (202) Glen Carr, State Co-Chair Oregon DEQ (503)

Q&A 12