NIRB Hearings Cumberland Resources Ltd Meadowbank Gold Project: NRCan Technical Review of the FEIS March 27-31, 2006.

Slides:



Advertisements
Similar presentations
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Advertisements

Carolyn Dunn Environmental Assessment Division Healthy Environments Consumer Safety Branch Health Canada High Lake Mine Pre-Hearing Conference December.
A TECHNICAL REVIEW OF THE NAS FINAL REPORT ON CCB PLACEMENT AT COAL MINES KIMERY C VORIES OFFICE OF SURFACE MINING.
Environment Environnement Canada Environment Canada’s Intervention Presentation Cumberland Resources Ltd.’s Meadowbank Gold Mine Final Public Hearing March.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
TECHNICAL REVIEW Initiated a review on the Abandonment and Restoration Plan of the Lupin Mine: –conducted August through October Team Members: –EBA.
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
NRC LICENSE APPLICATION PROCESS
Hydrogeology, High Lake Rob Dickin Hydrogeologist, GLL.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Problems due to overuse of energy Resources Unit III Part V
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
G3 – Environmental Geomechanics (Dr Sam Yuen)
INTRODUCTION TO ENVIRONMENTAL GEOLOGY. Limits of resources Non renewable: rocks, minerals & fossil fuel Renewable resources: water, plants & alternative.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
ONTARIO’S ABANDONED MINES REHABILITATION PROGRAM Presentation for IAEA/CNSC Workshop Elliot Lake, ON May 1, 2014.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Nunavut Water Board (NWB) NWB’s Community Session Presentation for Type “A” Licence 1AR-NAN0914 Renewal-Amendment Application 1 October 8 - 9, 2014 Public.
Kiggavik Project Final Hearing Presentation
Environmental Geomechanics: A Recent Development in Geotechnical Engineering DR. D. N. SINGH PROFESSOR Geotechnical Engineering Division Department.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
IAEA International Atomic Energy Agency Roger Seitz Addressing Future Human Actions for Safety Assessment Summary from CSM on Human Action And Intrusion.
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
Meadowbank Government of Nunavut Presentation to Nunavut Impact Review Board March 2006Baker Lake, Chesterfield Inlet, Rankin Inlet.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
KIA/NTI Meadowbank Project Review r?9o3u wkw5 vg0pct`Q5FkNK5 g1z=4f5 xS6t8N6gu WoExaizk5 euDi6.
Natural Resources Canada : Regulatory Responsibilities Mineral Advisory Group Meeting (MDAG) Newmont Mining Corporation Doris North Project / Phase II.
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
U.S. Department of the Interior U.S. Geological Survey Dr. Robert M. Hirsch Associate Director for Water April 16, 2007 USGS: Water Resources Program.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Presentation to Final Hearing Baffinland Iron Mines Corporation Mary River Project Type A Water Licence Application Nunavut Water Board Final Hearing Pond.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
Review of Interventions Received after May14 th by Various Stakeholders.
NRCan’s Expertise Geohazards (earthquakes, landslides etc.) Geoscience (marine and coastal geology, and landscape processes, groundwater etc.) Permafrost.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
P.O. Box 18 Cambridge Bay, Nunavut X0B 0C0 Telephone: Fax: Kitikmeot Inuit Association Summary of Technical Issues.
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Review of Meadowbank Water License Application: Public Hearing
Baker Lake, Nunavut Anne Wilson, Environment Canada January 14, 2015
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Agnico-Eagle Mines Ltd
Phase 2 Hope Bay Belt Project
Kitikmeot Inuit Association
Meadowbank Water License Renewal
Mining and quarrying activities and waste generation
Mary River Project Phase 2 Proposal Freshwater Environment
WHALE TAIL PIT Expansion Project
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
ᐱᓕᕆᐊᖑᔪᖅ ᓄᓇᕗᒻᒥ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᑲᑎᒪᔨᖏᓐᓄᐊᖅᑕᐅᓂᐊᖅᖢᓂ
Prepared for the Nunavut Impact Review Board
Presentation transcript:

NIRB Hearings Cumberland Resources Ltd Meadowbank Gold Project: NRCan Technical Review of the FEIS March 27-31, 2006

To help shape the contributions of the resources sector to the Canadian economy, society and the environment To promote the sustainable development and use of natural resources NRCan Mandate: NRCan Key Services: Ensure that federal policies and regulations enhance the natural resource sector’s contribution to the economy Ensure that these policies and regulations protect the environment, health and safety of Canadians Conduct leading-edge science and develop technologies that help Canadians understand their land mass and use their resources wisely

NRCan’s Areas of Expertise: Geohazards (earthquakes, landslides) Geoscience (hydrogeology, surficial and bedrock geology) Permafrost Mine site development, mineral processing technology, and mine reclamation Mine waste management, including tailings and waste rock, protection of surface and groundwater quality, and acid mine drainage Explosives (manufacture and storage thereof)

Geoscience, geohazards, geotechnics and permafrost Mine waste management Explosives NRCan’s technical reviews were conducted by : The October 2005 FEIS was reviewed by scientists with expertise in: Geological Survey of Canada, Earth Sciences Sector Explosives Regulatory Division, Minerals and Metals Sector Mining and Mineral Sciences Laboratories, Minerals and Metals Sector

NRCan’s technical review focuses on 4 of the key topics identified by NIRB: Project Alternatives Water Quality Permafrost Other Issues

General Comments NRCan commends the Proponent for efforts towards addressing outstanding issues identified by NIRB. NRCan considers that the majority of its issues and concerns from the draft EIS review have been resolved. Comments and recommendations related to NRCan’s remaining issues are submitted for consideration by NIRB and the Proponent. NRCan acknowledges the Proponent’s efforts to resolve NRCan’s remaining issues in advance of this hearing.

Effect of Blasting Residues on Water Quality The FEIS has differing takes on the type of explosives to be used. In some parts ammonium nitrate fuel oil (ANFO) is mentioned; in others the use of emulsion blends is discussed. There is a considerable (5 to 15%) loss of ammonia and nitrates associated with the use of ANFO. The Proponent’s predicted ammonia and nitrate loadings to receiving lakes do not correspond with expected loadings resulting from the stated ANFO use. No significant impact on water quality from blasting residues. Ammonia and nitrate loadings to be minimized by a judicious choice of explosive. Proponent’s conclusion NRCan’s conclusion

NRCan’s recommendation Effect of Blasting Residues on Water Quality The Proponent should commit to use an explosive with water resistance, emulsion or emulsion blend; or else reassess ammonia and nitrate loadings based on the use of ANFO and subsequent effects on water quality in receiving water bodies. Resolution The Proponent indicated in an to NRCan dated March 23, 2006, that it intends to use emulsion blend for pit blasting to minimize residual ammonia and nitrates.

Other Issues: Acid Rock Drainage and Leaching of Metals and Other Constituents The Proponent has sufficiently characterized the mine waste materials with emphasis on generation of acid rock drainage (ARD) and leaching of metals and non-metal constituents. NRCan’s conclusions

Other Issues: Acid Rock Drainage and Leaching of Metals and Other Constituents NRCan’s recommendations As mining progresses, the prediction results presented in the FEIS should be confirmed and waste management plans should be re- evaluated if necessary. The feasibility of segregating and stockpiling of various rock types for blending, co-disposal and placement as cover materials should be evaluated. During operations, proposed disposal practices should be re-evaluated by systematic sampling of waste rock and tailings. Preventive and control measures should be developed to manage the tailings during operations and following closure.

As freezing of the tailings progresses, it is likely that concentrated pore fluids will be forced ahead of the freezing front. The Project Alternatives report (Fig. 7.6) shows the dam and its foundation completely frozen. However, this final state may take several decades to achieve. The report “Thermal Modelling of the Tailings Deposit in the Second Portage Lake, Meadowbank Gold Project” indicates that freezing of the tailings will not be complete by the time Second Portage Lake is returned to its original level. Proponent’s conclusion NRCan’s conclusion Tailings Thermal Modeling Freeze-back of the Meadowbank Tailings

As the tailings freeze (dashed blue line), remaining unfrozen pore water with contaminants will be forced into Second Portage Lake before the tailings dam and underlying bedrock is frozen. Tailings Thermal Modeling Freeze-back of the Meadowbank Tailings

Tailings Thermal Modeling Freeze-back of the Meadowbank Tailings NRCan’s recommendations The Proponent should demonstrate that tailings freeze-back will not result in discharge of contamination to Second Portage Lake. The Proponent should provide an indication of the expected life of the tailings dam.

Tailings Thermal Modeling Effects of Groundwater Flow Proponent’s conclusions Tailings will freeze over completely within years and effects of regional groundwater flow on the freeze-over time are minimal. Tailings porewater is unlikely to impact the deep groundwater regime. NRCan’s conclusions The tailings thermal modeling did not adequately consider advective heat transport to the tailings from ground water upwelling in the Second Portage Fault that may inhibit tailings freeze-back during early stages of mining The tailings seepage modeling did not consider preferential flow of tailings porewater back into the Second Portage fault before freeze-back is complete Until tailings are completely frozen, contaminated groundwater from the impoundment may migrate toward the Portage pit lake through the fault or the bedrock beneath the dam.

Tailings Thermal Modeling Effects of Groundwater Flow NRCan’s recommendations The Proponent should conduct supplementary technical analyses that specifically investigate effects of groundwater flow and advective heat transport in the Second Portage fault on tailings freeze-over and on possible migration of contaminants toward the pit lake. The Proponent should install deep monitoring wells in the tailings dike to sample groundwater quality and hydraulic gradients in the Second Portage fault during operations and the post-closure period.

Tailings Characterization Ultramafic Rock as Cover Material The Proponent claims that ultramafic (UM) capping material will have a low permeability to infiltration yet will be coarse enough to allow convective air cooling of tailings and waste rock during the winter. Proponent’s conclusion NRCan’s conclusion The Proponent’s statement appears contradictory and that raises doubts about the ability of the UM cover to perform as intended, maintaining a thaw depth above the top of the tailings.

NRCan’s recommendations Tailings Characterization Ultramafic Rock as Cover Material Resolution In a conference call with NRCan on March 23, 2006, the Proponent committed to providing a written clarification of the UM capping scheme for the public record. The Proponent should document the permeability to air and to water of the proposed UM capping layer The Proponent should demonstrate quantitatively that the capping layer will perform as planned and maintain the seasonal thaw depth above the top of the tailings

Other Issues: Geoscience, geohazards and geotechnical NRCan’s recommendations NRCan requests minor points of clarification regarding the character of principal faults in the mine site area and the potential for fault reactivation in the case of a seismic event. NRCan is satisfied with the Proponent’s responses to previously raised concerns regarding the deep groundwater flow regime; quantity and quality of pit inflows; stratification and trophic status of the pit lakes; lake sediments; nature and composition of the bedrock and overburden; borrow pits and quarries for all-season road; and, earthquakes and seismic hazards.