Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.

Slides:



Advertisements
Similar presentations
Questions about AVR & PSS
Advertisements

Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
Presented to PGDTF February 11, 2015
PER
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Discussion: Use of RAPs in system operations Kris Dixit 1.
Outage Coordination Overview D.W. Rickerson ERCOT Outage Supervisor 12/1/2008.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Real-Time Transmission Congestion Management & Market Effects
OPERATING IN THE EAGLE FORD SHALE
1 If I were to give grades today… > 80A A B B B C C C D D D-1
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Peak RCCo Performance Metrics Draft –November 2013.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC 10/09/2003 KENNETH A. DONOHOO, P.E. Manager of System Planning Transmission Services
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Constraint Management Plans (CMPs) An Ops Planning Perspective Nitika Mago Operations Planning, ERCOT.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
East Texas Export Limit ERCOT Operations Planning ERCOT Market Presentation
Responding to post contingency overloads, IROL’s and SOL’s Art Gardiner – CPS Energy Steve Rainwater - LCRA 1.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Scheduling and Operating Transmission Devices in the Nodal Environment.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
Joint PLWG/CMWG Assignment Update to ROS September 15, 2011.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Bert Peters Chair, Path Operator Task Force
NERC Lessons Learned Summary
Barrilla Junction Area Transmission Improvements Project
Phase Angle Limitations
Grid Integration of Intermittent Resources
Reliability and Operations Subcommittee Report
Presented by: LADWP November 14, 2017
Project WECC-0100 Update Load Modeling Task Force
Determine Facility Ratings, SOLs and Transfer Capabilities
CEO/Co-founder, SOS Intl
TONBRIDGE POWER GREEN LINE
Project WECC-0100 Update Load Modeling Task Force
Bert Peters Chair, Path Operator Task Force
Presentation transcript:

Reliability Requirements Bill Blevins Manager of Operations Support ERCOT

2 Operating Security Limit to SOLs and IROLs Operating Limit Definition Task Force (OLD-TF) in November 2002 In March 2003 the OLD-TF submitted a report to the Operating Committee suggesting that there were, in fact, two types of Operating Security Limit violations: 1. Those that would affect only a “limited set of facilities” were called System Operating Limits (SOL), and 2. Those that posed a serious threat to the reliability of the bulk power system, such as instability, uncontrolled loss of Interconnection integrity, or voltage collapse, were called Interconnection Reliability Operating Limits (IROL).

3 Standard TOP-002 Transmission Operations Planning Purpose: Current operations plans and procedures are essential to being prepared for reliable operations, including response for unplanned events. –Each Balancing Authority and Transmission Operator shall plan to meet unscheduled changes in system configuration and generation dispatch (at a minimum N-1 Contingency planning) in accordance with NERC, Regional Reliability Organization, subregional, and local reliability requirements.

4 Standard TOP-004 Operations Purpose: To ensure that the transmission system is operated so that instability, uncontrolled separation, or cascading outages will not occur as a result of the most severe single Contingency and specified multiple Contingencies. –R2. Each Transmission Operator shall operate so that instability, uncontrolled separation, or cascading outages will not occur as a result of the most severe single contingency.

5 Contingency Analysis RTCA studies the N-1 and specified multiple Contingencies. –Studies affirmatively indicate Outage of the N-1 or DCKT poses a significant risk of uncontrolled outages because it would result in equipment overloads, which cannot be eliminated through execution of specific, predefined operating procedures (i.e. RAPs)

6 SCED Overview – Applicable Contingencies ERCOT models all single transmission line, autotransformer, and generation unit contingencies –This is performed using an automatic contingency generator application developed by the Network Modeling Department and has been discussed with the Network Data Support Working Group (NDSWG) –Certain additional contingencies are defined manually in the CIM where the automatic contingency generator cannot be used Double-Circuits –Modeled based on information received by Transmission Owners (discussed in previous NDSWG meetings) Multi-unit contingencies such as whole combined-cycle trains Additional multi-unit contingencies are modeled pursuant to ERCOT and NERC requirements (e.g. double STP or Comanche Peak)

7 Contingencies used in Operations ERCOT uses NMMS to generate the N-1 contingency list. Additionally ERCOT uses NMMS to check existing double- circuit contingencies within NMMS. These are maintained. Under the posted OPERATIONS SUPPORT PROCEDURE- ”DEFINITIONS AND MAINTENANCE OF CONTINGENCIES”

8 Use of the results from RTCA in SCED Generic constraints Contingency Analysis RTCA Stability interface constraints Active constraints & shift factors Transmission Constraint Management Transmission Constraint Management TCM Contingency constraints & shift factors Voltage Stability Analysis Transient Stability Analysis MMS MIS Constraint information Remedial Action Plans Dynamic Remedial Action Plan DRAP RAP, SPS

9 Mitigation plans Mitigation Plans (MPs) are pre-determined actions to be taken associated with the occurrence of a specific contingency event if congestion management methods cannot resolve the post- contingency overload. MPs are designed to be enacted POST- Contingency. They are NOT pre-emptive congestion management actions. –Activate constraint if shift factors exist for ≥ 2%

10 Mitigation Plan examples applicable to SCED irresolvable congestion Ackerly Lyntegar – Sparenburg example

11 Ackerly Lyntegar – Sparenburg Overload: Pre Contingency Contingency Constraint TOAP Contingency: Willow Valley to Lamesa Outage Constraint: Ackerly Lyntegar – Sparenburg Constraint Flow: MVA

12 Ackerly Lyntegar – Sparenburg Overload : Post Contingency Contingency Constraint TOAP Contingency: Willow Valley to Lamesa Outage Constraint: Ackerly Lyntegar – Sparenburg Constraint Flow: MVA

13 Ackerly Lyntegar – Sparenburg Overload : Post TOAP Contingency Constraint TOAP Contingency: Willow Valley to Lamesa Outage Constraint: Ackerly Lyntegar – Sparenburg Constraint Flow: MVA

14 Odessa North 138/69 kV Auto Overload : Pre Contingency Contingency Constraint MP Contingency: Holt Switch – Moss Switch Outage Constraint: Odessa North 138/69 kV Auto Constraint Flow: MVA

15 Odessa North 138/69 kV Auto Overload : Post Contingency Contingency Constraint MP Contingency: Holt Switch – Moss Switch Outage Constraint: Odessa North 138/69 kV Auto Constraint Flow: MVA

16 Odessa North 138/69 kV Auto Overload : Post MP Contingency Constraint MP Contingency: Holt Switch – Moss Switch Outage Constraint: Odessa North 138/69 kV Auto Constraint Flow: MVA