BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Sway Control System – Series 2 (SCS-S2) Leading the Way in Innovative Product Development.
EXPERIENCE THE DIFFERENCE S4 Cranes 1. EXPERIENCE THE DIFFERENCE S4 Cranes 2.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
J.D. NEUHAUS powered by air J.D. Neuhaus L.P. The Force To Lift Your Business J.D. Neuhaus LP 9 Loveton Circle Sparks, MD Phone:
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Overhead Cranes Considerations and Applications by Craig Pelkola Applications Engineer North American Industries Boston, Massachusetts, USA.
R. Rinaldesi, K. Kershaw – HE Group
BIDDERS’ CONFERENCE IT-3980 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Up to 10 Tons Capacity 20 March.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Reducing manual effort of up and downloading activities at Coats Odorhei.
TENDERING PROCEDURE IT- 3927/EN
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture General Arrangement (G.A.) Drawings.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
CRANE RELIABILITY Mechanical Faults CENF TARGET AREA - OVERHEAD CRANE Hoist (lifting movements)
Transport and Handling (T&H) considerations for HL-LHC
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Service.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Technical Specification Handling Engineering Group.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Different cable reel has a different role. Hysteresis type cable reel working principle and scope The working principle of A. Power control system is.
C-shaped steel beam pulley cable pulley lifting and installation work status.
Design of Crane Components
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Overhead cranes consolidation in EHN1 R.Rinaldesi EN-HE.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Gantry Crane Manufacturer Rosava Engineering Group.
Gantry Crane Gantry Crane  Rosava Engineering Group presents the Gantry Crane. We provide cranes.
Planning and Realisation of Wind Farms
Handling Engineering Group
CLIC Handling Engineering Update
CLIC Civil Engineering Update
Updated Design of Detector Hall
IT-4189 Supply and installation of a cryogenic distribution system
EN-Handling Engineering Group
FCC lifts Layout, characteristics etc.
TENDERING PROCEDURE IT-3981/EN
Press “Space” to start presentation
EN-HE SPS works during EYETS
SR1 cleanroom extension
IT-4328: Technical Specification
IT-4328/EN Bidders conference
The Basics of Overhead Crane Pre-op Inspections
Order of Engineers and Architects New Lebanese Standards Related to LIFTS NL EN 81standards Habib Srour.
NATIONAL LEADER IN TESTING, INSPECTION AND CERTIFICATION
Infor EAM in the Handling Engineering Group at CERN
IT-4464/EN Bidders conference
Presentation transcript:

BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January 14th-15th 2014 Handling Engineering Group2 Technical Specification

Scope of the supply Delivery schedule Documentation Site activities January 14th-15th 2014 Handling Engineering Group3

Scope of the Supply Following our planning, about 25 cranes are foreseen to be subject to intervention in the next 5 years Dismantling, refurbishment or replacement of obsolete EOT cranes as well as the supply, installation and commissioning of new ones Five years blanket purchase contract Definition of a catalogue of prices (IT- 3981_EN UPL) January 14th-15th 2014 Handling Engineering Group4

Scope of the Supply Catalogue of prices is structured as follows: Basic prices for interventions on cranes (A2 – F11) Prices for additional features (G1 – G18_F) Price for different contexts of installation (H1 – H4) January 14th-15th 2014 Handling Engineering Group5

Scope of the Supply January 14th-15th 2014 Handling Engineering Group6 CraneABCDEF Capacity [ton] Span [mm] ± ± ± ± ± ± 1500 Lifting Height [mm] 6000 ± ± ± ± ± ± 4000 Hoisting speed [m/min] Cross travel speed [m/min] Long travel speed [m/min] Installation height [mm] 7000 ± ± ± ± ± ± 2000 Example crane PR 712 (SD4) PR 76 (bldg. 201) PR 68 (bldg. 167) PR 720 (UX85) PR 82 (bldg. 168) PR 725 (SX8)

Scope of the Supply January 14th-15th 2014 Handling Engineering Group7 Category of interventionRef. section of Tech. spec. 1Dismantling of hoist trolley Dismantling of a EOT crane Replacement of rails Replacement of electrical feeding line Replacement of frequency converters Replacement of PLC system Replacement of electrical plant Replacement of long travel mechanisms New hoist trolley New EOT crane Replacement of hoist mechanisms2.2.11

Scope of the Supply January 14th-15th 2014 Handling Engineering Group8 Representative EOT crane Category of interventionABCDEF 1 Dismantling of hoist trolley Dismantling of crane Replacement of rails Replacement of feeding line Replacement of all frequency converters Replacement of PLC system Replacement of electric plant Replacement of long travel mechanisms New hoist trolley New crane Replacement of hoist mechanisms 111

Scope of the Supply January 14th-15th 2014 Handling Engineering Group9 Additional FeaturesRef. section of Annex 1 1Replacement of cabin3.4 2Lamp maintenance platform3.7 3Motorized hook Fault diagnosis4.21 5Safety zones4.22 6Coupled operation4.23 7Camera system4.24 8Distance-assistance system4.25 9Sway reduction Anti-collision system8.6 11Auxiliary hoist (fixed on trolley, 5 tons capacity, 10 m lifting height)- 12 Auxiliary hoist (sliding on a monorail 15 m long, 5 tons capacity, 10 m lifting height) - 13Redundancy of all motors Redundancy of lifting motor and complete redundancy of horizontal drives Emergency brake8.3 16Double of the lifting height (respect to the highest value of the range) 8.4 (only if increased lifting height exceeds 25 m) 17Shaft crane (100 m of lifting height)8.4, Guide-rollers-

Scope of the Supply January 14th-15th 2014 Handling Engineering Group10 Context of InstallationRef. section of Tech. spec. 1Installation in surface building with space constraints6.2 of this document 2Installation in underground areas6.3 of this document 3Installation in radiation areas6.4 of this document

Scope of the Supply Items will be ordered by the means of release orders Each order will be accompanied by a questionnaire specifying:  Data of the crane subject to intervention  Type of activity (refurbishment, replacement…)  Additional features  Context of installation Contractor will be required to confirm the price January 14th-15th 2014 Handling Engineering Group11

Scope of the Supply January 14th-15th 2014 Handling Engineering Group12 Example: Project type: Refurbishment Capacity: 40 ton Span: mm Lifting height: mm Hoisting speed: 8 m/min Cross travel speed: 15 m/min Long travel speed: 25 m/min Installation height: 11 m Length of rails: 40 m

Scope of the Supply January 14th-15th 2014 Handling Engineering Group13 Example: Items: Dismantling of hoist trolley → D1 Replacement of electrical plant → D7 Replacement of long travel mechanisms → D8 Supply of a new hoist trolley → D9 Replacement of electrical feeding line → D4 Double of the lifting height → G16_D Price: D1 + D7 + D8 + D9 + D4*40/50 + G16_D

Scope of the Supply Prices for items which are not covered will be extrapolated from the catalogue of prices Negotiation before order No committment to order January 14th-15th 2014 Handling Engineering Group14

Delivery Schedule January 14th-15th 2014 Handling Engineering Group15 Category of intervention Submission of design report (time after the release order) Delivery / installation (time after the release order) Acceptance tests at CERN / Completion of works (time after the release order) 1Dismantling of Hoist Trolley--6 weeks 2Dismantling of a EOT Crane--6 weeks 3Replacement of Rails2 weeks1 month2 months 4Replacement of Electrical Feeding Line2 weeks1 month2 months 5Replacement of Frequency Converters2 weeks6 weeks2 months 6Replacement of PLC system2 weeks2 months3 months 7Replacement of Electrical Plant2 weeks2 months3 months 8 Replacement of Long Travel Mechanisms 2 weeks2 months3 months 9 Supply of a New Hoist Trolley (capacity < 30 tons) 6 weeks3 months4 months Supply of a New Hoist Trolley (capacity ≥ 30 tons) 6 weeks5 months6 months 10 Supply of a New EOT Crane (capacity < 30 tons) 6 weeks3 months4 months Supply of a New EOT Crane (capacity ≥ 30 tons) 6 weeks5 months6 months 11Replacement of Hoist Mechanisms6 weeks5 months6 months

Documentation January 14th-15th 2014 Handling Engineering Group16

Documentation January 14th-15th 2014 Handling Engineering Group17

Documentation January 14th-15th 2014 Handling Engineering Group18

Documentation January 14th-15th 2014 Handling Engineering Group19

Documentation January 14th-15th 2014 Handling Engineering Group20

Site Activities January 14th-15th 2014 Handling Engineering Group21

Site Activities January 14th-15th 2014 Handling Engineering Group22

Site Activities January 14th-15th 2014 Handling Engineering Group23

Site Activities January 14th-15th 2014 Handling Engineering Group24

Site Activities January 14th-15th 2014 Handling Engineering Group25