Alkek Expansion Pre-Submittal Conference October 5, 2006.

Slides:



Advertisements
Similar presentations
Replacement of the Queens Approach Bronx-Whitestone Bridge
Advertisements

February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Presented By: Kary S. Amin Nova Environmental, Inc.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
CORE DESIGN.
United States Fire Administration Chief Officer Training Curriculum Operations Module 15: High-Rise Simulation Exercise.
Egress & Core strategies
Unit 6.5. Facility design, renovation, and use TB Infection Control Training for Managers at National and Subnational Level.
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Skyscraper Construction
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Reconstruction of the Eads Bridge Highway Deck
The Pavilion Pre-Submittal Conference April 1, 2010.
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Blue Prints.
U Building Area: (sf) 2,500,000 SF Anticipated date of completion: Estimated Completion 2012 Location of Project: Miami, FL Type of Project: Mixed-use.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Firstname Lastname Building Systems Integration ARCH 4325 Semester Year University of Houston College of Architecture NAME OF ASSIGNMENT Date submitted.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
After studying this unit, you will be able to: Interpret architectural drawings Describe how computers can assist in understanding house plans Organize.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
The Effects of Construction Activity on Indoor Air Quality for Hospitals Presented by: Tom N. Petersen, P.E. Environmental and Engineering Solutions, Inc.
UNC Charlotte Health & Wellness Center Pre-Submittal Conference June 9, 2015, 2:00 PM Cone Center - Room 210.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Taylor Pavilion Design Review Pavilion Design Review Committee 2015 June 3, 2015 Belmar Mayor & Council form an advisory committee to review the.
HVACR416 - Design IAQ / Ventilation / Pathways. Ventilation Most air handling units distribute a mix of outdoor air and re-circulated indoor air. Some.
Planning for Resiliency. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
DRAWING ON EXPERIENCE … BUILDING ON STRENGTH Six Storey Wood-Framed Buildings Unique Structural Opportunities & Challenges Kurt Ruhland, P.Eng. Director,
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Design Development Code analysis Partition types.
Process of Planning, Designing and Financing a Hospital
BUILDING ANALYSIS Established in PG5 is a diverse building, consisting of the following:  Parking garage  Classrooms  food court (seats 300) 
AT – 201 Introduction to Architecture Dan Trent August 28,
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
COZYEON Residence Main facilities gallery. Corridor of each floor.
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
INTRODUCTION TO CONSTRUCTION TYPES Code Consultant:Steven R. Winkel, FAIA, PE The Preview Group, Inc. Contractor: Scott Smith.
Planning Facilities for Flexibility. Planning Facilities for Flexibility l 2 What is… FLEXIBILITY The Ability to Expand or Adapt.
Unit 5a. Managerial activities and administrative controls: exercise TB Infection Control Training for Managers at National and Subnational level.
White Pigeon Community Schools
RIVERFRONT TRAILS CLOSED
Final Presentation Presented By: IOE 481 Team #3
CITIZENS BLUE RIBBON COMMITTEE
Multistory Office Building
Penn Medicine Chester County Hospital
Mississippi Riverbank Project (Final Presentation) May 14, 1999
Arch205 building construction wall systems
Curtain walls Lightweight wall system installed in the exterior of building structures The name “curtain wall” derives from the idea that the wall is thin.
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Lehigh Valley Heritage Center
2007 Bond Issue Capital Improvement Program
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Project: 250 West Street, Columbus, Ohio
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Presentation transcript:

Alkek Expansion Pre-Submittal Conference October 5, 2006

Team Members Jim Waters, Project Director, Shell and Core Janet Sisolak, Project Director, Interior Build-out Pam Redden, Project Director, Clinical Operations Dan Butterwick, Chief Architect Greg Hudgins, Project Manager

Project Organization

Feasibility Study Conducted from December 2005 through July 2006

Impacts Evaluated Construction Impacts Design Impacts Operational Impacts Downstream Impacts

Construction Impacts Site Logistics/Staging Construction Access Construction Supply - Bates and Bertner Crane Placement & Removal Vibration/Noise Waterproofing Infection Control - dust Safety-dropped loads

Construction Impacts Site Logistics/Staging oCreate Contractor’s Entrance to Rotunda oRemoval of Canopies oClosing West Entrance to Rotunda

Construction Access Allow for emergency exits Keep reception desk open Keep construction traffic out of the main lobby Maintain access to Physical Therapy

Construction Impacts Construction Supply - Bates and Bertner Intermittent Lane Closures along Bertner and Bates will be required

Construction Impacts Crane Placement & Removal In existing empty staff elevator shafts

Construction Impacts Site Logistics/Staging Construction Access Construction Supply - Bates and Bertner Crane Placement & Removal Vibration/Noise Waterproofing Infection Control - dust Safety-dropped loads

Design Impacts Structure – continuation of concrete frame Use of lighter weight wall panels – fiber reinforced concrete HVAC Issues Electrical Issues Plumbing Issues Wind Tunnel Study

Impacts to Number of Beds per Floor Changes to Codes and Standards Increased Room Size Increased Toilet Size – all fully accessible Operational Improvements Additional space to accommodate Murphy Beds and to allow appropriate circulation for nursing Flexible Acuity Room Design

Current 52-Bed Floorplate

Proposed Floorplate – 40 – 44 beds

Design Impacts Maximize footprint by eliminating deep recesses at windows, put square footage back into patient room Overall appearance of the tower can be preserved

Design Impacts Shift stairs and major mechanical chases closer to elevator core, creating more support space directly adjacent to nursing unit Transition can happen at Level 13, the new mechanical floor

Elevators Infill two existing shafts for staff Create 6 new passenger cabs

Design Impacts Optimal sequence for future build-out oGrowth model may drive recommendation for build out (Inpatient vs. Outpatient vs. support) oSequence should minimize disruption to occupants as shell floors are built out.

Proposed Stacking Vacant during construction Shell

Operational Impacts Closing of Rotunda drive and west entrance Visitors - Garage 2 Valet Operations Access Flooding Exposure Discharges Patient Advocacy/Visitor Center/Porcelain Bird Collection 12th Floor/protected environment rooms PT/OT – Closure of gardens used for gait training and pet therapy

Alkek Drive and West Entrance –How can the duration be mitigated? G12 must be vacated –Potential staging area for contractor, but space must be preserved Operational Impacts Key Issues

Questions?