L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

LBNL PIXEL IPHC 2009_06_LG1 Flex Cable Development The development of the flex cable for sensor readout and control is envisioned as a 4 stage process.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,

LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
HFT & PXL geometry F.Videbæk Brookhaven National Laboratory 13/9/12.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
Project Overview Flemming Videbaek Brookhaven National Laboratory.
L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
Leo Greiner schedule Evolution of Tasks and Schedule.
Sensor and ladder and dimensions dateChangeVersionwho 3/26/2013Updated with U2 fid positions 1.1LG.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
1 Jim Thomas - LBL HFT Issues that may Bear on the Fate of the SSD & SVT presented by Jim Thomas 07/07/2006.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1FEE 2014 – STAR PXL Vertex Detector STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
G. Contin | The STAR Heavy Flavor Tracker (HFT) and Upgrade Plan Quark Matter 2015 – Kobe, Japan Session : Future Experimental Facilities,
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Status of the STAR tracking upgrade Gerrit van Nieuwenhuizen STAR Collaboration Meeting BNL, February 24, 2005.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Multiple Scattering and Sensor Thickness Preserving track extrapolation accuracy to bulk of particles at low momentum requires ultra-thin sensors and mechanical.
Jim Fast Pacific Northwest National Laboratory
HFT Overview Flemming Videbæk BNL 3/14/12 F2F LBNL.
Leo Greiner, Eric Anderssen, Howard Matis,
Face to Face Meeting – March 2012 Sarah Morgan
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber (main tracking detector in STAR) HFT – Heavy Flavor Tracker SSD – Silicon Strip Detector r = 22 cm LBNL – Jim Thomas IST – Inner Silicon Tracker r = 14 cm MIT – Bernd Surrow PXL – Pixel Detector r = 2.5, 8 cm LBNL – Leo Greiner

2IPHC meeting – May 7, 2012 L. Greiner STAR HFT Outline Existing HFT/PXL status and schedule Testing Goals at IPHC Immediate plans / discussion Possible scenarios for the near term

3IPHC meeting – May 7, 2012 L. Greiner STAR HFT Existing PXL status and schedule CD-2/3 passed September 2011 – we are a fully funded DOE construction project. Many thanks to IPHC group for years of collaboration, support and help including during reviews. Significant management overhead, reports, reviews, etc. The main task for 2012 is the construction and delivery of a three sector prototype detector by January of 2013.

4IPHC meeting – May 7, 2012 L. Greiner STAR HFT Selected HFT Tasks for the next year Installation of the new IDS pieces and new beam pipe in ~ July Production of a prototype PXL detector using complete mechanics, installation tooling, sensors, RDO system, interface to STAR. This will allow for both an in beam test of the PXL design and a measurement of the charged particle environment at low radius. The installation for the PXL prototype detector is scheduled for December The SSD and IST detectors are not scheduled to be installed until summer 2013.

5IPHC meeting – May 7, 2012 L. Greiner STAR HFT PXL tasks for 2012 We have a deliverable of a working prototype detector (3 sectors) to be installed at the end of Thus we need to produce first articles of all of the production stages for the final detector. Tasks for 2012: Production probe testing working for Ultimate sensors Cable design complete with Cu conductors New pre-production RDO (all boards) system working Full firmware and software for data-taking All mechanical designs complete and tested. Mechanical structures fabricated. Ladders => sectors fabricated + full scripted testing. Metrology Slow control system Software for tracking using metrology data Software for cosmic ray / beam testing tracking. etc.

6IPHC meeting – May 7, 2012 L. Greiner STAR HFT Steps to Prototype Detector Fix cable design (width) Fabricate cablesFix mechanical design Fabricate mech pieces Probe test sensors Fabricate ladders Fabricate sectors Testing and metrology Test ladder cable design Deliver to STAR, test and install Sensor and mechanical only. RDO, slow control, etc. not shown. Prototype detector planned to be fabricated with Ultimate 1 sensors.

7IPHC meeting – May 7, 2012 L. Greiner STAR HFT Cable testing Cable design validation is very relevant to many parts of the project; –The hybrid cable design itself is needed to fabricate ladders from a working design. –Mechanical – if additional cable width is needed we will need to re-design the mechanical parts including assembly fixturing. –Ultimate 2 submission – We wish to fully check the functioning of sensors on a ladder before submitting the next version of the sensors. A working hybrid cable design is required for most of the next production steps.

8IPHC meeting – May 7, 2012 L. Greiner STAR HFT Next Steps A design for the final cable has already been prepared assuming successful testing of the existing (one-power) design. Perhaps this is an optimistic scenario PCB shop at CERN will quote cost for initial design and wait to produce final cable design. Produce PCBs Additional testing and design steps will be discussed in MS’s talk.

9IPHC meeting – May 7, 2012 L. Greiner STAR HFT Points to return to Ultimate 2 submission schedule Additional testing plans and schedule Cable submission schedule

10IPHC meeting – May 7, 2012 L. Greiner STAR HFT STAR PXL DETECTOR STRUCTURE STAR PXL Detector 10 sectors PXL Sector 3 outer ladders 1 inner ladder Aluminum conductor Ladder Flex Cable

11IPHC meeting – May 7, 2012 L. Greiner STAR HFT Cable Structure Preliminary Design: Hybrid Copper / Aluminum conductor flex cable There are two cable regions joined by wire bonds Outer ladders have a simple rectangular driver region PCB. Inner ladders have a complex driver region PCB that incorporates a kapton flex region to allow the ladder interface connector to be routed to the top of the sector.

12IPHC meeting – May 7, 2012 L. Greiner STAR HFT STAR PXL Ladder PCBs There are 3 PCBs to produce for the STAR PXL detector ladders. Low Mass Ladder PCB – common for all ladders Outer Ladder Driver PCB – joined to low mass PCB and used for outer ladders. Inner Ladder Driver PCB – joined to low mass PCB and used for inner ladders. There are 3 outer ladders for every 1 inner ladder.

13IPHC meeting – May 7, 2012 L. Greiner STAR HFT Low mass ladder PCB TOP STACKUP BOTTOM Kapton Board material:25 µm kapton Conductor:20 µm copper Solder mask:None Silk screen: None Final thickness:TBD – 150 µm? Finish:ENIG gold plate All low mass ladder PCBs are the same design Prototypes will be copper conductor Production will be Aluminum conductor

14IPHC meeting – May 7, 2012 L. Greiner STAR HFT Outer Ladder Driver PCB TOP STACKUP BOTTOM INNER 1 INNER 2 FR-4 PREPREG FR-4 Board material: FR-4 Conductor: 1 oz. copper Solder mask: both sides Silk screen: TOP only Final thickness: 0.5 mm Finish:ENIG gold plate

15IPHC meeting – May 7, 2012 L. Greiner STAR HFT Inner Ladder Driver PCB This is a composite PCB consisting of a kapton flex PCB with FR-4 PCB additions at each end. Connector End Driver End

16IPHC meeting – May 7, 2012 L. Greiner STAR HFT Inner Ladder Driver PCB Kapton TOP/BOTTOM TOP SECTION A-B STACKUP BOTTOM Kapton SECTION A-BA B Board material:TOP/Bottom – 25 µm kapton Conductor: 1 oz. copper Solder mask: both sides Silk screen: TOP only Final thickness:TBD – 150 um? Finish:ENIG gold plate

17IPHC meeting – May 7, 2012 L. Greiner STAR HFT Inner Ladder Driver PCB Connector End Board material:TOP/Bottom – kapton Inner1/Inner2 - FR-4 Conductor: 1 oz. copper Solder mask:both sides Silk screen: TOP only Final thickness:0.5 mm Finish:ENIG gold plate TOP STACKUP BOTTOM INNER 1 INNER 2 FR-4 PREPREG Kapton

18IPHC meeting – May 7, 2012 L. Greiner STAR HFT Inner Ladder Driver PCB Driver End TOP STACKUP BOTTOM INNER 1 INNER 2 FR-4 PREPREG Kapton Board material:TOP/Bottom – kapton Inner1/Inner2 - FR-4 Conductor: 1 oz. copper Solder mask:both sides Silk screen: TOP only Final thickness:0.5 mm Finish:ENIG gold plate

19IPHC meeting – May 7, 2012 L. Greiner STAR HFT Quantities: We would like to produce a prototype detector with ≥ 3 sectors. Yield arguments suggest that we will need: 40 Low Mass Ladder PCBs 35 Outer Ladder Driver PCBs 15 Inner Ladder Driver PCBs In addition, we would like to start the process of building ladders with Aluminum conductor PCBs so we would also like: 10 Low Mass Ladder PCBs with ~25 µm Aluminum conductor

20IPHC meeting – May 7, 2012 L. Greiner STAR HFT Projected completion dates Order Ultimate sensors: September 2011 First Ladder cable in FR-4: Oct/Nov 2011 First product probe testing: January 2012 Ultimate probe testing complete: February 2012 PXL RDO ready: April 2012 First prototype sectors: August 2012 Install Prototype detector: January 2013