1 Walt Cooper – OSD CAPE Jim York – Technomics August 27, 2009 Weapon System Sustainment: Collection of Contractor Costs.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

More CMM Part Two : Details.
Transportation Estimators Association Conference Saratoga Springs, New York October 4, 2008 Procedures Guide for Right of Way Cost Estimation and Cost.
AASHTO’s Cooperative Software Development Program Trnsport User Group Meeting October 22 – 26, 2006 Portland, Maine Trnsport User Group Trnsport Task Force.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Proposed Revisions for Updating the Software Guidance in MIL-HDBK-881A: Work Breakdown Structures for Material Items OUSD(AT&L)/SSE-USC/CSSE Workshop on.
14 July 2008 Blake Ireland Industry Roundtable COMPETITIVE PROTOTYPING.
AASHTO’s Cooperative Software Development Program Trnsport User Group Meeting October 6 – 10, 2007 St. Louis, Missouri Trnsport User Group Trnsport Task.
Capability Maturity Model
Recent international developments in Energy Statistics United Nations Statistics Division International Workshop on Energy Statistics September 2012,
The program work breakdown structure (WBS) establishes the essential
Procurement Analyst Position Update Procurement Training Forum August 24, 2010.
NDIA SE Division Meeting February 13, Developmental Test and Evaluation Committee Beth Wilson, Raytheon Steve Scukanec, Northrop Grumman Industry.
N By: Md Rezaul Huda Reza n
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
UNCLASSIFIED DoD COST REPORTING OVERVIEW CSDR & EVM-CR 1.
Work breakdown structure
10 th Meeting of the UNCEEA, New York, June 2016 System of Environmental-Economic Accounting for Agriculture, Forestry and Fisheries Development.
Washington University School of Medicine Research Administrators Forum September 5, 2002.
Software System Engineering: A tutorial
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
NASA CIO Standards Activities Presentation to NASA Technical Standards Working Group June 11-12, 2007 HQ/R. Benedict.
California Statewide Prevention and Early Intervention (PEI) Projects Overview May 20, 2010.
Assessing The Development Needs of the Statistical System NSDS Workshop, Trinidad and Tobago, July 27-29, 2009 Presented by Barbados.
Radar Open Systems Architectures
OSD CAIG 1 Walt Cooper OSD Cost Analysis Improvement Group (CAIG) August 13, 2008 Weapon System Sustainment: Collection of Contractor Costs.
Defense Cost and Resource Center Contractor Cost and Software Data Reporting: An Update Ron Lile August 2005.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
State EE/RE Policy Best Practices & Next-Generation Innovations: September Meeting Feedback on overall work plan and phasing of policies September 25,
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Government Furnished Materiel Requisitions GFP Working.
1 June 18, 2008 Cost Management with Data for Costing Mort Anvari Director, Acquisition Costing (SAFM-CEA) June 18, 2008 Cost Management Panel PRICE Customer.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
Defense Standardization Program Policy Updates Steve Lowell Deputy Director Defense Standardization Program Office.
The Design Management Team Framing the Scope of Work and Learning the Roles for the LCC Team.
UNSD Recent international developments in Energy Statistics.
Life Cycle Cost Savings by Improving Reliability Dr. Charles E. McQueary Director, Operational Test and Evaluation January 15, 2009.
RADIO FREQUENCY SPECTRUM POLICY NOVEMBER Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development 2 WHAT IS SPECTRUM?
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
Presented by: Presented By: MIL-STD 881 Update Neil F. Albert MCR, LLC 26 August 2010.
Washington University Hilltop Campus Research Administrators Forum August 23, 2002.
OSD CAIG 1 OSD Cost Analysis Improvement Group and ODUSD (L&MR)/LPP and MR&MP April 26, 2007 Weapon System Sustainment: A Project to Identify Requirements.
Presented by: Presented By: MIL-STD 881 Update: NDIA PMSC Meeting Neil F. Albert MCR, LLC 4 February 2010.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Large Facilities Manual New Guidance on Cost Estimating and Analysis 2016 NSF Large Facilities Workshop Kevin Porter Large Facilities Advisor, LFO, NSF.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Mrs. Marty Evans SE Forum October 15, 2004 Institutionalizing.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
UNCLASSIFIED PSM Support to Cost Reporting 1. UNCLASSIFIED PSM Help Required 2 DoDI requires cost reporting on ALL Sustainment Contracts over.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
MIL-HDBK-502A, “Product Support Analysis”
DoD Template for Application of TLCSM and PBL
Evaluating Small Business Participation
PSM Lessons Learned Background
FINAL (Living Charter)
Small Business and Subcontracting.
A Joint Effort Between Government and Industry
Sustainment Reporting CADE Sustainment Reporting
Energy Statistics Compilers Manual
FlexFile 101 MARCH 2019.
Background and Overview
Presentation transcript:

1 Walt Cooper – OSD CAPE Jim York – Technomics August 27, 2009 Weapon System Sustainment: Collection of Contractor Costs

2 Background DoD’s philosophy and approach to weapon system sustainment has been evolving since the mid-90s –From mostly organic support with limited contractor involvement (e.g., depot maintenance) –To varying degrees and types of contractor support Requirements for O&S cost data has been largely satisfied by the Services’ respective Visibility and Management of Operating & Support Cost (VAMOSC) systems Implementation of CLS strategies has generated growing DoD demand for contract cost data that VAMOSC’s feeder databases cannot satisfy –VAMOSC feeder databases provide detail on organics costs, but – have no insight into details of contract cost

3 Example: C-17A O&S Costs Source: AFTOC, air staff Cost analysts need more visibility into contractor costs.

4 A number ACAT I programs have established sustainment contract cost reporting within the Cost and Software Data Reporting (CSDR) process administered by the Defense Cost & Resource Center (DCARC) Disparate reporting to date pending formal guidance on standard cost reporting The 2008 update of DODD mandates that reports of sustainment contractors’ costs be collected within the domain of the CSDR system –Establishment of mandatory reporting requirements are in process Background (Cont’d)

5 Establishing Mandatory Reporting Requirements Phase 1 (completed in August 2008)* –Performed by Institute for Defense Analyses for OSD PA&E and OUSD(AT&L) –Reviewed DoD policies for weapon system support and identified key issues –Researched actual field-level experiences and perspectives –Developed a conceptual framework Phase 2 and 3 (Fall 2008 to Winter 2010) –Technomics performing for OSD PA&E and DCARC –Refine and vet WBS, formats and procedures via Service/Industry workshops and OSD/Service coordination… acquire a good understanding of program- specific implementations –Address the implications of including this data in VAMOSC * Collection of Operating and Support Data from Weapon System Support Contracts, IDA, Aug L. Roark, et. al.

6 Establishing Mandatory Reporting Requirements (Cont’d) Phase 3 Details –Establish final reporting requirement inputs – WBS & definitions, Formats, DID’s –Update the “CSDR Manual”, the cost-reporting appendix to DoD M, “Department of Defense Cost Analysis Guidance and Procedures Manual” –Revise OSD CAPE “Operating and Support Cost-Estimating Guide,” specifically revisions to the cost element structure and associated cost element definitions –Prepare recommended revision to MIL-STD-881, specifically, the addition of O&S guidance that is consistent with the aforementioned OSD CAPE O&S Cost Estimating Guide revision –Prepare a recommended revision to DODI , clarifying sustainment contract cost reporting policy

7 Workshops ProgramDateLocation Participating Contractor F-22ADec 4, 08Ft. WorthLockheed Martin T-45Dec 8, 08Patuxent RiverL3 StrykerDec 10, 08Detroit Army ArsenalGD Land Systems C-17AApril 28, 09Robins AFBBoeing Global HawkApril 28, 09Robins AFBNorthrop Grumman JSTARSApril 29, 09Robins AFBNorthrop Grumman

8 8 Workshop Lessons Learned WBS –Can industry report to de facto standard DOD O&S WBS (i.e., CAPE O&S WBS)? Primary WBS issue with contractors is assignment of maintenance material cost to maintenance level… some indicate they can, others assert they can’t. CAPE/VAMOSC WBS tracks demand in units and at maintenance levels; contractors provide supply, not necessarily correlated to maintenance levels. –What WBS level best facilitates understanding of CLS costs, including product- level visibility & supply chain management visibility? Draft WBS appears to satisfy requirement –At what level of indenture does the WBS need to be tailored to commodity- specific attributes? Draft WBS appears to satisfy requirement –At what level of indenture does the WBS expose contractor proprietary information? Draft WBS appears to satisfy requirement; lower levels of indenture showing processes may be proprietary

9 9 Workshop Lessons Learned (Cont’d) Cost Elements –What are the appropriate functional labor categories? Contractors are researching, but it seems likely that CLS functional categories are different than those currently identified on DD (Current categories: Engineering, Tooling, Quality Control, Manufacturing.) –What are appropriate material cost categories? categories appropriate (Current Categories: Raw Material, Purchased Parts, Purchased Equipment, Subcontract.) –Recurring vs. non-recurring or another (e.g., fixed vs. variable) distinction by WBS? Contractors generally seem ambivalent; some stated recurring/non- recurring are workable

10 Workshop Lessons Learned (Cont’d) Non-cost elements – OPTEMPO, quantities, other –Metrics are generally available, especially for PBL contracts –In some cases, contractors maintain technical metrics databases Other –Do lower contract dollar thresholds for sustainment cost reporting make sense? No definitive response from programs as yet –Does more frequent reporting (e.g., bi-annual reports) make sense? Annual reporting followed by a final (annual) report seems most appropriate –What program criteria should there be for inclusion under the reporting requirement? Dollar threshold based, vice ACAT based

11 Next Steps Technomics, CAPE drafting reporting requirements – formats, procedures, definitions, DIDs Establishment of a Sustainment CSDR Working Group (WG) in process –Industry has requested full participation –Please contact: Technomics, CAPE present draft requirements to WG in September WG deliberates, reports to Focus Group in October. Proposed revision to CSDR Manual (DOD M-1) then formally coordinated.

12

13 Backup

14 Numerous ACAT I programs have submitted sustainment cost reporting plans to the Defense Cost & Resource Center (DCARC), which administers the Cost and Software Data Reporting (CSDR) process Disparate reporting to date pending formal guidance on standard cost reporting ProgramContractor F-119 Engine (F-22A)Pratt and Whitney F-22A Air VehicleLockheed Martin F-414 Engine (F/A-18E/F)General Electric Joint Cargo AircraftL-3 C-5M Reliability Enhancement and Re-Engining Program Lockheed Martin StrykerGeneral Dynamics V-22Bell-Boeing Lightweight Utility HeloEADS F-35 (JSF)Lockheed Martin F/A-18E/F FIRSTBoeing Background (Cont’d)

15 Workshop Discussion Topics WBS –Can industry report to a de facto standard DoD O&S WBS (i.e., 1992 or 2007 WBS contained in O&S cost guides)? –Levels of indenture What level best facilitates understanding of sustainment costs, including product-level visibility and supply chain management visibility What level provides for tailoring for commodity-specific attributes? What level best protects contractor proprietary information?

16 Strawman WBS Based on MILHDBK-881A Based on OSD CAPE 2007 O&S WBS * This element will likely require additional level(s) of indenture to provide product-oriented (e.g., subsystem, assembly, subassembly, etc.) visibility

17 Workshop Discussion Topics (Cont’d) Cost Elements –What are the appropriate functional labor categories? –What are the appropriate material cost categories? –Can recurring vs non-recurring, fixed vs variable distinctions be made? Non-cost elements, e.g, –OPTEMPO, e.g., flying hours) –Quantity, e.g., system, sub-system –Other, e.g., mean time between failures Other –What contract dollar thresholds for sustainment cost reporting make sense? –Does more frequent reporting (e.g., bi-annual reports) make sense? –What program criteria should there be for inclusion under the reporting requirement?