EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453 EuCARD-2 WP-10 Status.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

WP10.2 – status Reported by L. Bottura and C. Senatore Meeting at CERN, February 2 nd, 2014.
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Optimisation of Roebel cable for HTS accelerator magnets
HTS Coils for High Field Hybrid FCC Dipoles Ramesh Gupta March 23-27, Superconducting Magnet Division HTS Coils for High Field Hybrid FCC Dipoles.
Report from WAMHTS-2 and opportunities for HTS Naoyuki Amemiya Kyoto University 1.
Structural design of EuCARD2 magnets
EuCARD 2012 Collaboration Meeting Warsaw University of Technology 22 th April 2012 WP-7 / Task 4 Very high field magnet Introduction/objectives/partners.
Future Magnets Report from WP10
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
EuCARD2 Magnet Status and action plan
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Concepts for 20 T dipoles SnowMass Preparation J. Van Nugteren.
FCC kick-off meeting a summary for magnets L. Bottura
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
In-Field Resistance of REBCO Electrical Joints at 4.2 K
Eucard2 – WP10 Future Magnets Philippe Fazilleau & Lucio Rossi WP10 kick off meeting CERN, 14 June 2013.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
Update on Q4 DSM/IRFU/SACM The HiLumi LHC Design Study (a sub-system of HL-LHC) is partly funded by the European Commission within the Framework Programme.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10 Future Magnets.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP10- Future Magnets.
Prospects for the use of HTS in high field magnets for future accelerator facilities A. Ballarino CERN, Geneva, Switzerland.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
HTS Roebel cables for the EuCARD2 “Future Magnets”
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
Characterization of REBCO Tape and Roebel Cable at CERN
CORC®: Results and Perspectives Danko van der Laan and Jeremy Weiss
EuCARD2 WP10.2 main results and open issues
L. Bottura and C. Senatore on behalf of WP10.2 February 7th, 2017
Model magnet test results at FNAL
Lucio Rossi (CERN) WP10 coordinator
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
WP-7 / Task 4 Very high field magnet
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Roebel cables for EuCARD²: experience and options.
Naoyuki Amemiya Kyoto University
Kyoto meeting.
HTS Magnet R&D at BNL Ramesh Gupta November 17, 2017.
High-field magnets wound from CORC® cables and wires
EuCARD2 WP 10.2 HTS Conductor
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status Philippe Fazilleau and Lucio Rossi Steering Committee Meeting Frankfurt,

Progress since May 2014 Task 2 – conductor YBCO tapes: Production and test of high Jc, high-field optimized Bruker tapes with record layer Jc values (very close to target performance); two tapes obtained from Bruker, Cable dummy lengths available ; new lengths requested for insulation, thermal properties and winding tests, Production of 10 m (mid october to KIT for punching qualification tests) + 90 m (mid december for FRESCA test and Feather-M0) of YBCO tape at Bruker, Procurement of alternative materials (SuperPower, Sunam, Fujikura, Sunam, SuperOX), 100 to 200 m each. BSSCO wire: Production of new lot (lot 87) of powders completed and characterization in progress ; this lot will be delivered to NHMFL and made into 3 billets (different grain dimensions and mix), 20 m of wire produced (lot 82) to be shipped at CERN for testing, Sample preparation for transverse loading on cable started (University of Twente) Philippe Fazilleau - SC5 meeting - 2 nd of october, 2014

Progress since May 2014 task 3 - magnets Block design with stacked tapes: 2D electromagnetic design achieved, 3D design on going, Twist region configuration studies on going, Winding test set up under study (tapes block transposition, twist region mechanical support) Aligned block with Roebel cable (baseline design): 2D and 3D electromagnetic design done, End optimization done, Mechanical model of the Roebel cable achieved, Dynamics effects study within Roebel cable on going (field harmonics calculation, remnant fields) Tests on Roebel cable insulation and mechanical reinforcement on going, Quench detection: pick-up coils have been designed and realized + copper loops added (eddy current effects) study performed Sub scale model Feather M0 for quench detection and coil production tests; design done (magnetic and quench propagation), 3 models foreseen (one in SS by the end of 2014, others in SC Roebel), SC cable mi-december, Feather M2 5 T insert; CAD design on going Philippe Fazilleau - SC5 meeting - 2 nd of october, 2014

Progress since May 2014 task 3 - magnets Cosine-theta with YBCO Roebel cable: Cos theta design with 2 layers (10 mm Roebel); 2 D electromagnetic done, end optimization on-going, FE mechanical model done New proposal cos-theta 1 layer (12 mm Roebel); thicker structure, mechanical design done BSSCO canted cosine theta coil: Skew angle optimization study achieved, Mini Whale CCT coil study on going Philippe Fazilleau - SC5 meeting - 2 nd of october, mm 15.5 mm

Milestones and Deliverables due up to M20 ( ) Report no. (D/M) TitleDue dateStatus Conceptual study of HTS accelerator magnets Delayed by a few days ; drafts available at the beginning of next week then reviewed by L. Rossi and Ph. Fazilleau and sent to M. Vretenar before the end of the week (10 th of october, 2014) 10MS64 YBCO magnet design completion Philippe Fazilleau - SC5 meeting - 2 nd of october, 2014

Summary on communication Scientific papers submitted relevant to the project Attended events (with EuCARD-2 presentation) AuthorTitle L. RossiThe EuCARD-2 Future Magnets project: the European collaboration for accelerator quality HTS magnets (ASC 2014) G. KyrbyAccelerator Quality HTS Dipole Magnet demonstrator designs for the EuCARD2, 5 T 40 mm clear aperture magnet (ASC 2014) J. van NugterenStudy of Conductor Anisotropy for a Five Tesla HTS Research Magnet using a Partial-Element-Equivalent-Circuit Model of a Roebel Cable (ASC 2014) C. LorinCos-theta design of dipole inserts made of YBCO-Roebel or BiSCCo Rutherford cables (ASC 2014) E. HaroVariation of Quench Propagation Velocities in YBCO Cables (ASC 2014) T. SalmiModelling Quench Protection Heater Delays in an HTS coil (ASC 2014) M. BonuraTransversal Thermal Conductivity of REBCO Coated Conductors (ASC 2014) A.BallarinoYBCO coated conductor with optimized high field performance at 4,2 K (poster)

Summary on communication Attended events (with EuCARD-2 presentation) Upcoming events (workshops, meetings, etc.) Title of eventDateVenueOutreach event? [Y/N] AttendanceLink to event or report Workshop WAM-HTS1 « High- current HTS cables » 21 st to 23 rd of May, 2014 DESY (Hambourg) N50https://indico.cern.ch/e vent/308828/ Seminar (under sponsoring of Eucard2 and Hilumi) on “Superconducting Magnets R&D in the T range for energy frontier machines” by L. Rossi 23rd of May, 2014 DESY (Hambourg) N80http://indico.cern.ch/ev ent/308828/timetable/ # detailed Outreach talk “The frontier of the knowledge and the LHC” ( sponsoring of Eucard2) by L. Rossi 21st of May, 2014 HambourgY120Flyer

Summary on communication Upcoming events (workshops, meetings, etc.) Title of eventDateVenueLink Workshop WAM- HTS2 « HTS Magnet Technology for High Energy Physics” november, 2014 Kyoto (Japan) ch/event/319762/o verview

Program for next 6 months Task 2 - conductor YBCO tape and Roebel cable: Production of Bruker YBCO tape (100 m), Roebel cable dummy tests (insulation, thermal properties, winding tests), Tests on YBCO tapes from alternative suppliers, BSSCo wire: Characterization of lot 87 between Nexans, CERN and BSSCo collaboration Tests in EU of 20 m of wire from lot 82, Samples for transverse stress loading: tests to be performed at UniGeneva Philippe Fazilleau - SC5 meeting - 2 nd of october, 2014

Program for next 6 months task 3 - magnets Block design with stacked tapes: Operating current regarding protection scheme and blockcoil structure. Prototype of dipole magnet using CuBe twist stack tape, 3D dipole magnet design using twist stack tape considering coil-ends, Mechanical study. Aligned block with Roebel cable (baseline design): Jc (B,T,theta) fit for Bruker YBCO tape, Quench simulations with FM0 in different operation temperatures (higher temp, lower current) Thermal conductivity measurements for YBCO Roebel cable Considering different quench detection options with measurements and simulations (pick up coils, voltage taps, sensors etc.), Mechanical study (CERN/CEA 2D cross-check and 3D study) Cosine-theta with YBCO Roebel cable: single layer cos-theta design: end design (with new Roxie version), 2D mechanical study, Tooling development for winding Philippe Fazilleau - SC5 meeting - 2 nd of october, 2014

Open issues Stacked tapes: transposition issues Mechanical holding (aligned block, stacked tapes) Philippe Fazilleau - SC5 meeting - 2 nd of october, 2014