1 LIGO-G1001031-V5 LLO CDS Components Front End Computer Timing Master 18VDC18VDC I/O Extension Timing Fanout 24VDC24VDC Chassis DC Power AC VoltageAC.

Slides:



Advertisements
Similar presentations
OPTI 202L Lab #11 – Photoconductors and Basic Electrical Measurements Dr. Mike Nofziger Professor College of Optical Sciences University of Arizona Dr.
Advertisements

Install L2 Switch Head End CATV
LIGO-G V8 1 aLIGO DC Power Distribution Contents.
Services Offered by % of Respondents §Internet l World Wide Web (public) 83% l (public) 81% §Applications Software l Word Processing 88% l.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
NEW ARRIVAL POWER ELEKTRO MEGIC BOX POWER ELEKTRO ENGINEERING COMPANY (PVT) LIMITED.
1 LIGO-G V2 A Brief Discussion of Lockout-Tagout for the Wave Plate Rotation Stage Controller David Kinzel.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
SOLAR POWER SATELLITE ANNAMACHARYA INSTITUTE OF TECHNOLOGY AND SCIENCES DEPATMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING PRESENTED BY: P.AMARNATHS.ABEED.
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
Identifying SLC 500™ System Components. SLC 500 System Options  The SLC 500 line of processors comprises both fixed and modular processor styles.:
COMPONENTS REQUIRED STEP DOWN PRANSFORMER:
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Engineer Training Electronics Cabinet TJ8300 / TJ8500 Electronics Cabinet.
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
Agustoni IT Session 2 – Block 3 Barcelona May 2003 Proposal for a High Quality dc Network with Distributed Generation A. Agustoni, M. Brenna, E.
User’s Manual INSTALLATION / OPERATION 1/3 4ch or 8ch UTP Receiver (1U Rack Type) ONU - R4000 ONU - R8000.
1 LIGO-D V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
Rectification. AC to DC Electricity distribution –Power stations –Transformers –Transmission lines AC Electronics DC –Smooth –Stable.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
LIGO-G v3 March 30, aLIGO BSC ISI Electronics aLIGO BSC ISI Electronics FDR 3/30/2010 LIGO-G Ben Abbott, Brian Lantz.
1 LIGO-G V2 LLO CDS Electronics Rack Naming Scheme CDS racks are named according to site, IFO designation, subsystem use, station (location) and.
LIGO-G W eLigo PSL laser diode room strawman design Rick Savage, Anamaria Effler, Peter King.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
CIT 141 – PC/Networking Fundamentals Lee Weiner
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
CLARITY MATRIX FIBER VIDEO EXTENSION October 2015.
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Internal & External components of the computer Abby Davis.
18240 Element two - Components INPUTS OUTPUTS PURPOSE TYPICAL USE.
Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1October 2010J.LENDARO EN/STI/ECE.
Low-Energy Linac Tanks 2, 3, 4 and 5 (3 Slides). Station 7Station 3Station 5Station 4Station 2 BPM NIM BPM NIM BPM NIM BPM NIM 172 MHz 3/8” Heliax (N)
Keeping Your World Connected.  Originally established in 1983 (AESP, Inc.)  Offices/Manufacturing: –United States (Miami, Pennsylvania) –Taiwan –China.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
ORDERING INFORMATION PART NUMBER DESCRIPTION OPTICAL PWR BUDGET MAX DISTANCE (Option) PRODUCT SPECIFICATION EL – 32V2402 TX / RX LINK DIGITAL VIDEO 32CH.
Corey Hillskotter. A hard drive stores information on a hard disc that rapidly rotates.
PC COMPONENTS. System Unit Cases This is the cabinet that holds the main components of a computer. It includes a plastic front panel for aesthetic purpose.
ORDERING INFORMATION PART NUMBER DESCRIPTION OPTICAL PWR BUDGET MAX DISTANCE (Option) PRODUCT SPECIFICATION EL – 8V2202 TX / RX LINK DIGITAL VIDEO 8CH.
A PRESENTATION ON PRACTICAL TRAINING TAKEN AT BSNL, CHITTORGARH
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
BIMA Antenna Reconstruction. AntennaFarm.V3 antenna assembly lift pedestal onto base (CRANE) lift dish onto pedestal (CRANE) reinstall ladder (FORKLIFT)
Electricity in Welding Unit 212/255 – Principles of Fabrication and Welding Technology.
ORDERING INFORMATION PART NUMBER DESCRIPTION OPTICAL PWR BUDGET MAX DISTANCE (Option) PRODUCT SPECIFICATION EL – 2V2202 TX / RX LINK DIGITAL 2CH VIDEO.
FCC DIGITAL 4CH VIDEO LINK PRODUCT SPECIFICATION
Bridge Rectifier Electrical Engineering and Industrical Electronics
Eric A Lewis Enstore director
Power Monitoring – Requirements (1)
MICE RF System Power Supplies, Control and Monitoring Status report
Friendly Power Shutdown for LLO Corner Buildings
Integration – preliminary ideas on routing and tests
DIGITAL VIDEO 16CH MUX SERIES
Company Profile: Products:
Electronics – Learning Outcomes
What’s in the Box?.
May 7 About the Datacenter (hardware show and tell)
اخلاق مهندسي مهدي بهادري نژاد استاد مهندسي مکانيک-دانشگاه صنعتي شريف و عضو پيوسته فرهنگستان علوم جمهوري اسلامي ايران متن سخنان ايراد شده در جلسه انجمن.
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
FERRO Warehouse under Model 4A
Three-Phase Inverters
Draw and interpret circuit diagrams containing sources, switches, resistors (fixed and variable), heaters, thermistors, light-dependent resistors, lamps,
Rectifiers.
Presentation transcript:

1 LIGO-G V5 LLO CDS Components Front End Computer Timing Master 18VDC18VDC I/O Extension Timing Fanout 24VDC24VDC Chassis DC Power AC VoltageAC Voltage Chassis Mass Storage Room (MSR) Operator Control Room (OCR) CDS Electronics Room (CER)CER Laser Diode Room (LDR)LDR CDS Power Room (CPR)CPR Field I/O Cables Timing Distribution Cables DC Power Racks Field Satellite Racks Subsystem Electronics Racks Front End Racks Fiber Optic Cables DC Extension Cables Field DC Extension Cords Computer Users Room (CUR) Racks and Rooms (RAR) LVEA Racks (LVEA) X-End Racks (X-End)X-End Y-End Racks (Y-End)Y-End Electronics Test Racks (ETR)

CDS Electronics Room (CER) Rack Layout 2 LIGO-G V5

3 Laser Diode Room (LDR) Rack Layout LIGO-G V5 CDS Power Room (CPR) Front L1-VDC-C5 L1-VDC-C7 L1-VDC-C1 L1-VDC-C2 L1-VDC-C3 L1-VDC-C4 L1-VDC-C6 2feet2feet Each Rack is 39” Deep and 24” Wide Laser Diode Room (LDR) Changing Room 480V Distribution Panel 208V Distribution Panel DC Supplies 2feet2feet 208V Distribution Panel – CDS1 208V Distribution Panel – CDS2 LDR Chiller L1-LDR-C2 L1-LDR-C1 2 feet Transformer

4 CDS Power Room (CPR) Rack Layout LIGO-G V5 Transformer 2feet2feet Each Rack is 39” Deep and 24” Wide 2 feet Laser Diode Room (LDR) Changing Room 480V Distribution Panel 208V Distribution Panel DC Supplies 2feet2feet 208V Distribution Panel – CDS1 208V Distribution Panel – CDS2 LDR Chiller L1-LDR-C2 L1-LDR-C1 CDS Power Room (CPR) Front L1-VDC-C5 L1-VDC-C7 L1-VDC-C1 L1-VDC-C2 L1-VDC-C3 L1-VDC-C4 L1-VDC-C6

5 CDS Electronics Room X-End (CERX) Rack Layout LIGO-G V5 (L1-FAC-XC1)L1-FAC-XC1 CERX (L1-VDC-XC1)L1-VDC-XC1 (L1-VDC-XC2)L1-VDC-XC2 (L1-DAQ-XC1)L1-DAQ-XC1 (L1-SEI-XC1)L1-SEI-XC1 (L1-SUS-XC1)L1-SUS-XC1 (L1-SUS-XC2)L1-SUS-XC2 (L1-TCS-XC1)L1-TCS-XC1

6 CDS Electronics Room Y-End (CERY) Rack Layout LIGO-G V5 CERY (L1-VDC-YC1)L1-VDC-YC1 (L1-VDC-YC2)L1-VDC-YC2 (L1-DAQ-YC1)L1-DAQ-YC1(L1-SEI-YC1)L1-SEI-YC1 (L1-SUS-YC1)L1-SUS-YC1 (L1-SUS-YC2)L1-SUS-YC2 (L1-TCS-YC1)L1-TCS-YC1 (L1-FAC-YC1)L1-FAC-YC1