www.itexpo.com October 10-13, 2006 San Diego Convention Center, San Diego California Communications Continuity Planning Maintaining communications in.

Slides:



Advertisements
Similar presentations
October 10-13, 2006 San Diego Convention Center, San Diego California VoIP/SOA Integration Impact on IT Apps, Processes, & Overall Business.
Advertisements

1/17/20141 Leveraging Cloudbursting To Drive Down IT Costs Eric Burgener Senior Vice President, Product Marketing March 9, 2010.
FMS. 2 Fires Terrorism Internal Sabotage Natural Disasters System Failures Power Outages Pandemic Influenza COOP/ Disaster Recovery/ Emergency Preparedness.
Mobile Emergency Operations Center Presented by: Dr. Steven G. Sachs, VP of Instructional and Information Technology Aaron M. Raffle, Director of IT Project.
University of Baltimore Telecommunications Technology
Unisys Mobile CommHub – Inventing the Future Presented by: Edward Minyard, ITIL Partner Global Infrastructure Services.
Douglas Bass, Director Office of Emergency Management Fairfax County, VA.
Which server is right for you? Get in Contact with us
1 IPAWS: The Integrated Public Alert and Warning System.
CSE 6590 Department of Computer Science & Engineering York University 1 Introduction to Wireless Ad-hoc Networking 5/4/2015 2:17 PM.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Satellite Communications Systems and Emergency Communications Dr. Joseph S. Bravman Omnisat, LLC December 12, 2005.
Business Continuity & Disaster Recovery Planning at The Chicago Board of Trade Presented By: Bryan Durkin Sr. Vice President The Chicago Board of Trade.
Disaster Emergency Management BY: ELLIAS NARDINI INTERNATIONAL REPRESENTATIVE & GENERAL AGENT APPLIED TRAINING SOLUTIONS, LLC 8527 CHASE GLEN CIRCLE FAIRFAX,
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
Copyright Kenneth M. Chipps Ph.D. 1 VPN Last Update
APCO Australasia Conference 2011 The Building Blocks of Mission Critical Mobile Data Solutions Brett Abraham General Manager - Sigtec Critical Communications.
A mateur R adio E mergency S ervices & D isaster S ervices T echnology.
Improving Customer Satisfaction Through Advances in Remote Management Technology Greg Michel Product Manager Quintum Technologies Inc.
1 CCM Deployment Models Wael K. Valencia Community College.
Business Continuity and You! The Ohio State University Business & Finance Enterprise Continuity Program Quarterly Update October 2008Business and Finance.
Services Tailored Around You® Business Contingency Planning Overview July 2013.
Module/Subject #/title here Copyright Objectworld Communications Corp. SIP Trunking Seminar Series In conjunction withSponsored by TMC San Diego, CA Oct.
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
November 2009 Network Disaster Recovery October 2014.
Large Enterprise with Multiple Locations Source: Avaya.
Survivability Considerations for Design of Government Private Wireless Networks Clay Whitehead Motorola Networks and Enterprise.
CURRENT VIEW Over 300 different, isolated, independent systems No recovery options when systems fail Over 200 sites with NO onsite systems but only expensive,
Barracuda Load Balancer Server Availability and Scalability.
1 Leveraging the Power of Wireless to Drive BCP Effectiveness Paul Auchincloss Director, Financial & Professional Services Nextel Communications, Inc.
ENP Study Group Disaster Planning Session #6 BROUGHT TO YOU BY: THE FLORIDA NENA EDUCATION COMMITTEE.
Disaster Recovery Technologies, Systems & Services Disaster Recovery Technologies, Systems & Services What technology allows us to do.
IT Business Continuity Briefing March 3,  Incident Overview  Improving the power posture of the Primary Data Center  STAGEnet Redundancy  Telephone.
PART 2: Product Line. Tenor Switches & Gateways Tenor AX Series Solution For Medium to Large Enterprises  Available in 8, 16, 24 and 48 port Available.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 FCC-NTIA Joint Advisory Committee on Communications Capabilities of.
New Facilities & Disaster Recovery Solutions 0 February 20, 2007 Agency IT Resources Communications Exchange Meeting Facilities and Disaster Recovery Solutions.
Tools of the Trade: Building the Business Case and Legacy System Integration Presented by: Jerry Keely Customer Service Administrator.
Presentation by Paul Vine In partnership with Version Sabre and Business Continuity Planning.
October 10-13, 2006 San Diego Convention Center, San Diego California Making the Case for Hosted IP-PBX It’s the economy…and it’s not stupid.
©2006 Merge eMed. All Rights Reserved. Energize Your Workflow 2006 User Group Meeting May 7-9, 2006 Disaster Recovery Michael Leonard.
The Rhino TM Box The All Weather Electronic Enclosure tough enough to meet your Mission Critical Communications Requirements anywhere, anytime. Designed.
Infrastructure Security Leveraging the ITS Experience Base Presented at ITS America Commercial Vehicle and Mobility Forum K.K Saxena, CCP Principal Kimley-Horn.
D2-01_12 Disaster resilient telecommunications systems for smart grid in Japan Atsushi Ohara Shikoku Electric Power Co., Inc. Japan
October 10-13, 2006 San Diego Convention Center, San Diego California Learning to Embrace Hosted VoIP TM
October 10-13, 2006 San Diego Convention Center, San Diego California High Availability Corporate Faxing Disaster Recovery and Business.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
October 10-13, 2006 San Diego Convention Center, San Diego California SIP Trunking… Why is it so important?
October 10-13, 2006 San Diego Convention Center, San Diego California Effective Deployment and Migration Strategies Leigh Fatzinger, VP.
Visual 6.1 Unified Command Unit 6: Unified Command.
Page 1 Unclassified _NB_Next Steps.ppt Phillip E. Paulsen Space Communications Office NASA Glenn Research Center (GRC) Cleveland, Ohio 6 November.
October 10-13, 2006 San Diego Convention Center, San Diego California Extending the Value of Your VoIP Investment to Business Applications.
October 10-13, 2006 San Diego Convention Center, San Diego California Learning to Embrace Hosted VoIP Friday, October 13, :15 p.m.
EGEE04 Pisa 27 Oct Planning for emergencies Grid security, just another case for emergency preparation? Pål S. Anderssen CERN - IT.
Emergency Data Collection The Easton Tornado-2004 Adams County, WI.
HASTILY FORMED NETWORKS “A Perspective” I MARINE EXPEDITIONARY FORCE SCIENCE & TECHNOLOGY (COMMUNICATIONS) Mr Rick Wolf
Hosted Voice & Hosted Contact Center
ARCHITECTURE ENGINEERING COMMUNICATIONS TECHNOLOGY AVIATION | CIVIL | CONSTRUCTION SERVICES | DATA SYSTEMS | ENVIRONMENTAL FACILITIES ENGINEERING | GEOSPATIAL.
Communications and Networks 2 Compiled by Maududie Reference: Practicum Module Application Training Institut Teknologi Bandung
Business Continuity Disaster Planning
ROI for VoIP in the Enterprise A business case for Zultys VoIP Solutions.
Networks Unit 5 Digital Literacy Computer Technology (S3 Obj 2-1, 2-2 & 2-3)
Qwest Communications Disaster Preparedness Overview 2003.
Introduction to the Emergency Operations Center City of Santa Cruz 2011 EOC Training and Exercise.
KeepItSafe Solution Suite Securely control and manage all of your data backups with ease, from a single location. KeepItSafe Online Backup KeepItSafe.
October 4-7, 2004 Los Angeles, CA E9-1-1 In a VoIP World Timothy Lorello SVP, Chief Marketing Officer TeleCommunication Systems (TCS) (410)
October 10-13, 2006 San Diego Convention Center, San Diego California Staging and Cutting Your IP PBX “The Install”
Veeam Backup Repository
Tailor slide to customer industry/pain points
Business Contingency Planning
Presentation transcript:

October 10-13, 2006 San Diego Convention Center, San Diego California Communications Continuity Planning Maintaining communications in the event of a disruption of normal operating environments Todd Landry Senior Vice President Sphere Communications

October 10-13, 2006 San Diego Convention Center, San Diego California First of all, the key Word is Planning

October 10-13, 2006 San Diego Convention Center, San Diego California Who Needs to Think about This? Early Responders, naturally. However, Communications Continuity should be a key part of enterprise operational plans. Here are ways to think about your planning…

October 10-13, 2006 San Diego Convention Center, San Diego California Communications Continuity Readiness Measuring your Readiness Level Level 5 – Redundant Deployable Offsite Communications – Within the Hour Response –Inventoried/Online Deployable Communications System –Multiple pre-arranged media for terrestrial network connectivity –Preconfigured deployment scenarios & configurations –Actively replicated offsite database on active deployable system Level 4 – Redundant Offsite Communications – Within the Day Response –Access to Deployable Communications System –Alternate medium for terrestrial network connectivity –Preconfigured scenarios & deployable database configurations Level 3 – Alternate Communications – Next Day Response –Shared continuity facilities – Home office/leased office –Call re-routing plans aligned with key employee identification –Hosted / Second facility call handling servers actively handle failover Level 2 – Facility/System Failover – Immediate/Transparent Operation –Distributed communications databases, with automatic failover methods (no central fail points) –Automatic route handling with multiple options among facilities & to external networks –Redundant systems (servers), with distribution of servers –Alternate power for main systems and communication devices Level 1 – Basic Situational Response & Resiliency – Minimum Requirements –E911 Configurations Registered with PSAP –Priority personnel set for guaranteed access to communications ports –Call override options to guarantee emergency barge-in on calls –System vulnerability certifications (Certain Government standards provide) Transparent, Handled by Systems Non-Transparent, Requires Systems & People

October 10-13, 2006 San Diego Convention Center, San Diego California Planning for Business Disruption Systems should do most of the Work Enterprise IP Network Enterprise IP Network Enterprise IP Network Wide Area Network Office Location Office Location Office Location Enterprise IP Network Office Location Office Location Office Location P P P P P P P P PP P P P P P = PSTN PSTN Connectivity Disruption P Wide-area Link Disruption PBX Server Disruption Complete Facility Disruption Help! Employee Health Disruption Level 1 Level 2 Level 3,4 or 5

October 10-13, 2006 San Diego Convention Center, San Diego California Alternate Communication – Level 3 Leveraging other Facilities Enterprise IP Network Enterprise IP Network Wide Area Network Office Location Office Location Office Location Enterprise IP Network Office Location Office Location Office Location P P P P P P P P Enterprise IP Network PP P P P P Complete Facility Disruption

October 10-13, 2006 San Diego Convention Center, San Diego California Deployable Communications Actively Replicated Database Enterprise IP Network Enterprise IP Network Wide Area Network Office Location Office Location Office Location Enterprise IP Network Office Location Office Location Office Location P P P P P P P P Enterprise IP Network PP P P P P Emergency Interoperable Deployable Systems

October 10-13, 2006 San Diego Convention Center, San Diego California Deployable Communications Actively Replicated Database Enterprise IP Network Enterprise IP Network Wide Area Network Office Location Office Location Office Location Enterprise IP Network Office Location Office Location Office Location P P P P P P P P Enterprise IP Network PP P P P P Emergency Interoperable Deployable Systems Complete Facility Disruption

October 10-13, 2006 San Diego Convention Center, San Diego California Deployable Communications Multiple Connectivity Options WAN

October 10-13, 2006 San Diego Convention Center, San Diego California “Let’s be safe out there.” Sgt. Phil Esterhaus (Michael Conrad) Hill Street Blues

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™ and its contributions to emergency interoperable communications Welcome to PacStar™ and its contributions to emergency interoperable communications

October 10-13, 2006 San Diego Convention Center, San Diego California Jake Schmidt VP Business Development PacStar

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™: Response to unique Central Ohio Area emergency needs

October 10-13, 2006 San Diego Convention Center, San Diego California Case Study: F4 Tornado Situation: On Friday, Sep. 15, 2006 at 4:25 p.m. Eastern Daylight Time, an F4 tornado rips a 1/2 mile wide path through most of central OH. Electrical power, telephone lines, cell and microwave towers, and major transportation pathways are disrupted. Satellite dishes are also down. All existing communications systems have fallen silent.

October 10-13, 2006 San Diego Convention Center, San Diego California Case Study: F4 Tornado Situation: All communications systems are down… What’s next?

October 10-13, 2006 San Diego Convention Center, San Diego California Local Government Prepared? Disaster Response Scenario Police LMR Field Command Post Incident Site Franklin County EOC, Columbus Internet PSTN Cell Phone VoIP/Analog Phone Internet Data Cellphone users at EOC to coordinate directly with Incident Sites on Police and Fire LMRs Incident Site

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™ 5500: Fully Certified and Tested  Tested in DICE Exercise for DISA/JITC System Certification February / March ’06  Accelerated JITC certification via TISP Program  Tested in JUICE ’05 (Joint User Interoperability Communications Exercise) supporting CECOM  EA-TJTN and CERDEC  MIL-STD-810F tested for heat, shock, and vibration

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™ 5500: Rapid Deployment In Under An Hour  The red button enables rapid 8 minute set-up  Integrated IQ-Core™ Software facilitates interoperability  Create thumb-driven configurations  Quickly add additional users  Minimal training and IT staff required  Clear, simple manuals and wizards  Redundancy for continuity of operations  Promptly deploys in infrastructure-starved environments

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™ 5500: Compact and Portable  Total weight <300 lbs  2-person lift  Easily fits into typical SUVs and mini-vans  Transportable via commercial freight with no restrictions Quickly deploy in infrastructure- starved environments to support:  Command and control  Training/exercises  Logistics deployment  Continuity of Operations Requirements  Any other needs requiring team communications and data

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™ 5500: PacStar™ 5500: Ruggedized Construction MIL-STD 810F –Operating shock and transport rated Approaches –Internal reinforced chassis –Supply chain modifications –Internal mounting reinforcement –Cable reinforcement Version 3.0 structure under development Patent pending

October 10-13, 2006 San Diego Convention Center, San Diego California PacStar™ emergency interoperable communications solution: Key Benefits: – A total solution enabling communications in – infrastructure starved environments – Proven in the “battlefield” – Certified to military standards – Deploys within an hour – Compact & Portable – Integrated Management Software provides: Ease of use Quick Configurations Simplification of complex and difficult tasks Reduces need for expertise, support and training – Unparallel ruggedized construction