1 LBT Q2 2007 Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.

Slides:



Advertisements
Similar presentations
THAI TOKO ENGINEERING CO.,LTD.
Advertisements

PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Basic Electric for heating What is Electricity?
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
PURBECK RAILWAY CIRCLE
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Architecture & Construction PREPARING FOR COLLEGE, CAREER AND CITIZENSHIP
Change Request Routing from the CUB (H01) to D04, D07, D08, E04 for the DMSC network. Routing from the CUB (H01) to D04, D07, D08, E04, G02, G04, F03 for.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Proposed LBT Instrument Facility Enclosure OSU MODS.
Topic1b: Project Life Cycle
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
SC Project Review of NCSX, April 8-10, 2008 S. Ramakrishnan - 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PWR System April
LBT Q Eng/SW Review MCSC – Mount Control System.
QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
NA62 CV activities Piero Valente 5 th September
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
E4 HVACR Electrical Installation
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
LBT Q Engineering Review ENGG – Engineering General.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
E4 HVACR Electrical Installation
TECHNICAL SPECIFICATION AND REQUIREMENTS
IMPACT BUSINESS MODEL CANVAS
E4 HVACR Electrical Installation
New telescope projects
Load Balancing: List Scheduling
SELL ETA Special Good Through April.
P10452 Dresser Rand Compressor Installation and Utilization
Load Balancing: List Scheduling
Presentation transcript:

1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring

2 Highlights (Q2/2007) Instrument room power installed by contractor Instrument room power installed by contractor Machine shop moved to level 3L Machine shop moved to level 3L Power to 3L installation complete Power to 3L installation complete Materials being purchased for power additions to level 4 to support LUCIFER and LINC Materials being purchased for power additions to level 4 to support LUCIFER and LINC Power monitoring continuing Power monitoring continuing Monitoring PF on incoming switch gear Monitoring PF on incoming switch gear Phase imbalance noted on several 3 phase panels Phase imbalance noted on several 3 phase panels Phases balanced on telescope UPS power Phases balanced on telescope UPS power

3 Open Issues Technical Technical Rebalance 3 phase panels Rebalance 3 phase panels Persistent ground problem on telescope, no isolated neutrals in instrumentation electronics, suspect surge suppressors Persistent ground problem on telescope, no isolated neutrals in instrumentation electronics, suspect surge suppressors PEPSI power requirements at bridge connection point PEPSI power requirements at bridge connection point Schedule Schedule Scheduled for Q3 or Q4 Scheduled for Q3 or Q4 Financial Financial Cost of materials for level 3 additions for instrument power, specifically cryo-cooler compressors Cost of materials for level 3 additions for instrument power, specifically cryo-cooler compressors Resource Resource Time to implement design Time to implement design

4 Progress (Q2/2007) Installation of the instrument room nearing completion Installation of the instrument room nearing completion Power to level 3L machine shop complete Power to level 3L machine shop complete Planning for level 4 power expansion parts identified Planning for level 4 power expansion parts identified Phases on telescope UPS power balanced Phases on telescope UPS power balanced

5 Planning (Q3/2007) Finish organizing machine shop Finish organizing machine shop Order materials for level 4 power expansion and start installation Order materials for level 4 power expansion and start installation Install connection point power for PEPSI at bridge location Install connection point power for PEPSI at bridge location Continue monitoring power quality Continue monitoring power quality Balance phases on level 1 UPS Balance phases on level 1 UPS