Idaho National Engineering and Environmental Laboratory Lessons From the PAST Will Save TOMORROW Desiree Reagan November 7, 2003.

Slides:



Advertisements
Similar presentations
EzQMS incorporates easy access to your companys: –Quality Manual –Procedures –Corrective and Preventative Action –Work Instructions.
Advertisements

RABNENA. 2 RABNENA Interfaces Frontend Interface The frontend components provide the information retrieval/browsing functionalities, and are available.
Software Quality Assurance Plan
1 NMDPS-MTPD ENHANCED ELECTRONIC SCREENING. 2 Project Overview  Introduction  The NM Motor Transportation Police are manually entering License Plates.
Idaho National Engineering and Environmental Laboratory What is a Framework? Web Service? Why do you need them? Wayne Simpson November.
Introducing SysAid 5.1 New Features. 12/ 2 Content New Knowledgebase and FAQ abilities Improved Search Additional protocols Improved history and.
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
System Construction and Implementation Objectives:
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2005 AASHTO TUG Field Management TAG Daytona Beach, Florida.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Midterm Presentation. iSecurity Project Team Presentation Contents Background Goal Project work breakdown The work so far Future targets User Perspective.
Background Current Status Future Plans. Agenda Background First Steps Current Status Future Plans Joomla Basics Questions 2.
1 of 2 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Configuration management. Reasons for software configuration management  it facilitates the ability to communicate  status of documents, coding, changes.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Getting the Most Out of Blue Mountain RAM
Laboratory Information Management Systems (LIMS) Lindy A. Brigham Div of Plant Pathology and Microbiology Department of Plant Sciences PLS 595D Regulatory.
Final Design and Implementation
Workflow Solutions for Business Users and Knowledge Workers November 30th, 2010 Brendan Giles, PMP, MCP.
Content Management Systems A content management system is software that loads on your web host’s server and manages all content on your web site dynamically.
Release & Deployment ITIL Version 3
Page 1 Copyright Jill M. Forrester This work is the intellectual property of the author. Permission is granted for this material to be shared for.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Software Design and Development Tool. The quality of our products come as result of the more of 50 successful years of combined experience of our technical.
Security Guide for Interconnecting Information Technology Systems
CSCI ClearQuest 1 Rational ClearQuest Michel Izygon - Jim Helm.
Terminal Services in Windows Server ® 2008 Infrastructure Planning and Design.
Vireo: The TDL Solution to Electronic Thesis and Dissertation Submission and Management Brought to you by the Texas Digital Library
GOODWILL OF NORTHWEST NORTH CAROLINA, INC. EMPLOYEE TRAINING DATABASE PROTOTYPE.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Federation of Tax Administrators Technology Conference Tax Systems Integration Initiatives Federation of Tax Administrators Technology Conference Tax Systems.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Workflow and SharePoint Presented by Ben Geers. Overview What is workflow? Windows Workflow Foundation How does workflow apply to SharePoint? WSS v3 vs.
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
Invitation to Computer Science 5th Edition
Eprints Open Source Document Repository Henok Mikre ORNL and University of Tennessee Summer Intern 1.
Pass SOX security audits and Improve XA security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
Environment for Information Security n Distributed computing n Decentralization of IS function n Outsourcing.
Chapter 7 IS630. Project Design  Technical Design & Specification Network and System Architecture & Design Software System Architecture & Design  Database.
CONTRACT MANAGEMENT More commonly know as CONTRACT ADMINISTRATION “the process that provides the oversight required to ensure that both parties follow.
FLOOR CANDY.
CSI-MAXIMUS, Inc CSI Comprehensive Service & Support Implementing the CSI Way.
Microsoft.com/publicsector Records Management Microsoft Records Management for Government Agencies.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Waste Management Inspection Tracking System (WMITS)
Going Green & Saving Green With DocLink THE LEADER IN MID-MARKET ENTERPRISE DOCUMENT MANAGEMENT SOLUTIONS Presented by Tiffany Campbell, Altec.
MasterCard Global Marketing Center An Alfresco Case Study Jay Mandel, MasterCard International Mike Vertal, Rivet Logic Corporation 15 November 2012.
The Records Management Vision The Records Management Vision: Our Journey Towards Solutions for Everyday Life Ronald G. Smith, CRM Records and Information.
E-Procurement Solution for the Northern Ireland 1 Contract and Project Management Solution for the Northern Ireland.
«My future profession»
IS Development Methodology
Supportability Design Considerations
NOAA Transition to New Direct Readout Systems for JPSS Presented to CGMS-44 Working Group 1, agenda item 3.2.
PLM, Document and Workflow Management
OVERVIEW PRESENTATION
Software Configuration Management
Executive Sponsor: Marcos Trujillo, Acting Division Director
Systems Construction and Implementation
System Construction and Implementation
Systems Construction and Implementation
I&C requirements and configuration management
Joint Application Development (JAD)
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

Idaho National Engineering and Environmental Laboratory Lessons From the PAST Will Save TOMORROW Desiree Reagan November 7, 2003

Idaho National Engineering and Environmental Laboratory Purpose To share experience of implementing an application developed at the INEEL with another DOE site

Idaho National Engineering and Environmental Laboratory Agenda About the application: Lessons Learned System Yucca Mountain Project Implementation at YMP OUR Lessons Learned

Idaho National Engineering and Environmental Laboratory About the application: Lessons Learned System Provide a way to document safety-related lessons learned and best practices, with easily retrievable information Workflow –Submittal (offline) –Information entry Verify Clarify Categorize –Approval –Searching/Reporting –Administration

Idaho National Engineering and Environmental Laboratory About the application: Lessons Learned System (cont’d) Application components –Database-driven –Integration with other applications –User feedback capability –Automated authentication –User maintainability –Document upload/additional reports –Customizable search –Program audit information

Idaho National Engineering and Environmental Laboratory Yucca Mountain Project INEEL/YMP agreement YMP’s Lessons Learned application

Idaho National Engineering and Environmental Laboratory Implementation at YMP Conference calls –Application overview –Technical requirements Hardware Software –Determine necessary modifications Employee data Special reports –Determine implementation methodology Modifications Installation/Testing Follow-up support

Idaho National Engineering and Environmental Laboratory OUR Lessons Learned Documentation –Written –Programmatic KISS Sharing is good! –YMP cost savings estimated at ~$210K –Information – 1800 items transferred to YMP Understand server configuration –Document process –Licensing issues