18 Month Review Meeting Project #033902 Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management Josh Reiss,

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Advertisements

FCMAT Response & Preparation: Process Outline October 25, 2006.
Alvis status report: Index DataMike Taylor Alvis status report: Index Data Check out the exciting things to come! 1. Technical contribution.
© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Enrich the lexicons for the 1 st domain based on partners remarks.
Why, what were the idea ? 1.Create a data infrastructure, 2.Data + the knowledge products that are produced on the basis of data a) Efficiant access to.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Spring Depository Library Council March 31, 2008 U.S. Government Printing Office FDsys Update.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
ISSUES TO CONSIDER IN YOUR PROJECT This is a short presentation from issues discussed in a meeting of MCS3 on Tues 2 nd March 2004.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP3 – Retrieval systems.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation Josh Reiss, Project Coordinator Betty.
RUP Fundamentals - Instructor Notes
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Universität Innsbruck Leopold Franzens  Copyright 2007 DERI Innsbruck EASAIER 18 Month Coordination Meeting, Tel Aviv, Israel WP 2 – Media.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
NAVCA Quality Award Andrea Allez Performance Improvement Manager Excellent service for local groups.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
Electronic Engineering Department Final Year Projects September 2008.
26 June 2008 DG REGIO Evaluation Network Meeting Ex-post Evaluation of Cohesion Policy Programmes co-financed by the European Fund for Regional.
A Web for the Social Sciences Building on a distributed model where data and resources are stored and maintained locally For the end user the system will.
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Implementation of PSC’s conclusion during the 2 nd meeting.
GRID IIII D UK Particle Physics GridPP Collaboration meeting - R.P.Middleton (RAL/PPD) 23-25th May Grid Monitoring Services Robin Middleton RAL/PPD24-May-01.
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Quality Strategy June 10, 2009 Presented by: Debby McNamara, LCSW, PMP Quality Coordinator, AHCA.
WP4 – Sound Object Identification WP5 – Enriched Access Tools.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP2 – Media Semantics and Ontologies.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
PROJECT LIFECYCLE.
Free Powerpoint Templates Page 1 Free Powerpoint Templates FP7 – Secure Enterprise Remote Banking System (SERBS) Small or medium scale focused research.
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
The GriPhyN Planning Process All-Hands Meeting ISI 15 October 2001.
EASAIER Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Ying Ding.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
NCSR “Demokritos” Institute of Informatics & Telecommunications CROSSMARC CROSS-lingual Multi Agent Retail Comparison Costas Spyropoulos & Vangelis Karkaletsis.
A Resource Discovery Service for the Library of Texas Requirements, Architecture, and Interoperability Testing William E. Moen, Ph.D. Principal Investigator.
State of Georgia Release Management Training
Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital representation of health data to improve disease diagnosis and treatment.
GROUP PresentsPresents. WEB CRAWLER A visualization of links in the World Wide Web Software Engineering C Semester Two Massey University - Palmerston.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Review Preparation Meeting of the FP7 Project J-AGE Vienna 25th March 2015.
WP1: Plan for the remainder (1) Ontology –Finalise ontology and lexicons for the 2 nd domain (RTV) Changes agreed in Heraklion –Improvement to existing.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
E-ARK Co-ordinators Report Current status and way forward #earkproject Janet Delve / Kuldar Aas / Clive.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
ICT Smartcities 2013 FP7-SMARTCITIES-2013 WP6 – Project Management OPTIMising the energy USe in cities with smart decision support system (OPTIMUS) Objective.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
AMICI WP1 – Management, coordination and dissemination
DataGrid Quality Assurance
StratusLab Project Status
WP1 Video analysis and annotation WP5a Architecture and Interfaces
Overview of the FEPAC Accreditation Process
AMICI WP1 – Management, coordination and dissemination
e-Invoicing – e-Ordering 20/11/2008
Presentation transcript:

18 Month Review Meeting Project # Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management Josh Reiss, Project Coordinator Betty Woessner, Project Administrator

18 Month Review Meeting Project # Eighteen Month Meeting Schedule - Thursday DateTimeParticipantWP title WP participation Thursday Nov 22nd 9:00-9:30Introduction & Presentation of Project Participants 9:30-10:30QMULWP1 Management3,4,5,6,7 10:30-12:00LFUI WP2 Media Semantics and Ontologies 3,4,7,8 12:00-13:30Lunch 13:30-15:00 Jewish National University Library (invited) Expert User Advisory Board 15:00-16:30ALLWP3 Retrieval Systems2,4,7,8 16:30-18:00NICE WP4 Sound Object Representation 3,5,7,8 Dinner

18 Month Review Meeting Project # Eighteen Month Meeting Schedule - Friday DateTimeParticipantWP leadWP participation Friday Nov 23rd 09:00-10:30DITWP5 Enriched Access Tools3,4,7,8 10:30-12:00SILOGICWP6 Intelligent Interfaces2,7,8 12:00-13:30Lunch 13:30-15:00RSAMD WP7 Evaluation & Benchmarking 2,4,6,8 15:00-16:00QMUL WP8 Dissemination & Exploitation 3,4,5,6,7 16:00-16:30Review of the minutes

18 Month Review Meeting Project # Project Schedule, WP1-4

18 Month Review Meeting Project # Project Schedule, WP5-8

18 Month Review Meeting Project # Type of deliverable:  R = Report  P = Prototype  D = Demonstrator  O = Other Deliverables- Part 1 #TitleMonthTypeLevel D8.1Public website and promotional brochure1DPU D1.1Quality assurance protocols & policies3RCO D3.1Retrieval system functionality & specifications6RRE D5.1Prototype of looping and marking modules9RPU D7.1initial user requirements & evaluation procedures9RPU D1.2management, financial & activity reports12RCO D4.1Prototype segmentation, separation & speaker/instrument identification system 14PPU D3.2Prototype speech, music retrieval systems w/ vocal query interface20PPU D1.3management, financial & activity reports24RCO D2.1metadata management infrastructure & ontology language for media objects 24RPU Dissemination level:  PU = Public  RE = Restricted group specified by consortium+ Commission.  CO = Confidential, for consortium + Commission.

18 Month Review Meeting Project # Type of deliverable:  R = Report  P = Prototype  D = Demonstrator  O = Other Deliverables- Part 2 Dissemination level:  PU = Public  RE = Restricted group specified by consortium+ Commission.  CO = Confidential, for consortium + Commission. #Deliverable titleMonthTypeLevel D3.3Prototype on cross-media retrieval system26PPU D4.2Prototype transcription system27PPU D5.2Time stretching modules w/ synchronized multimedia prototype27PPU D8.2Demonstator of deployed access tools27DRE D4.3Final report on sound object representations30RPU D5.3Final Enriched Access Tools report, with sound enhancement30RPU D6.1Aligned cross- and multi-media interface report30RPU D7.2Report on formal evaluations and deployment30RPU D8.3Final Plan for Dissemination and Use of Knowledge30RCO D1.4Final Public Report30RPU D1.5Mandatory Final management, financial and activity reports30RCO

18 Month Review Meeting Project # Deliverable Procedure & Guidelines  WP Team Leader  Gather inputs from partners  Notify coordinator of conflicts between partners  lack of communication, delays…  Organise inputs into consistent, detailed, formatted document  Supplement with additional material, Incorporate summary, references, conclusions, etc.  Communicate with partners for editing, comments, criticism, suggestions  Deliver document to Coordinator 1 month before deadline  Implement changes & resend document atleast 1 week before deadline  Coordinator  Receive document at least 1 month prior to deadline  Assist in resolution of conflicts between partners  Edit document & provides comments, criticism, suggestions  Provide supplementary material to WP Team Leader  Receive revised document from Team Leader 2 weeks before deadline  Deliver document/prototype to Commission Edit & Revision cycles may occur more than once

18 Month Review Meeting Project # WP1 Milestones Status reports & Co-ordination meetings 1.1 Private website deployed (M1) 1.2 Basic development tools; user groups; content databases; first scientific achievements; tentative dissemination & use plan; self-assessment & workplan specification (M6) 1.3 Disseminate scientific developments; revised user-feedback methodology & workplan, software progress update (M12) 1.4 Internal assessments; first prototype components available; Evaluation procedure specification and integration report (M18)  1.5 Final prototype available, initial business plan; Initial evaluation results, revision requests & deployment procedure (M24)  1.6 Final public & private reports issued, project ends (M30)

18 Month Review Meeting Project # WP1 Deliverables & Milestones  Deliverables 1.1 Quality assurance protocols and policies (M3) 1.2 Management, financial and activity reports (M12) 1.3 Management, financial and activity reports (M24) 1.4 Final Public Report (M30) 1.5 Final management, financial and activity reports (M30)

18 Month Review Meeting Project # Upcoming Work Plan – project roadmap  Months 1-6 Design & Specification  Function specifications  mock-ups, use-case scenarios  testbeds  Months 7-12 Algorithm development  proof-of-concept software  infrastructure  Months Building the archiver  delivering feature extractors  metadata schema support  Months Integration  System testing  Interface refinement  Months Deployment  On-site software installation  refinement

18 Month Review Meeting Project # Meeting Emphasis  Integration is the key focus for upcoming months.  Begin deployment of complete EASAIER system by month 24.  Emphasise integration in presentations and discussion. 1.What functionality has been integrated into the EASAIER system? Are there any outstanding issues or further work required? 2.What functionality has been delivered for integration, but not yet fully integrated. What are the issues, how and when will they be dealt with? 3.What functionality has not been delivered? What is current status on preparation for integration? What are remaining issues, how and when will they be dealt with? 4.If there are no plans to integrate a certain technology, why not?  demonstrate integrated prototypes, whenever possible.  do not demonstrate standalone prototype if there is integrated or partially integrated prototype available.  The only standalone prototypes that you should demonstrate are new technologies that haven’t yet seen.

18 Month Review Meeting Project # Testbeds  Available  HOTBED  Hungarian speaker corpus  Instrument recognition  Oyez  Needed  Language testbeds  … ?  In Progress  Small, detailed testbed for system testing  RSAMD to report

18 Month Review Meeting Project # Integration Workplan – Completed or almost complete ComponentPartner(s)WPStatus Integration workplanQMUL1First draft Aug. 30, revised every 2-4 weeks DEMOsEveryone2-7Delivered, requires integration, see above Metadata mappings – MARC, Hotbed, Dublin Core DERI2Delivered, is it usable? Music ontologyQMUL2Delivered Speech ontologyALL2Delivered and integrated with music ontology Video time/ pitch scale modification DIT, QMUL5Delivered and integrated Speech retrieval testbed with aligned transcripts QMUL3Delivered to ALL Timetable for prototype testingRSAMD7Delivered to partners, continually revised Client applicationSILOGIC7Available, tested, lacking integrated routines Speech retrieval mock-upALL3Delivered to SILOGIC for integration along with API for a web interface, lacking working functionality Feature extractorQMUL4Developed, being refined Small, detailed testbedRSAMD7First draft delivered, needs revision

18 Month Review Meeting Project # Integration Workplan – Planned for later / low priority ComponentPartner(s)WPStatusDeadline Metadata mapping – METS DERI2DERI Needs a METS package to examine content. Work to start after meeting Crossmedia retrievalQMUL3SpecifiedWork to start after meeting Instrument IDDIT4In developmentDelivered soon after Jan 08 Speaker recognitionNICE4Functional, in developmentPreparation for integration to begin after 18 month meeting New visualisation paradigms SILOGIC6In developmentShowcase at year 2 meeting Test soundbite on speechNICE3PlannedNo immediate need annotated English broadcast quality tested NICE7PlannedRequested by ALL, date unassigned Language detection testbed material Everyone7Planned, Hungarian delivered Requested by NICE, date unassigned DEMO integrationSILOGIC6Dependent on partners.All demos DONE except speech & music retrieval, speaker recognition, to discuss at meeting

18 Month Review Meeting Project # Integration Workplan – In progress, WP2-3 ComponentPartner(s)WPStatusDeadline Import metadata feature DERI2Based on metadata mappings, DERI to report To be determined Ontology –based searching DERI2Under revisionBegin integration immediately after meeting (Dec 1?) RDF storageDERI2under developmentBegin integration immediately after meeting (Dec 1?) Archivist metadata management tool QMUL (feature extractor) /DERI (Ontology editor) 2In development, needs serious discussion January 2008 Segment editingSILOGIC/QMUL2Adapt from existing marking and visualisation in Sonic Visualiser/ EASAIER client To discuss Music retrievalQMUL3Developed and demonstrateddeliver by Dec 31 Speech retrievalALL3Mock-up available, ALL to report, discuss with SILOGIC Initial version prepared for integration by Dec 31

18 Month Review Meeting Project # Integration Workplan – In progress, WP4-5 ComponentPartner(s)WPStatusDeadline NICE plugins (speech/nonspeech, gender, emotion, language, laughter, accent) NICE4speech/nonspeech, gender, emotion, delivered but currently not working. Others not delivered. To be assigned at meeting Speech segmentationALL4Delivered, not workingResolve issues and set deadline at meeting bar line, music structure segmentation DIT4Developed, but no integration work yet Progress made should be delivered January 2008 Polyphonic transcriptionQMUL/DIT5Developed, under evaluation, note duration needs further work Progress made, should be delivered Feb./March 2008 EQ & Source separationDIT5DevelopedDIT to report

18 Month Review Meeting Project # Finance  2 nd payment received and distributed to partners.  Reminder: Audits should be done for the end of year 2  20% of funding will be witheld until successful completion of the project  Annual financial reporting should be received by Queen Mary by 15 May 2008 in order to make the deadline of 15 th June  All funds for the period should be spent to receive maximum funding for the following period.