Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants 26.06.2013 Lukasz Zwalinski PH/DT/DI.

Slides:



Advertisements
Similar presentations
© 2003, Cisco Systems, Inc. All rights reserved..
Advertisements

P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
André Augustinus 16 June 2003 DCS Workshop Safety.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
Ethernet as a field-network Renaud Barillère - CERN IT-CO.
Time Stamping and archiving of PLC data
Notes: For the installation of a PB network, you can use shielded twisted pair copper cable, glass or plastic FO and infrared components. And you can mix.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
IBL CO 2 UNICOS CPC6 based control system Lukasz Zwalinski – PH/DT/PO.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
An example of platform independence in UNICOS control systems Koutli Maria CERN EN-ICE-PLC 07/02/14.
SCADA and Telemetry Presented By:.
Legacy Remote I/O Upgrade to Ethernet
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
Distributed Control System Group D Louay Sirwi Abdallah Jafar Dr. H. Shabaik SE – 401.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
FE Technologies PLC basis… EN-ICE-PLC Jerónimo ORTOLA Benjamin BRADU
Automatic Generation Tools UNICOS Application Builder Overview 11/02/2014 Ivan Prieto Barreiro - EN-ICE1.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
11/03/2003LHC GCS - JCOP ER1 LHC GCS Renaud Barillère – CERN IT-CO.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
FAIR Accelerator Controls Strategy
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Automation Automation & Drives Business Unit Smart Platform.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
Vacuum Control System AdV architecture similar to the existing one one autonomous station per “pumping unit” (about 30 units : tower, tube station, cryopumps.
Michal Zimny Cracow University of Technology Seminar - Internship programmes at CERN PH-DT-DI.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
FINAL PRESENTATION ANASTAZJA SĘDZICKA CRACOW UNIVERSITY OF TECHNOLOGY JUNE – OCTOBER
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
60kW Thermosiphon control system
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.
Unity Application Generator Step 4d: Defining PLC.
Unity Application Generator How Can I… Exchange data between TWIDO PLC and any Unity PLC using UAG.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
Unity Application Generator How Can I… Develop a Generic device which can communicate Over IO Scanner.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
© 2002, Cisco Systems, Inc. All rights reserved..
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
BE – RF CLEX TBM Cooling System Software Perspective (DAQ and analysis) A. Zelios, BE - RF1 A. Zelios A. Vamvakas.
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Alice TOF Production Readiness Review Gas Control Systems.
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
CV PVSS project architecture
Unity Application Generator
GUAPI working group meeting June 26th 2013
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Presentation transcript:

Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI

Presentation overview A bit of history Why Ethernet IP? Control system architecture example Real implementation example Implementation issues Summary Overview Lukasz Zwalinski GUAPI 26 th June 2013

Setting CO 2 cooling plants standards: Control philosophy Safety and interlocking philosophy Software framework Control and electrical hardware PVSS data server location PH-DT restructuration: Cooling merged with Gas to common section History

Lukasz Zwalinski GUAPI 26 th June 2013 We have selected to work with Schneider PLCs We knew that PROFIBUS is not perfect solution for Schneider Schneider strongly advertised Ethernet IP (FDT/DTM workshops etc.) EN-ICE recommended to study this technology More and more equipment available with Ethernet IP Selected WAGO as I/O solution FESTO as electro valves Why Ethernet IP? Ethernet IP advantages Siemens and Schneider goes in the direction of implementation of the industrial Ethernet Transparency: configure, control and diagnose all devices on the network Efficiency: consolidate control onto a single network module Simplicity: manage the entire network with Unity Pro Ring topology Hot Swapping Etc.. But is it real??

IBL Control system architecture OWS EN/CV Terminal server Detector Control System DIP Central Control Room Critical data tunnel from PLC to DCS Vacuum PLC M340M CPU Lukasz Zwalinski GUAPI 26 th June 2013 Privet network

IBL real implementation Lukasz Zwalinski GUAPI 26 th June 2013

Closer look on WAGO Lukasz Zwalinski GUAPI 26 th June 2013

CMS real implementation Lukasz Zwalinski GUAPI 26 th June 2013

CERN TN – Ethernet IP was not validated to be implemented in CERN TN network directly, as the consequence we don’t have the direct access to all the devices in the network UNITY PRO - Each PC from which we want to access our application should have the same DTM library, so we need to import the definition files on all our PCs independently Addressing Implementation issues We have to remember that declared memory area for the Ethernet IP communication is not covering with UNICOS mapping Lukasz Zwalinski GUAPI 26 th June 2013

Addressing - to establish no error communication the declared memory addressing for the coupler has to match exactly the real memory consumed by the coupler. Implementation issues Trick for WAGO Calculated memory area for inputs has to be always increased by 1 byte!! As it is reserved for coupler identification. User has to carefully calculated required memory or can connect to the device and read how much it consumes. (Online parameters in Ethernet IP) Lukasz Zwalinski GUAPI 26 th June 2013

Addressing – is not an issue when You use Schneider equipment like STB_NIC2212 When additional Advantys software installed for configuration of the Schneider Ethernet IP device it connects automatically with UNITY and it has very nice graphical representation of the hardware configuration Implementation issues Lukasz Zwalinski GUAPI 26 th June 2013

Introduced new FE Encoding type for Ethernet IP (400) Instance template modification Based on current PROFIBUS implementation Small modifications according to the way of addressing Small modification for coupler I/O error UNICOS CPC 6 extension for WAGO and FESTO FEDeviceIOConfig FEChannel FE Encoding TypeInterfaceParam1InterfaceParam2InterfaceParam3InterfaceParam4InterfaceParam5InterfaceParam6InterfaceParam7InterfaceParam8InterfaceParam9InterfaceParam10 400WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN FEDeviceIOConfig FEChannel FE Encoding TypeInterfaceParam1InterfaceParam2InterfaceParam3InterfaceParam4InterfaceParam5InterfaceParam6InterfaceParam7InterfaceParam8InterfaceParam9InterfaceParam10 400WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN WAGO_1_IN Lukasz Zwalinski GUAPI 26 th June 2013

Summary Summary: Ethernet IP is very interesting technology but at CERN currently we can not use all features because of the network infrastructure. It does not allow in reality to access to the device form our PC like in example Siemens PDM. We need to connect into privet network. Advantages: Ring topology – verified Hot swapping – not verified Consolidation – verified Easy cabling Lukasz Zwalinski GUAPI 26 th June 2013