Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – 0513 PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD.

Slides:



Advertisements
Similar presentations
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Advertisements

Study Committee Representatives Annual Report December, 2012
Voltage and Current Division
ADVANCED MANAGEMENT OF A CLOSED RING OPERATED MV NETWORK: ENEL DISTRIBUZIONE’S P4 PROJECT. Simone Botton, Roberto Calone, Luigi D’Orazio, Alessandro Fatica,
QUALITY AND TECHNOLOGY
Understanding Electrical TransmissionDemonstration C2 A Guide to the National Grid Transmission Model Demonstration C2 Why are high voltages used for transmission?
EMC in Electrical Power Systems Frithiof Jensen Power System Engineer November 12, 2013.
TECHNIQUES OF DC CIRCUIT ANALYSIS:
Lecture 101 Introduction to Energy Storage Elements: The Capacitor.
Ee392n - Spring 2011 Stanford University Intelligent Energy Systems 1 Lecture 3 Intelligent Energy Systems: Control and Monitoring Basics Dimitry Gorinevsky.
Physics for Scientists and Engineers II, Summer Semester 2009 Lecture 6: June 1 st 2009 Physics for Scientists and Engineers II.
1 Adjoint Method in Network Analysis Dr. Janusz A. Starzyk.
Distributed Power Systems ELCT 908
PRODUCTS TRANSFORMERS ENERGY SAVING TRANSFORMERS (EST) TRANSFORMER RECTIFIER UNITS 3 rd HARMONIC REJECTION TRANSFORMERS (HRT) ULTRA HIGH ISOLATION TRANSFORMERS.
Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
Frankfurt (Germany), 6-9 June 2011 Ying Wang – China – Session2– Paper 0587 Voltage Sag Frequency Assessment Considering Customer Satisfaction Degree Ying.
HV Field Testing and CCVT Re-verification December 2013.
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
WHO WANTS TO BE A MILLIONAIRE?
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Electrical Distribution Training
An Electrical Network IS AN INTERCONNECTION OF ELECTRICAL COMPONENTS. TYPICAL LINEAR CIRCUIT To analyze, design and measure a number of quantities (e.g.
Frankfurt (Germany), 6-9 June 2011 V Ramesh – India – Session 1: Network components – 1096 Integrated Switching Devices (ISD) V.RAMESH ABB Limited, Nashik,
Connections of a CT and a PT to supply, load and relay.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Frankfurt (Germany), 6-9 June 2011 GONZALEZ–CH–RIFS4–0182 OPERATIONAL STABILITY OF SHUNT CIRCUIT-BREAKER SYSTEMS IN UNGROUNDED MV NETWORKS WITH DISTRIBUTED.
Costs of PQ Networks José María Romero Gordon Frankfurt (Germany), 6-9 June 2011.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Voltage Control of Distribution Network Using an Artificial Intelligence Planning Method Jianing Cao 1 Keith Bell 1 Amanda Coles 2 Andrew Coles 2 1. Department.
Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,
Frankfurt (Germany), 6-9 June 2011  PV in Spain: Basically Large plants connected to MV or HV Mainly in rural areas (generation exceeds consumption) 3,000.
IEEE PES General Meeting, Tampa FL June 24-28, Chapter 3 Harmonic Modeling of Networks Contributors: T. Ortmyer, C. Hatziadoniu, and P. Ribeiro.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Frankfurt (Germany), 6-9 June 2011 M. Khederzadeh Power & Water University of Technology (PWUT) Tehran, IRAN. M.Khederzadeh – IRAN – RIF S3 – Paper 0066.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
IEEE PES General Meeting, Tampa FL June 24-28, Chapter 1: An Overview of Power System Harmonic Analysis Tutorial on Harmonics Modeling and Simulation.
Frankfurt (Germany), 6-9 June 2011 Mark Davies Trevor Charlton Denis Baudin Mark Davies – UK – Session 2 – Paper 0376 New Design Methods to Achieve Greater.
1 Power Quality EKT 451 CHAPTER 8. 2 Introduction Utilities transmit electricity over power lines into home as an alternating current (AC) wave. This.
Frankfurt (Germany), 6-9 June 2011 Vladimir Ćuk*, Sjef Cobben*, Wil L. Kling*, Roelof B. Timens** TU Eindhoven – The Netherlands, ** Universiteit Twente.
Frankfurt (Germany), 6-9 June 2011 Round Table 2a Voltage Quality Monitoring, Dip Classification and Responsibility Sharing Kevin Niall, ESB Networks on.
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
MIGRATING TOWARDS A SMART DISTRIBUTION GRID Authors: Prashanth DUVOOR Ulrike SACHS Satish NATTI Siemens PTI.
© 2015 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton software.
Introduction  Utilities transmit electricity over power lines into home as an alternating current (AC) wave.  This is how power travels through wiring.
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
Frankfurt (Germany), 6-9 June 2011 Irina Melnik – the Netherlands – Session S2 – 0665 Intelligent Distribution Substation improves power quality.
Lighting Systems Data and power systems. 1. Power: the network that supplies the power to run the equipment 2. Data : the network that sends instruction.
Presentation Course: Power System Presented BY: M.Hamza Usman Roll No# BSEE Date: 10, November Section(B) To: Sir, Kashif Mehmood.
Department of Electrical and Electronic Engineering Ariel University Israel, Eilat, 2014 A. LIPSKY, N. MITEVA, E. LOKSHIN Frequency Response of Voltage.
EKT 441 MICROWAVE COMMUNICATIONS CHAPTER 3: MICROWAVE NETWORK ANALYSIS (PART 1)
Voltage Divider Circuits Input transducers Input transducers are devices that convert a change in physical conditions (for example, temperature) into a.
Frankfurt (Germany), 6-9 June 2011 Minimum short circuit power in the LV distribution network to meet EN standard requirements David MEZERA
What charge exists on a 30 μF capacitor (fully charged) with a 120 V potential difference between its plates and what is the energy stored? Ans: 3.6.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
Lecture 09Electro Mechanical System1 Chapter 11 Special Transformers.
TECHNICAL PAPER ON SIMULTANEOUS AC-DC POWER TRANSMISSION
Dr.F. Arteche EMC DEPFET Project: A general overview.
GENERATION AND MEASUREMENTS
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
DRAFT Slides for Discussion - Standards, Reports and Recommendations
Sub Station.
Chapter 8: FET Amplifiers
HIGH VOLTAGE ENGINEERING (HVE)
FET Amplifiers.
ELE 2103 Dept . of E & E, MIT Manipal
Regulators Indices on Power Quality
Objectives: After completing this module, you should be able to:
Voltage and Current Division
Presentation transcript:

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – 0513 PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS Advantages Access from public areas Practical, low costs and time saving Applications Detection of disturbing loads Statistical Control of Supply Quality Objective Measuring voltage disturbances referred to industrial frequency value, such as flicker, harmonics, sags

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS Measuring an electric field between two electrodes. It is similar to a capacitive voltage divider where the HV capacitor has been replaced by a parasitic one. Principle used in HV Labs Where: u(t) = Potential to be determined [V]. u m (t) = Potential measured with the EFS [V]. G V = Voltage gain between the output of the electric field sensor and the measurement equipment [V/V]. k E = EFS transduction constant = [m]. k G = Geometric constant of physical installation [1/m]. For measuring perturbations - referred to the fundamental frequency voltage – It is only necessary to reproduce the waveshape. Due to this it is not necessary to know the constants G V, k E, k G, being enough to verify the linearity and the independence of the frequency.

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS b ac One channel EFS measurement reproduces + and – sequence but not 0 hseqV3ΦVm Solving equations, the mathematic result is: Testing the circuit, the result is:

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS HV Lab experiences and contrast Flicker and harmonics were applied to a HV installation using a LV/HV transformer excited with an electronic power generator. IEC meters were used Frequency Response. The transducer is installed inside a parallel plate capacitor. LV tracking generator Measurement system EFS + recording equipment meet error  5 %, IEC Flicker standard and Class I IEC Harmonics standard.

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS Field measurements Flicker comparison: HV with EFS v s LV conventional Flicker in Bragado LV conventional measurements Flicker HV with EFS v s LV conventional Subtransmission area explored

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS Field measurements Localizing flicker Sources

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS 1.Flicker measurements in overhead lines with the EFS are feasible to perform in compliance with required uncertainties, according to International Standards. 2. The following steps shall be carried out to find the geographic location of the prevailing Flicker source:  Perform measurements with an EFS in different nodes of the power system – keeping one conventional Flicker measurement in a reference place –.  Obtain the topology and the electrical data of the power system to be inspected, and determine (by manual calculations or by computer simulations) the effects of a predominant Flicker source in different nodes of the power system.  Correlate both results and determine the geographic location of the predominant Flicker source. Localizing flicker Sources Summary

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS Harmonic measurements Results obtained with the same EFS, during flicker measurements Saladillo node was over the 5th harmonic limit Chacabuco node should be checked longer The other nodes are within the limits The results for the 3 rd harmonic and its multiples should be considered only as indicative

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS  It is a practical way to measure harmonics, flicker and other perturbations related to industrial frequency voltage, in compliance with IEC rules under 1Φ/3Φ grids (+,- seq, not 0)  It can be used as a powerful tool for finding disturbing loads along aerial transmission / distribution grids by accessing from public areas  It is a useful tool for statistical inspection of PQ in widespread electrical systems  The EFS based measurement method is particularly useful where both cost and physical location drawbacks cannot be addressed Remarks

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS [1] M.Del Pozo, D.Esteban, P.Issouribehere, G.Barbera (IITREE FI-UNLP) A. Funes, A. Ledezma (YACYLEC), 2010, "Field measurements and modelling of high frequency transients during disconnect switch operations in EHV Substations. Assessment of their effects on Current Transformers", International Congress of CIGRE (Conseil International des Grands Réseaux Electriques). Paper: A3_207_2010. Paris, France, Ag [2]G. Casas, P. Issouribehere “Aplicación de un medidor de campo eléctrico como transductor para mediciones de perturbaciones en redes”. II ERLAC CIGRE CE 36. Puerto Iguazú, Argentina, junio [3]ENRE (Argentina) Resoluciones 184/00: “Base Metodológica para el Control de la Calidad del Producto Técnico. Etapa 2” y ENRE 99/97: “Base Metodológica para el Control de la Emisión de Perturbaciones. Producto Técnico - Etapa 2” [……….]IEC EMC Standards References

Frankfurt (Germany), 6-9 June 2011 ISSOURIBEHERE – Argentina – RIF Session 2 – PERTURBATION MEASUREMENTS ON OVERHEAD NETWORKS USING ELECTRIC FIELD SENSORS Instituto de Investigaciones Tecnológicas para Redes y Equipos Eléctricos IITREE-LAT) FACULTAD DE INGENIERÍA - UNIVERSIDAD NACIONAL DE LA PLATA - ARGENTINA Daniel Esteban, Fernando Issouribehere, Pedro Issouribehere