Totara Valley distributed generation project Micro Hydro scheme July 2006.

Slides:



Advertisements
Similar presentations
- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Advertisements

How Technology will make Renewable Energy Competitive 10/17/2013
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Do Now: 8.5 in 11 in Explain how you would go about finding the area of the shape shown above.
Microhydro 2006 Environment Summit Sustainability in the High Country September 23, 2006 Diane Price Brent Summerville.
Smart Energy Campus September 16, Project Overview  Workforce Training  Solar PV  Solar Thermal  Small Scale Wind  Plug-in Hybrid Electric.
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
Massey University POST-GRAD Energy Conference Steve Broome Industrial Research Ltd 26 July 2006 Alkaline Fuel Cell System Research.
First General Meeting October 2, Agenda Mission Statement Fiji Project Overview Coconut Oil Progress Micro Hydro Potential Biodiesel Outreach Fundraising.
Geothermal Energy 2000 Geothermal Education Office.
EE535: Renewable Energy: Systems, Technology & Economics
Advantages and Disadvantages of Energy Sources
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
Photos from Wikipedia under GFDL. See notes for more.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Engineering Technology Division
HYDROPOWER DAMS By Hydro Power Group PYP 6 – Sekolah Ciputra
Hydro Power Plant Prepared by: Nimesh Gajjar
Slide 1 Introduction to Renewable Energy Technologies Rural Cumbria Connects Consortium.
16 August 2015 Delft University of Technology Electrical Power System Essentials ET2105 Electrical Power System Essentials Prof. Lou van der Sluis The.
46 mini/micro hydro plants KP Pakistan
Energy to Educate Craig Hammond Stephanie Sheppard Kyle Tress Justin Valenti Presented to: OPP EDSGN 100 8/8/11.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
The Solar Resource The Hydro Resource and Micro Hydroelectricity Systems.
SUSTAINABILITY What Does it Mean for Civil Engineers? Developed by Yvette Pearson Weatherton, Ph.D., P.E. This work was supported by a grant from the National.
R 255 G 211 B 8 R 255 G 175 B 0 R 127 G 16 B 162 R 163 G 166 B 173 R 104 G 113 B 122 R 234 G 234 B 234 R 175 G 0 B 51 R 0 G 0 B 0 R 255 G 255 B 255 Supporting.
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
Energy conversion and storage Some energy sources have storage ‘built in’ Fossil fuels Biofuels Hydro power (to some extent) Others are available on demand.
Energy  Humans use varied energy resources  Most came from solar energy  Decomposition of plants, animals buried underground form fossil fuels Which.
Delivering Power & Water Efficiently
Convection currents (wind and ocean waves), W Evaporation of water, heating of water & ice W Photosynthesis on land and sea, 98.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Distributed Generation Technologies A Global Perspective NSF Workshop on Sustainable Energy Systems Professor Saifur Rahman Director Alexandria Research.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
2007 Energy Postgraduate Conference 17 – 18 July 2007: Massey University Turitea Campus, Palmerston North Steve Broome Industrial Research Ltd 18 July.
Do Now: What are the 4 steps of the Water Cycle? What is the difference between transcription and evaporation?
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Wind Test Plan ●Test individual components, system in different conditions ●Calculate expected power under various conditions Wind block diagram.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Wind Energy Mukul M. Sharma. U.S. Use of Renewable Energy Source: Annual Energy Review 1999, U.S. Energy Information Administration.
Generating Electricity
Free Independent Personalised sustainable building advice This service is an initiative by BRANZ Ltd.
Do Now:. Hydro Turbines: Power & Efficiency The Potential Energy of Reservoirs Dams force water to back up behind them into reservoirs which store the.
Northern Energy Developments Ltd Canonbie, Dumfriesshire
Electricity Generation- energy & power. Today we will learn … What is energy? What is power? What is electricity? How is electricity generated?
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
ETC 288 Alternative Energy Class 10 Saturday 4/9 9: :00 AM Course Review, Wrap up ETC 288 Alt Energy.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
Energy Scenario for the UK: NBS M016. A hydro scheme comprises a system for extracting energy from water as it moves, normally dropping from one elevation.
RENEWABLE ENERGY STRATEGIES FOR MANUFACTURERS BEN D.S. COLLINS RENEWABLE ENERGY DEPARTMENT SUPERVISOR
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
 Energy is a major input for overall socio- economic development of any society  The prices of the fossil fuels steeply increasing  So renewables.
WELCOME TO “DIBANG MULTIPURPOSE PROJECT” SUBMITTED BY : ABHISHEK KUMAR ROLL NO BRANCH – MECHANICAL (5 TH SEM )
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
Green College Initiative Jem Morris. Green College Initiative The College has created a ‘Green College’ group that meets at least every 8 weeks The group.
Microgeneration Karl Letten – Change Programme Support Officer (Environment) Change Management.
ERGA'S HYBRID BAKU
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
Electrical energy is a very convenient form of energy and it can be easily Converted into other forms. To meet the ever increasing use of electric power.
Presented by John Masai Kapolon Energy Specialist and Head of Energy Access Programme, Practical Action Eastern Africa Sustainable Energy Technologies.
The Generation of Electric Energy
Micro-hydro Understand the fundamental principles and
ASOSAI Working Group On Environmental Auditing
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
RENEWABLE RESOURCES.
ENERGY SUSTAINABILITY
City Council April 30, 2018 Item 13
The alternatives.
Presentation transcript:

Totara Valley distributed generation project Micro Hydro scheme July 2006

Totara Valley 20mins drive northeast of Woodville 20mins drive northeast of Woodville Site of several Massey renewable energy projects Site of several Massey renewable energy projects –Solar photovoltaic and solar thermal –Wind Turbine + Electrolyser + Fuel cell –Bio-diesel generator Very supportive landowners Very supportive landowners Proximity to Massey University Proximity to Massey University

Totara valley

Features of Hydro project 1400W peak output 1400W peak output 165 m static head 165 m static head 1300m “penstock” 1300m “penstock” Maximum flow rate 2Litres/sec Maximum flow rate 2Litres/sec Grid Interactive Grid Interactive

Site considerations High head site selected because… High head site selected because… Technical and academic challenges Technical and academic challenges Low environmental impact Low environmental impact Allows stress testing of components and further research Allows stress testing of components and further research

Intake site

Turbine Site

Equipment Selection Pelton wheel good choice for high head site Pelton wheel good choice for high head site EcoInnovations turbine selected EcoInnovations turbine selected –NZ manufacturer –Recycled materials –Innovative design –Availability of spares and support –Competitive pricing

Alternator detail

Energy Recyclers Grid Interactive Inverter

Working Pressure 1260 kPA

Project milestones 26 April 2005 initial survey 26 April 2005 initial survey Consent application completed 21 July 05 Consent application completed 21 July 05 Week of 16 Dec 05, Installation of intake, hut, turbine, intake pipe. Week of 16 Dec 05, Installation of intake, hut, turbine, intake pipe. 24 Mar 06 connection to grid completed operational on temporary basis 24 Mar 06 connection to grid completed operational on temporary basis Continuous operation 25 July 06. Continuous operation 25 July 06.

Construction – Turbine site

Pipe Installation

Resource Consent process Discretionary activity under the district plan Discretionary activity under the district plan Two consents required Two consents required –For diversion/abstraction of surface water –For discharge into a stream Would have also required consent for dam if required Would have also required consent for dam if required

Resource Consent process –cont’d Horizons regional Council agreed to issue 2 non notified consents providing we obtained written permission from Horizons regional Council agreed to issue 2 non notified consents providing we obtained written permission from –Landowners –Neighbors –DOC –Fish and Game

Intake site

RMA process Considerable volume of documentation required Considerable volume of documentation required Council approval approx 4 months Council approval approx 4 months Council charges $1,289 + deposit Council charges $1,289 + deposit Ongoing annual “monitoring” charge Ongoing annual “monitoring” charge Ongoing annual “administration” charge Ongoing annual “administration” charge Consent is for 20 years with 5 yearly reviews Consent is for 20 years with 5 yearly reviews All of the above are significant disincentives and are a barrier to development of small scale renewables. All of the above are significant disincentives and are a barrier to development of small scale renewables.

Hut Interior

Future Directions Monitoring the performance and reliability of present turbine Monitoring the performance and reliability of present turbine Trials with induction motors and other technologies. Trials with induction motors and other technologies. Addition of telemetry and remote monitoring equipment Addition of telemetry and remote monitoring equipment Possible development of a previously identified low head site Possible development of a previously identified low head site

Acknowledgements Jim Hargreaves – Massey University Jim Hargreaves – Massey University Ralph Simms – Massey University Ralph Simms – Massey University Michael Lawley, Riana – EcoInnovations Michael Lawley, Riana – EcoInnovations Todd, Poultan’s Australian shearer Todd, Poultan’s Australian shearer Bram & Peter – Visiting Post Grad Students Bram & Peter – Visiting Post Grad Students IRL – Ben, Alister IRL – Ben, Alister Mainpower – Andrew, Todd Mainpower – Andrew, Todd Mark Carter Mark Carter Apologies to those contributors I have overlooked Apologies to those contributors I have overlooked

THANK YOU !