LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 LBT672 ADAPTIVE SECONDARY UNITS Current status, acceptance test plan and specifications.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

LBT AO progress report meeting – Firenze, Feb 2005 A. Riccardi: LBT672 1 LBT672: Arcetri progress report A. Riccardi, M. Xompero, D. Zanotti, A.
Osservatorio di Arcetri Adaptive primary mirrors for ELTs A. Riccardi 1, P. Salinari 1, G. Brusa 1, R. Ragazzoni 1, S. Esposito 1, D. Gallieni 2 and R.
Osservatorio di Arcetri Potsdam May st light LBT AO: PDR Optical Test Tower for the LBT Adaptive Optics System A. Riccardi 1, P. Salinari.
The adaptive secondary mirror for the 6.5 conversion of the MMT
Osservatorio di Arcetri LBT AO Conceptual Design Review Steward Observatory - March 5-7, 2001 MMT336 Characterization Software Armando Riccardi & Guido.
SSWG Meeting 2006 May 8 SSWG May ’06: SAMS. SSWG Meeting 2006 May 8 Agenda SAMS Hardware overview SAMS Software overview System status – performance to.
The adaptive secondary mirror. Current technology for MMT/LBT A. Riccardi 1, G. Brusa 1, C. Del Vecchio 1, P. Salinari 1, R. Biasi 2, M. Andrighettoni.
INAF-Osservatorio di Arcetri 3-4 May Tuorla Observatory Opticon Meeting Adaptive secondary and primary mirrors for ELTs A. Riccardi 1, G. Brusa 1,2,
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
K-Space Associates, Inc. kSA BandiT: Band-edge Thermometry.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Integration and Test 14 October 2008 Martin Nordby.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
TSU F.E ANALYSIS YAIR SOFFAIR. Ojective Dynamic Response Calculation Temperature Distribution LOS Retention due to Temperatures Design Recommendations.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Hybrid Integrated Circuit
LBT672 opto-electro-mechanical specification overview Presented by A. Riccardi A. Riccardi, G. Brusa, R. Biasi, D. Gallieni FLAO system external review,
LBTO PMC Subsystem February 13, 2007 Chris Biddick 1 cjb.
LBT Progress Report, Feb Marco Xompero 1/14 P45 Test Results and beyond… Marco Xompero Daniela Zanotti Armando Riccardi.
LBT External Review December AO status and perspectives P. Salinari 1 AO status and perspectives.
Telescope Integration and Tests Tuesday Afternoon.
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
1 1 st Light AO 4 LBT Pyramid WFS Adaptive Secondary MMT Unit.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
LBT SW workshop. Tucson, 2-6 Oct 2006 A. Riccardi - The LBT AdsSec units1 The two LBT adaptive secondary units (LBT672a, LBT672b) A. Riccardi, M. Xompero,
PeTeR: a hardware simulator for LISA PF TM-GRS system 23/05/ th LISA Symposium May 2012, BnF Paris L. Marconi and R. Stanga Università degli.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
FLAO_01: FLAO system baseline & goal performance F. Quirós-Pacheco, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
The Adaptive Mirror for the E-ELT
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
Pre-focal wave front correction and field stabilization for the E-ELT
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
FLAO_08 FLAO System Shipping Plan Document 646f010a Richard Demers, Guido Brusa, Armando Riccardi, Daniele Galieni FLAO system external review, Florence,
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Current Status of LASER FRAME for KEK-Nano BPM (Tentative results of resolution test) Second Mini-Workshop on Nano Project at ATF December 11-12, 2004.
Repeatability and control in nanoimprint lithography Sarah Felix 4/14/08 EE C235 - Nanoscale Fabrication.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
IF and KL measurements with 4D interferometer Runa Briguglio, OAA.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
IDPU F1 Test Review FGM Fluxgate Magnetometer Michael Ludlam University of California - Berkeley.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
Preparing the optical calibration of the M4-Deformable mirror for the E-ELT Briguglio, R., Pariani, G., Xompero, M., Riccardi, A. ADONI meeting, Firenze.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Digital Light Sources First introduced in 2001.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
SPF MAG Quarterly Report – Feb 2015
7th Belle II VXD Workshop, Prague
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Magnetic Measurements For The LCLS Undulator System
FNAL Production Experience
GLAST Large Area Telescope
Presentation transcript:

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 LBT672 ADAPTIVE SECONDARY UNITS Current status, acceptance test plan and specifications A. Riccardi, M.Xompero, D. Zanotti, L. Busoni INAF – Osservatorio Astrofisico di Arcetri D. Gallieni ADS International srl R. Biasi Microgate srl

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MECHANICS WHERE WE ARE BACKPLATE COATING ISSUE PALNNED STEPS MECHANICS AT ELECTRONICS WHERE WE ARE OPEN ISSUES ELECTRONICS TESTING P45 TESTS FUNCTIONALITY AND OPTICAL TESTS REQUIREMENTS ELECTRO-MECHANICAL ACCEPTANCE ARCETRI TEST TOWER (ATT) FACILITY ADSEC OPTICAL LAYOUT AND ALIGNEMNT IN ATT OPTICAL ACCEPTANCE (SHELL FIGURE QUALITY, FLATTENING STABILITY) PRESENTATION OUTLINE

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MECHANICS: WHERE WE ARE

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MECHANICS: WHERE WE ARE

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 BACKPLATE COATING Silver layer by chemical coating  adhesion Gold layer by galvanic deposition  mechanical strength, age stability Galvanic bath problem  repeated two times Thermal stability problem on ring #7

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MECHANICAL ALIGNMENT

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 INTEGRATION ROOM

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 NEXT STEPS BP finishing (ongoing, TBC by this week)

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 NEXT STEPS Dummy Shell installation test (by Nov.05) - pre-test next week w. G. Engineering Shell installation and dummy magnets gluing (by Dec.05) TS2 installation and magnets gluing (by Jan.06)

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 HAZARDS BP repair (local) Procedure assessment on BP(P1) - Dec.05  Jan.06 2w allocated in schedule after TS2 is removed Shells handling Procedure and tools assessment w. Guido B. on-site assistance […]

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MECHANNICAL SHOP PROOF TEST 640a012, Is.A, days allocated before crating and shipping Unit#1 to Microgate HP#2 (1st ready) will be installed into the solar tower at this time Test with HP#2 (TBC) 3w DELAY on AIT management schedule (8 Sept. 2005)

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 ELECTRONICS: WHERE WE ARE

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 ELECTRONICS: WHERE WE ARE

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 NEW POWER BACKPLANE Complete testing and calibration at Microgate Verification on P45 (W47) Complete integration of other units (components in house !)

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 DISTRIBUTION BOARDS Distribution board type ‘A’ currently being integrated at Microgate After functional tests, repeat mechanical check at ADS Proceed with integration of other boards Mechanical matching tested on dummy boards at ADS

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 ELECTRONICS TEST & CALIBRATION Pre-screening (before integration w. mechanics). E.g. capsens board/actuator Full functional test and calibration Calibration data storage  System components can be replaced with no need to recalibrate the entire system Burn-in test: full power, high thermal load on single backplanes (half-crate). Moderate overload on fully integrated unit without thin shell

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 FUNCTIONAL TEST AT LOW TEMPERATURE Will be conducted on a cooled truck trailer, connected to a docking station (shipping company based at walking distance from Microgate – easy and safe transport of integrated unit) Temperature range: -20°C - +20°C Purpose: functional test (not performance). Includes verification of capacitive sensors calibration using ‘mechanical’ reference pad Verification with test thin shell mounted as an option

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 P45 NEXT STEPS Installation and verification of new power backplane Replace all boards and actuators with LBT672 spares (Capsens board V3.0, DSP board V3.2). Minimal differences w.r.t. currently installed electronics, but 1:1 test always useful! Tracing of P45 operation to verify system reliability New: system operation with two backplanes (2x BCU, real-time communication daisy chain, 2x reference signal generator) Repeat thermal stability tests on new electronics

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 Strong inconsistency between P45 and test-stand measurements. Test stand: ~10 ppm/°C – P45: up to 200 ppm/°C (???) To be understood! THERMAL STABILITY

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 ELECTRO MECHANICAL TESTS AT MICROGATE Elevation angles: 90°, 70°, 45°, 20° AO configuration ( ~ 70um gap) –Noise < 10nm rms –Modal settling time < 1.5ms (0.7 goal) –Tracking of turbulence (0.65asec seeing, 20m/s speed) < 50nm rms WF (goal 28nm) from capsens reading (diagnostic buffers) Chopping config ( ~ 100um gap) –±4asec (80um PtV) 5Hz 90% duty cycle (goal ±7asec, 140um PtV) –On-source tilt reproducibility 10mas rms (goal 3mas) Milestone: Adsec Unit Ready for Optical Tests

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 OPTICAL TESTS IN ARCETRI

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 REQUIREMENTS FOR STARTING OPTICAL TESTS Opto-mechanical accept. tests passed (Adsec ready for Optical test milestone) W acceptance test passed (W sensor ready for System Test milest) Stands and trolleys Hexapod accepted Hexapod TCS software working –Absolute and relative positioning –Rotation around a point Arcetri Test Tower facility working. 0.1°C stability= /10 focus error, per 15min (goal 1hour) Adsec procedure mounting on ATT tested w dummy Retro-reflecting optics and holder tested ( /10 PtV) Shell silver spraying successfully tested on dummy shells

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 ATT SCHEDULE

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 ARCETRI TEST TOWER FACILITY F2 F1 F/15.0 F/ mm mm 911mm Lab Winch

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 RETRO-REFLECTOR AND HOLDER 3cm 2cm Parabola+flat Only mirrors Telescope-like carbon fiber structure

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 Alignment procedure Interferom.: F/14 Mirror: F/15 1. Hex to move the spot on F1 2. Hex to move the spot on F2 keeping the spot on F1 3. Interf. Stage to set the focus 4. Hex+Interf. Stage to compensate spherical ab. Reference Optics mechanical pre-alignment: +/-3mm x-y (WFS +/-0.1 pix) +/-5mm z (WFS z + stage clearance) +/-2deg (F/1.1 instead of F/1.2) WFS BS

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 THERMAL FUNCTIONALITY TESTS In Arcetri Test Tower Temperature: 20°C, 10°C, 0°C, -5°C (goal -10°C) Pressure 700hPa (mountain pressure) Same electro-mechanical tests with same specifications We are considering the possibility to move this test in MG: no need of optical feedback Cooled container down to -20°C Conceptually part of electro-mechanical test But… extra cost (rent of container)

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MIRROR FLATTENING Low order flattening using electrical signals (gap uniformity, refplate figure) Identification of capsens areas on interferometer frame (fiducials, min 6) Delta-commands = -WF/2 on capsens Iterate until no improvement or f>0.2N Local (given gap) calibration of capsens signals –3-5Hz sinusoidal Tip&tilt: 4D-interferometer (30fps) and capsens reading. FFT (demodulation) for calibration constants Iterate flattening after local calibration until no improvement or f>0.2

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 MIRROR FLATTENING SPECIFICATIONS T=ambient, ambient+10°C, ambient-10°C Flattening residual: – Min: < 65nm rms WF, peak force < 0.2N – Goal: < 30 nm rms WF, peak force < 0.07N Chopping flattening: –200nm rms (1/3 rms 0.2asec seeing,L0=20m) –100nm rms (Goal) Milestone: Flattened secondary, ready for AO test

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 FLATTENING UNKNOWNS Environmental disturbances (vibrations) Shape of shell after de-blocking Control effectiveness of chipped actuators (non-linearities)

LBT672 ADAPTIVE SECONDARYLBT AO Review Firenze - 10  11 November, 2005 THE END