Presented by Dorian Conger Conger-Elsea, Inc. 2000 Riveredge Parkway, Suite 740 Atlanta, GA 30328 800-875-8709 phone 770-926-8305 fax www.conger-elsea.com.

Slides:



Advertisements
Similar presentations
Implementing a Behavior Based Safety Process at Rockwell Automation
Advertisements

Ill Keep an Eye Out for You or The Ever-Broadening View of CAP by Ken Elsea, President Conger & Elsea, Inc Highway 92, Suite 300 Woodstock, GA
Excellence in Causal Analysis Establishing the infrastructure to support high quality causal analysis Frederic Lake/Larry Leavitt Palo Verde Nuclear Power.
Organizational Governance
Accident and Incident Investigation
Patrick Walsh Nine Mile Point – Human Performance HPRTC Conference -June 10 Improving Administrative Procedure Use and Adherence.
Job Analysis Background Research 1)Organizational charts (e.g., how the job is connected to other positions and where it is located in the overall company)
Evaluation Team Chair Training Presented By Dr. Tim Eaton TRACS Regional Representative.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
SACS CASI Background Dedicated to advancing excellence in education worldwide, AdvancED provides accreditation, research, and professional services to.
Dorian Conger General Manager Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
System Office Performance Management
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
External Quality Assessments
System Office Performance Management
FDA’s Pharmaceutical Inspectorate Robert Coleman National Expert Drug Investigator Food and Drug Administration.
Chapter 11: Follow-up Reviews and Audit Evaluation ACCT620 Internal Auditing Otto Chang Professor of Accounting.
Coaching Workshop.
QUALITY ASSURANCE PROJECT Improvement Coach The purpose of this session is to introduce participants to the role of the improvement coach and prepare for.
Protection Against Occupational Exposure
Presenter: Gary Bates.  “If a certificated employee receives a rating of ineffective or improvement necessary, the evaluator and the certificated employee.
Presented by Dorian S. Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
REVIEW AND QUALITY CONTROL
Internal Auditing and Outsourcing
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Presented by Ken Elsea Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Presented by Ken Elsea Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
NEXT Lessons Learned from Integrated Regulatory Review Service (IRRS) 22 nd and 23 rd January 2014, Brussels Fernando Franco, Spanish Nuclear.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
Establishing A Compliance Program: It Makes Sense
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
MONASH UNIVERSITY LIBRARY’S QUALITY SELF REVIEW: INVOLVING ALL STAFF M. Pernat Monash University Library, Monash University, Victoria, 3800 QUALITY AT.
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
FTM Training for Facilitators Classroom training, field practice, and approval process for the NEW FACILITATOR.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
SACS and The Accreditation Process Faculty Convocation Southern University Monday, January 12, 2009 Presented By Emma Bradford Perry Dean of Libraries.
2/12/ Break Points for Successfully Implementing a Mentoring Program1.
IAEA Pilot Project on Safety Culture Assessment at Pakistan Nuclear Regulatory Authority (PNRA) Presented By: Mahboob Ali, Member (Executive) Regulatory.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Implementing the NIHSS In Your Organization January 2008.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Process Center of Excellence 0409 Key contacts: STEP 6 - EXECUTION PHASE: IMPLEMENTATION - READINESS FOR CHANGE/GO-LIVE READI Assessment Plan: Detail the.
European Social Fund Promoting improvement Shirley Jones.
Establishing and Maintaining Effective Safety Committees.
CBER Common Problems on Source Plasma Inspections Judy Ellen Ciaraldi BS, MT(ASCP)SBB, CQA(ASQ) CBER, OBRR, DBA September 16, 2009.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Think safe. Act safe. Be safe. Supervisory Safety Leadership Best Safety Practice # 12 Keeping Safety Awareness High.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Presented by Dorian Conger General Manager Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Strategic Workforce Interventions Andrew L. Reitz Barbara Schmitt Child Welfare League of America.
Presented by Dorian Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Expectations for Class! Success is communicating….
AWARENESS OF HEALTH AND SAFETY IN THE WORKPLACE-A CASE AT AKUH, N Joshua Odero, Zahir Moloo, Zul Premji Department of Pathology, Aga Khan University Hospital,
It’s Not What They Learn, It’s What They Use: Integrated Solutions for Sustained Results Presented by: Ed Emde, President Wendy Mack, Director of Consulting.
RTI, MUMBAI / CH 71 SUPERVISION, REVIEW AND QUALITY CONTROL DAY 7 SESSION NO.1 (THEORY ) BASED ON CHAPTER 7 PERFORMANCE AUDITING GUIDELINES.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
International Safety Rating System
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Creating a Robust Safety Culture
Flooding Walkdown Guidance
ROADMAP TO ISO/TS REGISTRATION
Institutional capacities for introduction of the NQF strengthened
AUDIT QUALITY REGULATORY FOCUS AREAS
Presentation transcript:

Presented by Dorian Conger Conger-Elsea, Inc Riveredge Parkway, Suite 740 Atlanta, GA phone fax Human Performance, Root Cause, and Trending Conference Del Ray Beach, FL Copyright 2014 Conger-Elsea, Inc. 1

PI&R is the most important program at the plant from a regulatory standpoint. A PI&R Substantive Crosscutting Area results from a failed Problem Identification and Resolution (PI&R) process; most frequently a failing or seriously flawed corrective action program. Copyright 2014 Conger-Elsea, Inc. 2

1.Extent of Condition 2.Extent of Cause 3.Safety Culture 4.Management System and Programmatic Considerations 5.Inadequate cause evaluations (root and apparent) Copyright 2014 Conger-Elsea, Inc. 3

Column 1 – Licensee Response (86) Column 2 – Regulatory Response (15) Column 3 – Degraded Cornerstone (2) Column 4 – Multiple/Repetitive Degraded Cornerstone (1) Column 5 – Unacceptable Performance Copyright 2014 Conger-Elsea, Inc. 4

Column 2 - $1 - $2 Million Column 3 - $10 - $20 Million Column 4 - $100 - $300 Million Copyright 2014 Conger-Elsea, Inc. 5

Back to the drawing board – Restructure the Corrective Action Program (CAP) MAKE THE NECESSARY CHANGES TO THE CORRECTIVE ACTION PROGRAM TO MAKE THE UPGRADED PROCESS REPEATABLE AND SUSTAINABLE.  Detailed evaluation of the existing program  Rewrite the governing procedures (near state-of-the-art; final changes to follow)  Train the plant staff, as appropriate:  Root Cause Analysts (Team Leaders)  Apparent Cause Analysts  Management Alignment training – Executives and Managers; Supervisors  Familiarize remaining plant staff  Conduct root cause evaluations using the new procedures with expert mentoring (two rounds recommended; may also include team leader skills training)  Train station executives and managers to the elevated standards for root cause analysis and the proper behavioral expectations for Corrective Action Review Board (CARB) members  CARB review and approve the upgraded root cause reports with related corrective actions (CARB observed and mentored/coached as needed)  Implement the new PI&R process with 2-4 months of run time Copyright 2014 Conger-Elsea, Inc. 6

MOCK NRC PI&R Inspection – Establish a team of experts to perform a MOCK PI&R Inspection  NRC Team Leader experience  NRC Inspector experience  Root Cause and Corrective Action Program expertise  Safety Culture expertise Copyright 2014 Conger-Elsea, Inc. 7

Perform the MOCK PI&R Inspection  Two weeks onsite  One week for report preparation (if needed)  Deliver the report to the plant management  Provide advice and counsel to plant management regarding NRC PI&R expectations and the need to communicate importance to the entire plant staff Copyright 2014 Conger-Elsea, Inc. 8

 Evaluate current program –  2 weeks involving two or three senior consultants/principals  Rewrite CAP procedures –  4-6 weeks for the drafting and editing  2 weeks for the reviews and approvals  Training –  1 week - Root Cause Analysts (Team Leaders) - fully mentored; 5-day class  1 week - Apparent Cause Analysts – two 2-day class sessions  2 week - Management Alignment training – Executives and Managers (two 2-day sessions; Supervisors (two 4-hours sessions; plus video)  1 week - Familiarize remaining plant staff (all hands meetings as needed)  Conduct Cause Evaluations per the new standard and procedures –  8-12 weeks for conducting mentored cause evaluations to assure competence and readiness of the personnel to sustain the process  CARB review and approval of reports –  As completed  Implement the new process prior to the MOCK PI&R inspection –  Allow 2-4 months run time  Conduct MOCK inspection and report –  2 weeks for performing the on-site inspect ion and writing the report with recommendations Copyright 2014 Conger-Elsea, Inc. 9

1.Understanding the magnitude of the problem 2.Top management commitment and active participation 3.Resource commitment to properly perform the upgraded CAP process 4.Demonstrate commitment by implementing corrective actions 5.Demonstrate that the new CAP process can be sustained without intervention 6.Ultimately, demonstrate the upgraded processes to an NRC inspection team to clear the PI&R Substantive Crosscutting Area Copyright 2014 Conger-Elsea, Inc. 10