MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.

Slides:



Advertisements
Similar presentations
Telecommunication Rooms
Advertisements

Source One Source One Network and Building Solutions.
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Richard Soluk – University of Alberta. The LHCb VELO Region R. Soluk --- University of Alberta --- MoEDAL Collaboration Meeting --- CERN June
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
CONSTRUCTION.
March 30, 2004 TJR1 MICE Beamline Performance with New Magnet Descriptions Tom Roberts Illinois Institute of Technology March 30, 2004.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Chapter 17 Electrical Plans.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
㈜ D.S.T. 자료용 1. Power film Installation 1. Install the heat insulation on the floor. 2. Install the power film on the heat insulation. 4. Connect the thermostat.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
Air / Sound Lock Iso-Booth Mix Tape EFX Step Up ~18” Raised floor in CR Glass GLASSGLASS Bulkhead Plate with inputs to board below glass EFX rack also.
MICE MICO September ‘07 Chris Nelson. Beamline and Hall Shielded area virtually complete –SW corner –Replacement West wall concrete ordered, corner pieces.
’ tall Empty space below this metal sheet 66’ 14’ 4’ 10’ Ceiling tiles = 24 Concrete blocks 14’ long There are two “styles” of Ceiling tile,
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Unit 5 Review. Linda will paint the walls of her bedroom. She will not paint the floor or the ceiling. How many square feet will Linda paint? Show or.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Speed Drill 51 Wireways and Raceways.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
The Venus Project. A multi-function unit (used to lift & insert prefabricated housing components into support structure) Prefabricated unit composed of.
Electrical Plans.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
AHU-18 replacement and AHU-16 & 17 restoration
Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting,
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Inspections. Structural Evaluation Look for any movement, check alignment, bowing, cracks, separation Basement wall/foundation Check floors & ceiling.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Brian Drendel September 11, Funding and Deadlines Muon Campus Controls  Controls plan for existing buildings  Controls plan for new buildings.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
EC: 7 DISK concept Preliminary considerations
Containment Solutions
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
CBETA Technical Review
Special-Purpose Outlets— Electric Heating, Air Conditioning
UITF – Upgrade Injector Test Facility
SR1 cleanroom extension
Extension SR1 WP3 Electrical installations
,
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall - Hutches
WP16 Water cooling systems
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

MC Beamline Tom lackowski L1 Manager

Project Organization Jan. 2013T. Lackowski - MC Beamline2

Site Plan Jan. 2013T. Lackowski - MC Beamline3

Scope Main Injector type enclosure  10 feet wide x 8 feet high (typical except near MC-1 where higher ceiling will be required.  Painted walls and ceiling, sealed floor. Floor to have 3” cover over rebar to enable stand anchorage.  Channel inserts walls and 8’ o/c. (no inserts 5’ from floor on aisle side) Shielding  13 feet of earth/concrete for M-4 beamline. (w/ beamline 4’ from clg.)  6 to 9 feet for g-2 beamline. Shielding needed within enclosure between MC-1 building and M-4 / Delivery Ring. Access is provided from Ring enclosure- lift provided for magnet installation. Shielding hatch provided for magnet installation / replacement. Jan. 2013T. Lackowski - MC Beamline4

Typical Cross Section Jan. 2013T. Lackowski - MC Beamline5

Scope HVAC & Process Water  A concept exits that integrates the requirements for beamline and Mu2e. G-2 is isolated from beamline.  LCW provided by g-2 and Mu2e Electrical  500 MCM ground along beamlines.  Quad 120V & duplex 208V utility outlets at 60’  480V welding outlets at 400’  Three 18” cable trays provided (one tray will contain line type heat detection) Jan. 2013T. Lackowski - MC Beamline6

Cost by Division Jan. 2013T. Lackowski - MC Beamline7

Preliminary Costs Jan. 2013T. Lackowski - MC Beamline8 $9,200,000 Planned

Cost Curve Jan. 2013T. Lackowski - MC Beamline9