Integrity  Service  Excellence Logistics Health Assessment (LHA) Terry Brinston AAC/ENQL 18 Mar 08 Air Force Materiel Command DISTRIBUTION STATEMENT.

Slides:



Advertisements
Similar presentations
U Development of Reliability Program Standard GEIA-STD-0009 SE Summit March 2009 Approved for Public Release; Distribution is unlimited.
Advertisements

Building the Balanced Scorecard
Roadmap for Sourcing Decision Review Board (DRB)
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
HP Quality Center Overview.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
DoD Integrated Product Support Roadmap Tool
Parts Management Reengineering TLCSM Executive Council Update Gregory Saunders, Director Defense Standardization Program Office 05 Oct 06.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
RSM McGladrey, Inc. is a member firm of RSM International – an affiliation of separate and independent legal entities. Operational Risk Management Framework.
Pittsburgh, PA Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department of Defense.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
New Employee Training Market Research
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Life Cycle Logistics FIPT
Lyle Eesley Defense Acquisition University Director
Integrity  Service  Excellence Life Cycle Management Tools Sherry Ott HQ AFMC/A4UA 15 Jan 10 (DSN ) Air Force Materiel Command.
DoD Parts Management Reengineering Defense Standardization Program Office Industry Day, 8 May 2007 PMRWG Final Report.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
Air Armament Center Mr. John Mistretta Technical Director, AAC/EN War-Winning Capabilities…On Time, On Cost Systems Engineering Update AAC.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
DA HIEF YSTEMS NGINEER 1 ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer DoN PoPS to ICPM Core Common Metrics and OSD DAPS NDIA ICPM.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
Eleventh Lecture Hour 9:30 – 10:20 am, Saturday, September 16 Software Management Disciplines Iterative Process Planning (from Part III, Chapter 10 of.
RDA CHSENG, April 2009 DA HIEF YSTEMS NGINEER ASN (RDA) Chief Systems Engineer ASN (RDA) Chief Systems Engineer Naval Probability of Program Success (PoPS)
1 Doc # USAMC LOGSA--Supporting Warfighters Globally U.S. Army MaterielCommand US AMC LOGSA Parts Management Plan Builder 29 April 2008.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
Life Cycle Logistics FIPT Life Cycle Logistics Learning Asset Association for FIPT Approved High Priority Competencies 21 October 2011.
Life Cycle Logistics.
CAPT Joe Spruill Office of Deputy Assistant Secretary of the Navy (Logistics) September 29, 2005 Managing Obsolescence within a Performance Based Logistics.
UNCLASSIFIED NDIA CPM 01/13/10 Page-1 Streamlining Program Reviews Terry Jaggers Principle Director, Systems Engineering Office of the Director, Defense.
1 MRL Assist Tool Website Access the MRL Assist Tool at
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Product Support Assessment Team (PSAT) Tom Simcik Performance Learning Director – Acquisition Logistics LCL FIPT 14 Nov 08.
Improving the Tradecraft in Services Acquisition Services Acquisition Training Lyle Eesley Defense Acquisition University Director Center for Services.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of: 02 Mar 051 Partnering with Industry on System Safety & MIL-STD-882D.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Sustainment Solutions Envelope (SSE) Sustainment Solutions Envelope (SSE) Presented at the Defense Standardization Program Conference, 16 March 2004.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) Hallmark Software Testbed (Hallmark-ST) Architecture to Enable Space Enterprise.
Principal Investigator ESTCP Selection Meeting
DoD Template for Application of TLCSM and PBL
Life Cycle Logistics.
Parts Management Plan Builder 26 July 07
ISA 201 Intermediate Information Systems Acquisition
Principal Investigator ESTCP Selection Meeting
Acquisition Sustainment Tool Kit (ASTK
Phase 1 Tollgate Review Discussion Template
Engineering Processes
Software Assurance Maturity Model
Principal Investigator ESTCP Selection Meeting
Engineering Processes
Executive Project Kickoff
Principal Investigator ESTCP Selection Meeting
Ms. Kristyn E. Jones Director, Financial Information Management
Presentation transcript:

Integrity  Service  Excellence Logistics Health Assessment (LHA) Terry Brinston AAC/ENQL 18 Mar 08 Air Force Materiel Command DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

War-Winning Capabilities … On Time, On Cost 2 Purpose To inform you of the effort to develop and deploy a standard, tailorable, measurable, and user friendly logistics health assessment tool across the Command

War-Winning Capabilities … On Time, On Cost 3 Problem Statements –No day-to-day standardized mechanism for assessing and measuring program office logistics planning and execution Logistics module in SMART never fully developed –Lack of historical decision trail and associated impacts –PoPS is a top level program risk assessment tool No drill down capability for specifics LHA FILLS THE VOID

War-Winning Capabilities … On Time, On Cost 4 Overview LHA –Attributes –Development –Methodology –Beta Tests How Life Cycle Efforts Fit Together LHA Integrated Master Schedule Summary

War-Winning Capabilities … On Time, On Cost 5 Attributes Designed to complement NOT replace: –Acquisition & Sustainment Tool Kit, Independent Logistics Assessments (ILA), PoPS, etc Horizontal and vertical integration –Integrates into a program office –Identifies trends across the Center’s portfolio –Shows connectivity to AFSO 21, e-Log 21, D&SWS, AFMC BSC, Bell Memo, etc. Flexibility for program uniqueness – “Tailorable” Applicable across the entire life cycle of a program Standard work, repeatable, quantitative and aggregative Documents metric trends Uses existing information to maximum extent possible

War-Winning Capabilities … On Time, On Cost 6 Development LHA three phases –Phase I: Planning (Product Center Focus) Deliverables LHA Guidebook Develop interim model - AAC Lead Beta Testing –Phase II: Sustainment (ALC Focus) Deliverables WR-ALC hosted 1 st RIE in Jan 08 –Next meeting scheduled for 3 Eglin –Beta Testing (TBD) –Phase III: SMART Integration Spiral 11, Incorporate LHA planning module (Spring/Summer 08) Sustainment Module - TBD

War-Winning Capabilities … On Time, On Cost 7 Methodology Planning Module Assessment frequency – monthly or event triggered Three top-level modules with sub-modules –Internal modules Logistics Requirements and Strategy Logistics Planning and Execution –External module Logistics Support and Partnerships –System Engineering/Budget and Funding/Contracting/Program Transition Modules are weighted based on integrated logistics elements -- the foundation to “design in support” –Numerical rating and RYG color code All modules and sub-modules are rolled up in a single “windshield” chart –Trend information displayed

War-Winning Capabilities … On Time, On Cost 8 Beta Tests Completed Beta Testing Oct 07 –P5 Combat Training Systems, C-32 CLS Program, B-1 Radar Modernization Program, Joint Environmental Toolkit (JET) Beta Test results (Product Centers) –Issue: Scoring generated misleading results (elements green / roll up yellow) Resolution: Revised scoring process –Issue: Request LHA criteria be embedded into tool as opposed to separate guidebook Resolution: LHA Tool revised to show criteria and scoring –Issue: JET comments from ESC Resolution: Ensure adequate training is available to program office

War-Winning Capabilities … On Time, On Cost 9 Customer Comments LHA addressed all the supportability/sustainment areas required in a program office to determine the overall logistics health of a program Thanks for the opportunity to provide input into the process –Like the idea LHA will feed SMART and Sufficiency Reviews –Satisfies requirement for more than one briefing/status/forum The LHA addressed all the supportability/sustainment areas that would normally be required in a program office to determine the overall logistics health of a program The scoring criteria (R/Y/G) - easy to follow and provided enough detail to adequately grade the areas being assessed The LHA Guidebook provided assessment criteria, references, and quick links to perform a complete evaluation of the logistics health assessment of the program

War-Winning Capabilities … On Time, On Cost 10 LHA - SMART Integration Automated LHA (planning), Summer 08 –SMART integration scheduled –Fills logistics reporting gap –Quick on-line assessment of logistics health PEO Reporting Template –Populates PEO Supportability Assessment Quad charts –Reports/output from LHA Criteria consistent with PoPs, Unit Compliance Inspection, ILA, A&S Tool Kit etc.

War-Winning Capabilities … On Time, On Cost 11 LHA Version 2.1 Main Menu Active Program

War-Winning Capabilities … On Time, On Cost 12 LHA Program Issue, Impact, & Mitigation Statement Data Entry Form

War-Winning Capabilities … On Time, On Cost 13 LHA Windshield Report Active Program

War-Winning Capabilities … On Time, On Cost 14 LHA Program Supportability Quad Chart Active Program

War-Winning Capabilities … On Time, On Cost 15 How Life Cycle Efforts Fit Together AF Level AFMC Develop & Sustain Warfighting Systems D&SWS Life Cycle Management Sub-Processes Define & Apply High Confidence Criteria To AF Portfolio Institutionalize Time Certain Capabilities Life Cycle Affordability - LCM-1-09 HQ AFMC/A4A Initiatives Strengthen Fielding Process Acquisition & Sustainment Tool Kit Independent Logistics Assessments Logistics Health Assessments Life Cycle Management Plans *HQ AFMC Balanced Score Card (BSC) Policy Program Transition Guidance PEO Supportability Assessments AFSO 21 Life Cycle Management (LCM) – (TBD) *Under Revision

War-Winning Capabilities … On Time, On Cost 16 Summary Accomplishments Planning Module LHA Guide Book Beta Testing OUSD/ATL Lifecycle Sustainment Enablers Embedded in LHA criteria Way Ahead –Logistics Health Assessment Planning module within SMART –Standardize metrics –Sustainment Module Incorporate into SMART (Summer 08) PEO Supportability reviews to utilize automated LHA data Provides Senior Leaders with a site picture of a program’s logistics health at any point in the system life cycle

War-Winning Capabilities … On Time, On Cost 18 BACKUP

War-Winning Capabilities … On Time, On Cost 19 Logistics Health Assessment Modules/Points Module 1: Logistics Requirements & Strategy Planning Module (30) –Requirements (10) –Product Support Strategy (15) –IMP/IMS (5) Module 2: Logistics Planning & Execution Planning Module (50) –Manpower & Personnel (5) –Maintenance Planning (5) –Support Equipment (5) –Training & Training Support –Supply Support –Facilities –Technical Data –Computer Resources Support (5) –PHS&T (5) –Design Interface (5) Module 3: Logistics Support & Partnerships (20) –System Engineering (5) –Contracting (5) –Budget/Funding (5) –Program Transition (5) Logisti cs Since the LHA references the A&S Tool Kit and ILA to assesses logistics critical product support elements are addressed throughout the program! Bottom-line: Better support for the Warfighter at a lower total cost of ownership

War-Winning Capabilities … On Time, On Cost 20 Logistics Health Assessment Modules/Points Module 1: Logistics Requirements & Strategy Planning Module (30) –Requirements (10) –Product Support Strategy (15) –IMP/IMS (5) Module 3: Logistics Support & Partnerships (20) –System Engineering (5) –Contracting (5) –Budget/Funding (5) –Program Transition (5) Module 2: Logistics Planning & Execution Planning Module (50) –Manpower & Personnel (5) –Maintenance Planning (5) –Support Equipment (5) –Training & Training Support –Supply Support –Facilities –Technical Data –Computer Resources Support (5) –PHS&T (5) –Design Interface (5)

War-Winning Capabilities … On Time, On Cost 21 LHA Rating Form Active Program

War-Winning Capabilities … On Time, On Cost 22 Logistics Mitigation Plan (LMP) Explain (in narrative) the mitigation strategy or “get well” plan for any LHA rating below 80 (Address both the module(s) and sub-module(s) contributing to any rating below 80). Accomplishment of an LMP is required with the accomplishment of any LHA. –Logistics Requirements & Strategy –Logistics Planning & Execution –Logistics Support & Partnerships This information should be archived in SMART for the duration of the program in accordance with objectives of the LHA to record historical documentation of logistics decisions across the Program’s acquisition life cycle.

War-Winning Capabilities … On Time, On Cost 23 Life Cycle LHA Planning Module Sustainment Module Coming Soon! BA Concept Refinement System Development & Demonstration Production & Deployment Systems Acquisition C FRP Decision Review LRIP/IOT&E Design Readiness Review Technology Development ( Program Initiation ) Concept Decision Pre-Systems Acquisition Operations & Support Sustainment

War-Winning Capabilities … On Time, On Cost 24 LHA Windshield Planning Module

War-Winning Capabilities … On Time, On Cost 25 LHA Integrated Master Schedule

War-Winning Capabilities … On Time, On Cost 26 Life Cycle LHA Sustainment Domain Kick off Jan WR-ALC –Purpose: assess efficacy of applying LHA tool in the Sustainment domain –Attendees: OC-ALC - Capt Franklin Shifflett 540 ACSS/DO, Mr. Samuel Champlin OC- ALC/XPR OO-ALC - Ms. Lynda Lowin 503 ACSS/DD, Ms. Judy Bell OO-ALC/XPO AAC - Ms. Terry Brinston AAC/EN, Ms. Elizabeth Jones & Mr. Danny Bridges AAC/ENL SMC - Mr. Ian Martin SLG/XP ASC - Ms. Charleen Carlson ASC/AEL WR-ALC - Mr. Kenny Dees WR-ALC/XPXP, Mr. Greg Lewis WR-ALC/XPX HQ AFMC - Mr. Robert Eardley AFMC/A4W, Ms. Merry Wermund AFMC/A4SM Next meeting is scheduled for 3 – 7 Mar 08

War-Winning Capabilities … On Time, On Cost 27 Background AAC Acquisition Tools and Processes High Quality Requirements Early PEO Engagement For Systemic Issues Proactive Risk Management Personnel Stability Positive Teaming Relationships Robust Life Cycle Program Planning Technology/Manufacturing Readiness Assessments Sufficiency Reviews Risk-Based Source Selections Accounting for Realism Probability of Program Success (POPS) Assessments Systems Engineering Assessments Cost Estimate Sufficiency Reviews Appropriate Technical Maturity Balanced Scorecard Measures Stable Funding Profile

War-Winning Capabilities … On Time, On Cost 28 AAC Assessment Life Cycle PoPS CSR SR POM Input TRIA MS A SR TRIA/ MRA CSR SEA PoPS MS B SR SEA CSR TRIA/ MRA PoPS MS C SR SEA CSR MRA/ TRIA PoPS Sustainment SR (As Required) SEA CSR (As Required) MRA/ TRIA (As Required) PoPS MonthlyAssessed QuarterlyUpdated

War-Winning Capabilities … On Time, On Cost 29 Logistics Health Assessment (LHA) Cost Sufficiency Review (CSR) Systems Engineering Assessment (SEA) Sufficiency Review (SR) Technology Readiness & Integration Assessment (TRA) Probability of Program Success (PoPS) Spiral 1 Assessment Engine (Milestones A-C) INPUTS (FROM STD AAC PRODUCTS) Spiral 2 (In work) Manufacturing Readiness Assessment (MRA) Probability of Program Success (PoPS)

War-Winning Capabilities … On Time, On Cost 30 Current State Probability of Program Success (PoPS) Acquisition and Sustainment Toolkit Supportability Reporting Guide –PEO Portfolio Sustainment Quad Chart Independent Logistics Assessment (ILA) Handbook Unit Compliance Inspection Checklist System Metric And Reporting Tool (SMART) Decision Support Module

War-Winning Capabilities … On Time, On Cost 31 Strategy to Task AFSO 21 CPI Eliminate Waste Reduce Cost Develop Airmen e-Log 21 Increase 20% availability at 10% reduced cost and reduced cycle time D&SWS Life Cycle Affordability Objectives TBDCAMS Aircraft availability Cost Per Flying Hour Financial Execution for Sustainment Key Enablers Independent Logistics Assessment Acquisition & Sustainment Process Tool Kit Program Supportability Assessment OSD Life Cycle Sustainment PoPS - AFMC BSC I2, Strengthen acquisition capability M1, Deliver weapons systems M2, Modify weapons systems LHA – AFMC BSC I4, Improve equipment availability at reduced cost I8, Strengthening fielding M3, Sustain weapons systems

War-Winning Capabilities … On Time, On Cost 32 Where We’ve Been Apr 07, Rapid Improvement Event (RIE) –ASC, ESC, AFMC/A4A, AAC, SAF/AQ Rep –Consensus on the Way Ahead Jun 07 RIE –Reviewed initial draft of LHA –Defined interrelationships with existing tools Jul 07 RIE –Refine LHA guide –Complete interrelationships –Linkage to strategic objectives

War-Winning Capabilities … On Time, On Cost 34 Interrelationships