Code Analysis
Identify the relevant codes Local building code Local accessibility code (or ADA) Local fire code (or the NFPA) Mechanical, electrical and plumbing codes Local Zoning Bylaws
780 CMR, The MA Building Code Look at the table of contents Chapter 4: SPECIAL USE AND OCCUPANCY Chapter 6: TYPES OF CONSTRUCTION Chapter 8: INTERIOR FINISHES Chapter 9: FIRE PROTECTION SYSTEMS Chapter 10: MEANS OF EGRESS Chapter 11: ACCESSIBILITY Chapter 12: INTERIOR ENVIRONMENT Chapter 13: ENERGY CONSERVATION Chapter 34 REPAIR… AND CHANGE OF USE OF EXISTING STRUCTURES
Building Code Analysis Keep together on a drawing or in a document Four basic steps: 1. Gather general building data (usually written) 2. Calculate occupancy load based on specific use (usually a drawing and a chart) 3. Analyze egress system (usually a drawing) 1. Calculate required capacity of corridors, doors, and stairs 2. Measure maximum length of egress travel 3. Measure separation of exits 4. Confirm compliance with miscellaneous requirements, such as finishes, energy use, etc. (usually in you specifications)
Step 1: Gather general data What is the “Use Group” of the building (Mixed Use) and this project (A-4)? What is the building “Construction Type” (2C)? In Mixed Use, what are the fire ratings between use groups (does not apply to us)? Is it sprinklered throughout (yes)?
IBC Use Group Definitions
Let’s use a spreadsheet…
General Data Example
Miscellaneous definitions
Step 2: Calculate occupancy 1. Use chart in code to identify Specific Occupancy Areas (in Ch. 10) 2. Create/import Occupancy Calculations schedule and fill out for each room 3. Create 1/32” scale Occupancy Plan and add color scheme 4. Adjust areas for circulation, furniture, etc, and enter into chart for each level 5. Chart calculates toilets, egress component dimension 6. Fix your plans to comply
Occupancy plan
Use a key for specific uses
Other information can be shown
Handy spreadsheet for each level:
Step 3: The egress system Egress capacity and dimensions Use required capacity calculation (it’s in inches) Divide by width of the door you have or intend to use (ours are 36”) – result is total # of doors Stair width based on occupancy of floor it serves Measure separation of exits, and note minimum required Measure maximum length of exit travel, and note max. allowed
521 CMR, the MA Accessibility code Most of these constraints will apply directly to your plans – we will look at them as we examine parts of your projects Look at the table of contents There will always be a section on your project type – in this case, Section 19 Recreational Facilities Also… Section 25: Entrances Section 26: Doors and doorways Section 27: Stairs Section 28: Elevators Section 29: Floor surfaces Section 30: Public toilet rooms Section 32: Kitchens Section 33: Changing and fitting rooms Section 34: Storage
Building Compartmentalization Indicate overall building volume and levels Color by layer, and make layer semi- opaque) Draw vertical egress components Draw horizontal egress components Indicate exits to grade clearly
Example: