Code Analysis. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical.

Slides:



Advertisements
Similar presentations
7 | Means of Egress (Life Safety Code)
Advertisements

MEANS OF EGRESS.
Determining the Occupant Load
Occupancy Classifications and Loads
Fire-Resistive Construction (2nd part)
Ceilings and Stairs RCPs good place for building systems coordination More three-dimensional variety than plans Coordinate vertical elements like elevators.
of NFPA 101 Life Safety Code 2000 Edition Means of Egress
DEPARTMENT OF DEVELOPMENT SERVICES BUILDING DIVISION Ronald L. Lynn, Director/Building Official Gregory J. Franklin, Assistant Director Neil Burning, Manager.
Building CODES Arch 3011 Design Studio 1 Prof. Sargent Architecture Southern Polytechnic State University.
Commercial Building Project Portfolio
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
IBC 2006 Chapter 5 Building Height and Areas After determining occupancies, the code analysis determines what height and areas are allowable for the occupancy.
Chapter 19 Electrical Plans.
Smoke Control Fire-Rated Stairwells Fireproofing of Structural Components Egress Lighting Fire-Resistive Construction Elements Fire and Smoke Dampers Emergency.
Won’t count Won’t count Another quiz, in two weeks Another quiz, in two weeks The Quiz.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
Interpret drawings of domestic structures. Drawing Layout The drawings on the next two pages show how a construction drawing can be laid out to show the.
Architectural Design Construction of a Wall Section Upon completion of this assignment, you will be able to accurately and neatly draw, to scale and limits,
OBC 2009 CHAPTER FIVE GENERAL BUILDING HEIGHTS AND AREAS.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Occupancy Classification Under NFPA 13 Examine the proposed facility and make recommendation on the Occupancy Classification Used to classify fuel loads.
Means of Egress Chapter 4.
Building Codes. Codes  Building Code –Regional  BOCA, SBCCI, CABO, UBC, CITY OF DALLAS, –National  IBC  Fire Code –NFC, UFC, NFPA, Life Safety 101.
Building Codes Intended to protect the public by establishing minimum standards of building safety.
Chapter 44 Building Codes and Commercial Design. 2 Links for Chapter 44 Building Codes Design Categories Using the Codes Related Web Sites.
Chapter 42 Building Codes and Commercial Design. Introduction Commercial drafting depends more on building codes –This means working with the International.
Code Analysis: Don’t try this at home. Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the.
ID 440: Project 1: Hospitality Design
The Essentials of Egress
INTD 51 human environments building code. building codes deal with almost every area of building planning, design & construction they are very complex.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Bubbling id 475 advanced issues. the hand-drawn route (must be scanned back in) cutting out paper circles (must be scanned back in) Revit (room separation.
Space Planning Chapter 7 and 16.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
ID /02 Building Codes. Catalog Description This course will introduce students to the intent scope, detail, and examination of local, state, national,
Design Development Code analysis Partition types.
ID 234 Building Codes Fall 2012 Means of Egress Chapter 4.
Overall project Overall project Individual programmed spaces Individual programmed spaces Chapter 2 Building Occupancy.
Chapter 9 ID 234 Building Codes Fall 2012 Finish and Furniture Selection.
Means of Egress Part 3 Chapter 4.
ID 234 Building Codes Fall 2012 Vertical Components of Egress.
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Codes.
Codes and costing construction + materials II. Building Code (780 CMR) Building Code (780 CMR) Accessibility Code (521 CMR) Accessibility Code (521 CMR)
Key to the set of Construction Drawings
ID 234 Building Codes Fall 2011 Means of Egress Chapter 3, part II.
Chapter 4 ID 234 Building Codes Fall 2011 Means of Egress.
Toilet design Many different regulations 1. guess what toilet features might be regulated? building code? accessibility code? universal design?
Toilet design Many different regulations 1. can you guess what might be regulated? building code? accessibility code? universal design?
Building Occupancy.
Work Area Method Level 3 Alterations – Chapter 9 prescribes requirements. 50% of Building Area Rule.
Fire Sprinkler System Presentation By Harold Stewart City Manager November 17, 2014.
“My Room” Project The Massachusetts Code Book and the rules that apply.
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
2009 IBC Egress Issues in Commercial Buildings, May 25, 2011
Chapter 2 Building Occupancy
Construction Documents
Chapter 3 Part 2: Occupant load
ID 234 Building Codes Fall 2008 Fire Suppression Chapter 5.
NFPA 5000 Occupancy Classifications
GCSE Construction & The Built Environment
Occupancy Classifications and Loads
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
RULES OF ENGAGEMENT.
Commercial Building Project Portfolio
Chapter 19 Electrical Plans.
Occupancy Classifications and Loads
Building standards Mr. Da Silva.
Presentation transcript:

Code Analysis

Identify the relevant codes  Local building code  Local accessibility code (or ADA)  Local fire code (or the NFPA)  Mechanical, electrical and plumbing codes  Local Zoning Bylaws

780 CMR, The MA Building Code Look at the table of contents Chapter 4: SPECIAL USE AND OCCUPANCY  Chapter 6: TYPES OF CONSTRUCTION  Chapter 8: INTERIOR FINISHES  Chapter 9: FIRE PROTECTION SYSTEMS  Chapter 10: MEANS OF EGRESS  Chapter 11: ACCESSIBILITY  Chapter 12: INTERIOR ENVIRONMENT  Chapter 13: ENERGY CONSERVATION  Chapter 34 REPAIR… AND CHANGE OF USE OF EXISTING STRUCTURES

Building Code Analysis  Keep together on a drawing or in a document  Four basic steps: 1. Gather general building data (usually written) 2. Calculate occupancy load based on specific use (usually a drawing and a chart) 3. Analyze egress system (usually a drawing) 1. Calculate required capacity of corridors, doors, and stairs 2. Measure maximum length of egress travel 3. Measure separation of exits 4. Confirm compliance with miscellaneous requirements, such as finishes, energy use, etc. (usually in you specifications)

Step 1: Gather general data What is the “Use Group” of the building (Mixed Use) and this project (A-4)? What is the building “Construction Type” (2C)? In Mixed Use, what are the fire ratings between use groups (does not apply to us)? Is it sprinklered throughout (yes)?

IBC Use Group Definitions

Let’s use a spreadsheet…

General Data Example

Miscellaneous definitions

Step 2: Calculate occupancy 1. Use chart in code to identify Specific Occupancy Areas (in Ch. 10) 2. Create/import Occupancy Calculations schedule and fill out for each room 3. Create 1/32” scale Occupancy Plan and add color scheme 4. Adjust areas for circulation, furniture, etc, and enter into chart for each level 5. Chart calculates toilets, egress component dimension 6. Fix your plans to comply

Occupancy plan

Use a key for specific uses

Other information can be shown

Handy spreadsheet for each level:

Step 3: The egress system  Egress capacity and dimensions Use required capacity calculation (it’s in inches) Divide by width of the door you have or intend to use (ours are 36”) – result is total # of doors Stair width based on occupancy of floor it serves  Measure separation of exits, and note minimum required  Measure maximum length of exit travel, and note max. allowed

521 CMR, the MA Accessibility code Most of these constraints will apply directly to your plans – we will look at them as we examine parts of your projects Look at the table of contents  There will always be a section on your project type – in this case, Section 19 Recreational Facilities Also…  Section 25: Entrances  Section 26: Doors and doorways  Section 27: Stairs  Section 28: Elevators  Section 29: Floor surfaces  Section 30: Public toilet rooms  Section 32: Kitchens  Section 33: Changing and fitting rooms  Section 34: Storage

Building Compartmentalization  Indicate overall building volume and levels  Color by layer, and make layer semi- opaque)  Draw vertical egress components  Draw horizontal egress components  Indicate exits to grade clearly

Example: