PRESENTATION ON ELECTRIC TRACTION ON INDIAN RAILWAYS- CHANGING PERSPECTIVES & ISSUES Ghanshyam Singh CELE/NR.

Slides:



Advertisements
Similar presentations
Damage and Loss Assessment The Electrical Sector J. Roberto Jovel.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Sistan & Balouchestan Electric Power Distribution Company
Barriers to Adoption of Clean and Efficient Technologies in the Indian Power Sector: An Analysis Using AHP Anoop Singh, S. C. Srivastava Indian Institute.
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Indian Railways Update 10 th IHHA Conference 2013 New Delhi.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
…Message Box ( Arial, Font size 18 Bold) Presentation Title ( Arial, Font size 28 ) Date, Venue, etc..( Arial, Font size 18 ) Impact of Shortage of Coal.
Introduction and the Context The Use and value of Urban Planning.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Hydropower Development: Experience of Nepal
Rolling Stock requirements
Harnessing Renewable Energy & Solar Mission of Indian Railways.
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Russian Railway Transport Research Institute (VNIIZhT) Energy strategy for rail transport: an efficient tool for managing energy savings Alexander KOSAREV.
Trans-European Transport Network and the Connecting Europe Facility
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Small Farm Profitability: Is Wind Energy the Answer? 1
SOLAR POWER SOLUTION FOR TELECOM APPLICATIONS
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Project Planning and Capital Budgeting
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Transmission and Distribution - Role of Indian Electrical Equipment in the XII Year Plan. Presentation by: Sterlite Grid Ajay Bhardwaj COO.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Mid-America Regulatory Conference Electric Cars – Can We Charge Our Way to a Carbon Free Future? June 7, 2010 Nancy Homeister Sustainability and.
ENERGY MIX IN SENEGAL WHICH ONE TO CHOOSE? General Directorate APUA CONGRESS. LUANDA 2014 Safiétou DIALLO Technical Adviser.
Solar-Powered Fuel Stations
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
How to Achieve Universal Modern Energy Access by 2030? Hisham Zerriffi (UBC) Shonali Pachauri (IIASA)
US / AFRICA WORKSHOP “DEVELOPING SUSTAINABLE TRANSPORTATION SYSTEMS 26 – 27 August, Arusha, Tanzania PRESENTATION ON RAIL ISSUES IN TRANSSHIPMENT SMAK.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Power Trading Corporation Of India Ltd. Mahendra Kumar Director, Power Trading Corporation of India Ltd. Power Trade Perspective.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
2015 Fall PR-MR & Marketing Meeting October 16, 2015 Fairo Mitchell Energy Policy Director, Public Utility Division Oklahoma Corporation Commission.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
1 ENERGY SECURITY CHALLENGES AHEAD A Railway’s Perspective By R.S Grover, Advisor Electrical Rail Vikas Nigam Ltd.,New Delhi.
Smart Grid Schneider Electric Javier Orellana
Transmission Tariff V.Balaji Chief Manager SRLDC.
CRS SANCTIONS Chetan Bakshi, CRS/Central. WHY CRS SANCTION IS REQUIRED ? Section 21 & 22 of Railway Act 1989 stipulates that “ No Railway should be opened.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
MERC (Net Metering for Rooftop Solar Systems) Regulations, 2015 One Day Workshop on Grid Connected Solar Roof-top Projects in Maharashtra by MEDA.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Energy is one of the most important files being dealt with in Jordan that are dealt with at the present time, for the big burden it puts on the national.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
Investing in the green economy: GIB’s approach to ensuring positive green impact 15 th September 2014.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
The Canadian Energy Research Institute and Friends of AIMS Present:
Canadian Energy Research Institute
GHG Mitigation in Rail Sector
Operationalizing One Nation One Grid
Open Access.
Economic Operation of Power Systems
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Mr. Annan has issued a Call to Action.
EV charging – a grid perspective
36th Southern African Transport Conference
Energy Management PPKSE 06/07 SAA.
INDIA ENERGY CONGRESS - EFFICIENT ENERGY ON 31ST JAN., 2007
Presentation transcript:

PRESENTATION ON ELECTRIC TRACTION ON INDIAN RAILWAYS- CHANGING PERSPECTIVES & ISSUES Ghanshyam Singh CELE/NR

SOME HISTORICAL FACTS First Electrification - Mumbai – Kurla, 15 RKms in 1925 at 1500 V Electrified RKms prior to independence SNCF design adopted First Section at Howrah-Burdhwan in 1958 volts DC First section electrified- Rajkharswan - Dongaposi on 25 kV AC in 1960 Present electrification RKms

Cumulative Progress of Railway Electrification on IR

CURRENT PLANS FOR ELECTRIFICATION Sanctioned work of electrification in various stages of progress 1362 RKms Works anticipated sanction during RKms Anticipated electrification projects during XI plan 3048 RKms

Impact on Present Working Expense  30% of ordinary working expense on account of fuel/energy consumed annually for traction purposes.  2/3rd of freight traffic and 1/2 the passenger traffic being hauled on electric traction. {Energy bill of over Rs.4000 crores}  Remaining 1/3rd of freight traffic and 1/2 the passenger traffic moved on diesel traction. {Fuel bill of over Rs.6000 crores-- expected to go up further to Rs crores at the present rate of HSD of Rs }.

Impact on Present Working Expense (Contd.)  Electrification of Route Kilometers (RKms).  Past total outlay Rs.5890 crores.  Present traffic hauled by electric traction, if hauled by diesel traction---additional cost Rs crores annually  Investment of about Rs.6000 crores till now towards electrification resulting in a saving of Rs.3800 crores annually  Instrumental towards the surplus generated presently

Criteria for Railway Electrification and the Changing Perspective :- Inescapable for Suburban trains/ Metro requiring high acceleration :- Haulage requirement for graded sections and high throughput by adopting heavier/longer loads :- Requirement for high density mixed (passenger/ freight) routes onwards:-  Carbon credit, environmental impact & energy security issues along with financial justification on the basis of traffic density.

Criteria for Railway Electrification and the Changing Perspective (contd.)  Economics and commercial requirements of lower fuel/ energy cost for minimal working expense  Network Solution and not sectoral route solution

Network Planning 1.Backbone Network:- Golden Quadrilateral (present) Dedicated Freight corridor (future) 2.Other Networks:- Other routes connecting major production and consumption and export gateways. Missing links and spurs in the existing electrified network

Future Perspective 1.High speed:- Technical compulsion because of high power/ high acceleration requirements. Electric traction is imperative 2.Heavy Haulage Reduced requirement of number of locomotives because of feasibility to pack higher horse power for the maximum permissible axle loads. Diesel – 6, 000 HP Maximum (6 axle, 32 ton/axle) Electric – 10,000 HP Maximum (6 axle, 22.5 ton/axle)

Perceived Limitations/issues of Electric Traction LIMITATIONS/ISSUESCOMMENTS Double Stack Container(DSC) not feasible under wire. No where in the world DSC is operated on Electric traction OHE designs have no limitation. US Rail Road & Chinese Rly are already operating DSC under wire. Change of traction created on the route after electrification affecting flow of traffic at jns. where it can not be done under the shadow of other activities (crew change, cleaning, catering, parcel) Electrification on a route primarily for major streams, traction change for minor streams can be addressed by adopting network electrification approach within the limits of viability. Shunting on unwired lines and last mile access to accident and breakdown sites Adoption of dual traction/ battery operated locomotives as shunters in electrified territory. Additional time required for restoration of OHE after accident Can be minimized to the time required for Tower Wagon checking.

LIMITATIONS/ISSUESCOMMENTS Requirement of Diesel Locos in electrified territory to sustain train services after traffic disruption. Network approach to RE takes care (e.g. Patna-Gaya, Bhusawal-Surat) Difficulties in restoration activity at accident sites Can be addressed by re-engineering of restoration methodology and breakdown tools and tackles. Expandability of Maximum Moving Dimensions (MMD) after electrification of a section. Minimum fixed dimension as per Schedule of Dimension (SOD) is the limiting factor and not OHE. Electric loco not suitable for shuntingFactually incorrect Increasing cost of electrical energyElectricity Act 2003 provides various options which shall result into a cheapest energy to Railways. Perceived limitations/issues of Electric Traction (contd.)

LIMITATIONS/ISSUESCOMMENTS Availability of EnergyElectrical – Average shortage of 8% and peaking shortage of 11% (against 30% in the past) will be bridged with initiatives taken in the power sector. Diesel- Shortage of 70% being met by imports Depleting global resources. Global developments (war etc.) Exorbitant rise in Green House Gases in atmosphere Any Other ???????????????Technology knows no limitation. Perceived limitations/issues of Electric Traction (contd.)

Conclusion  Electrification on IR has been the most debated developmental input for Rail transport leading to fluctuating pace of electrification as compared to other inputs e.g doubling, gauge conversion etc.  The debate is primarily driven by internal organizational conflicts arising out of historical evolution of traction development and perceived career prospects in specific pockets  Prevalence of non institutional operational fancies deprived of sound financial, economic, developmental and strategic appreciation.  With initiative in power sector & adoption of appropriate strategy for power procurement, cost of electrical energy is expected to go down. ELECTRIFICATION OF IR SHOULD BE DONE ON PRIORITY ON NETWORK SOLUTION & FINANCIAL VIABILITY PRINCIPALS

Strategies which needs to be looked into & evaluated for adoption on IR  Creation of Energy Management Organization Creation of Energy Management Organization  Creation of PSU as Distribution licensee Creation of PSU as Distribution licensee  Captive Generation Plan Captive Generation Plan  Deemed Captive & Distributed Generation Deemed Captive & Distributed Generation  Power Purchased from IPP/PTC through Open Access Power Purchased from IPP/PTC through Open Access  Power Purchase through State Utility(present model) Power Purchase through State Utility(present model)  Representations before SERCs & Appellate tribunals for reasonable tariffs Representations before SERCs & Appellate tribunals for reasonable tariffs  Power purchase from central generating units. Power purchase from central generating units.  Demand side management Demand side management

TREND OF AVERAGE UNIT RATE

Creation of Energy Management Organization Creation of Dedicated Energy Management Cell at Divisional, Zonal & Board’s level. Objectives of the organization  Analysis of consumption pattern and exercise control over consumption & quality of power consumed.  Evaluate various options of purchase of cheaper energy.  Analysis of ARR/tariff orders of State Utilities.  Filling objections.suggestions to SERCs.  Filing appeal with Appellate Tribunal.  Regulate contract demand with distribution licensee as per consumption pattern & anticipated traffic.  Energy conservation measure.

Creation of PSU as Distribution licensee Cost of generation of BUS2.10 CTU STU Railway PSU as Distribution licensee Level of payment In many cases may not be required Level of availing power supply by Railways PSU as distribution licensee may file its own ARR & obtain a cheaper tariff for Railways.

Captive Generation Plan Indian Railways may install its own captive generation plant Cost of generation 2.10 Level of availing power supply by Railways CTU STU Level at which payments to be made by Railways

Deemed Captive & Distributed Generation Railway may become 26 % equity holder in various generation companies & acquire status of captive generation plant by consuming 51 % energy generated by the plant. Cost of generation 2.10 Level of availing power supply by Railways CTU STU Level at which payments to be made by Railways

Power Purchased from IPP/PTC through Open Access Cost of energy at generator bus2.10 CTU STU own region STU (Inter region) 0.25 * 2.85 State wheeling charges & loss compensation Cross subsidy Level of payment by Railways Level at which power supply is availed by Rlys * Theses layer may not be there in some of the load points

Power Purchase through State Utility ( Present model) Cost of purchase by utility 1.95 CTU (PGCIL) (Wheeling charges+loss compensation) STU (Wheeling + loss compensation) O & M+Distribution loss+ inefficiency Surcharge (Cross subsidy to other consumers) Payment is made by Railways Level at which power supply is availed by Railways

Representations before SERCs & Appellate tribunals for reasonable tariffs Regular representation to SERCs in a professional way Following table showing the trend of average unit cost as a result of regular representation to SERCs

POWER PROCURED THROUGH CENTRAL GENERATING UNITS Level at which payment is made Level at which power supply is availed by Railways 3.66 To NTPC as extra surcharge as per commitment Surcharge by state utility Rly network-Wheeling+ loss compensation CTU (PGCIL) Cost of power from NTPC 2.20

Demand Side Management Correct estimation of contract demand. On line monitoring of actual maximum demand. Ensuring high load factor. Load balancing through transfer of sections between feeding zones. Installation of power factor correction equipment. Real time on line coordination with Traffic.