San Francisco Bay Area Municipal Regional Stormwater Permit (MRP) Presentation to Regional Water Board March 14, 2007.

Slides:



Advertisements
Similar presentations
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
Advertisements

Los Angeles County MS4 Permit Reissuance: New Directions & Strategy Presented by LA Regional Water Quality Control Board Southern California Water Dialogue.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Municipal Regional Stormwater NPDES Permit Overview of Requirements, Recommended Changes, and Assistance Needed March 12, 2009.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Family Resource Center Association January 2015 Quarterly Meeting.
Draft Phase II Small MS4 General Permit Water Quality Monitoring & Assessment Jonathan Bishop Chief Deputy Director Director State Water Resources Control.
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
MRP Pollutants of Concern Copper Provisions Monday November 20, 2006 Richard Looker - RWQCB.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
COLORADO STORMWATER COUNCIL – MS4s WORKING TOGETHER Jill Piatt Kemper, PE, Sr. Environmental Engineer City of Aurora, CO (Phase I) Council Chair.
Lake Erie HABs Workshop Bill Fischbein Supervising Attorney Water Programs March 16, 2012 – Toledo March 30, Columbus.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
SWAMP Statewide Monitoring Programs Statewide Monitoring Programs Regional Monitoring Programs Regional Monitoring Programs Infrastructure & Tools Infrastructure.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
IMLA New England Regional Land Use Seminar June 21, 2012 Work Session 2. Storm Water Management James N. Katsiaficas, Esq. P.O. BOX 426 PORTLAND, MAINE.
Latest Developments - Effectiveness Assessment and Research Priorities Geoff Brosseau California Stormwater Quality Association (CASQA) December 4, 2007.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
MAYOR/COUNCIL/ADMINISTRATOR FORM OF GOVERNMENT MAYOR FORMAL AUTHORITY 1. Presides at all meetings of Council. 2. Administers oaths of office. 3. Signs.
Using the MS4 Program Evaluation Guide 1/28/20161 Using the MS4 Program Evaluation Guidance.
Training Approach and Expectations 2/6/20161 Training Approach and What to Expect.
Elizabeth Miller Jennings Office of the Chief Counsel State Water Resources Control Board Peter Bowes 5/20/2009 Flickr REGULATION OF STORM WATER DISCHARGES.
Jennifer Fordyce State Water Resources Control Board – Office of Chief Counsel.
CITIZENS ADVISORY COMMITTEE SPRING MEETING MARCH 1—2, 2012 CHARLOTTESVILLE, VA EPA’s Evaluation of Bay Jurisdictions’ Draft Phase II WIPs & Final
TMDL for Diazinon in Chollas Creek Watershed TMDL for Diazinon in Chollas Creek Watershed Linda Pardy (858) Jimmy.
1 Provision C.3. New and Redevelopment Performance Standards Sue Ma Water Quality Control Board San Francisco Bay Region November 15, 2006.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Slide 1 California Implementation Water Board Policies.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Municipal Separate Storm Sewer System (MS4) Permit
STORMWATER MANAGEMENT
Sacramento County Stormwater Quality Program
Mulberry Watershed Management Plan
John Tinger U.S. EPA Region IX
Sacramento County Stormwater Quality Program
Presentation transcript:

San Francisco Bay Area Municipal Regional Stormwater Permit (MRP) Presentation to Regional Water Board March 14, 2007

The Clean Water Act  Municipal Stormwater (MS4) Permits: may be issued system- or jurisdiction-wide may be issued system- or jurisdiction-wide must include an “effective” prohibition of non-stormwater discharges into municipal storm sewers must include an “effective” prohibition of non-stormwater discharges into municipal storm sewers Shall require controls to reduce discharge of pollutants to the maximum extent practicable (MEP) Shall require controls to reduce discharge of pollutants to the maximum extent practicable (MEP) 33 USC § 1342(p)(3)(B)

Relevant Court Decisions  Defenders of Wildlife v. Browner (9 th Circuit 1999): Congress set MEP as the standard for MS4 permits and did not require more stringent limitations to address water quality standards but gave the State discretion to impose additional pollutant control provisions if it determines they are appropriate  City of Burbank v. SWRCB (Cal. Sup. Ct. 2005): Under State law, economic considerations must be taken into account with regard to NPDES permit provisions that exceed the Clean Water Act’s requirements  Divers’ v. SWRCB (Cal. Ct. of App. 2006): A Regional Board is not required to impose numeric effluent limitations in stormwater discharge permit and may utilize a best management practices (BMP) approach

State Water Board Precedents  Order WQ-91-03: Due to the intermittent and highly variable nature of stormwater discharges, numeric effluent limitations are not required – a best management practices (BMP) approach is acceptable  Orders WQ and : MS4 permits to contain specific language requiring water quality standards be addressed over time by an iterative process for BMP effectiveness evaluation and improvement/fine tuning

EPA Guidance for Municipal Stormwater Permit Renewals Municipalities should:  describe priorities for implementing controls  identify proposed changes to the MS4’s stormwater management and monitoring programs, including de-emphasizing or even eliminating certain program components Permitting authorities are expressly encouraged to work with municipalities to make such determinations

Bay Area Cities’ Interests  Achieve significant and incremental water quality improvements  Prioritize requirements to be imposed on local governments  Reduce the administrative burden of municipal stormwater (MS4) permits so as to focus on actual water quality improvements  Establish a level playing field

Key Aspects of Challenge  Combine 6 permits into 1 regional permit (MRP) covering 76 municipalities  Provide consistency with adopted TMDLs (mercury, diazinon) and address other identified pollutants of concern (copper, PCBs, dioxin, trash)  Recognize that local resources to address water quality needs (in addition to police, fire protection, parks) are limited, so that the MRP’s requirements must reflect a prioritization

Municipal Cooperation on MRP  Municipal program managers regularly participated in a Regional Board staff-led Steering Committee to try and guide the overall draft permit development process  Municipal staff participated in extensive “work group” sessions on individual components of the MRP (but without attempting to prioritize them) to try and reach consensus with interested persons and RB staff  After vetting with and gaining acceptance from all 76 prospective co-permittees (including on proposed program enhancements and associated budget increases), BASMAA submitted comprehensive, prioritized, and integrated provisions and performance standard tables for use in a draft MRP in September 2006

 Prioritizes required actions based on water quality needs (TMDL and other pollutants of concern to receive more focus and resources)  Incorporates detail directly into the permit mandatory levels of effort/deliverables mandatory levels of effort/deliverables reporting and effectiveness requirements and deadlines reporting and effectiveness requirements and deadlines  Adds comprehensive water quality monitoring requirements  Requires implementation of the “C.3” new and redevelopment numeric treatment standards down to the 10,000 S.F. level  Requires implementation of hydromodification management plans/programs (HMPs) well in advance of the rest of the State The Municipalities’ Submission:

Enhancement Example: TMDL-Related Requirement – Mercury (1 of 9 Proposed Program Components on Mercury) Control Measures / BMPs Level of Implementation Reporting Mercury Source Identification Program Element Identify, qualitatively rank, and map potentially key areas with significantly elevated mercury concentrations in surface soil/sediment in Bay Area (i.e., scoping exercise based on existing literature and data). Report in First Annual Report due 9 or more months after Permit’s adoption Mercury Source Confirmation and Abatement Program Element Confirm the potential presence of elevated mercury concentrations in selected highly ranked locations via visual inspections and determine whether runoff from such locations is likely to enter municipal stormwater conveyances. Validate suspected source areas via field sampling and analysis. Provide information on potentially responsible parties to agencies and facilitate issuance of cleanup orders. Report in 2nd Annual Report due after Permit’s adoption Report in 3 rd and 4th Annual Reports due after Permit’s adoption

Enhancement Example: TMDL-Related Requirements – Diazinon and Related Pesticides Associated with Water Quality Toxicity Control Measures / BMPs Level of Implementation Reporting Adopt IPM policy or ordinance Include provisions to minimize reliance on pesticides that threaten water quality and encourage use of IPM in municipal operations and on municipal property If not already in place, adopt policy or ordinance within 18 months of adoption of this Order Confirm adoption of ordinance / policy in Annual Report

Enhancement Example: Trash and Litter Controls Control Measures / BMPs Level of Implementation Reporting Trash and Litter Control Phased approach to litter/trash cleanup  Identify and assess high accumulation areas  Identify current and new management actions/BMPs  Identify High priority inlets  Implement pilot projects  Provide trash receptacles  Incorporate litter in PIP messages  Adopt anti-litter ordinances Annual Report on all management actions, effectiveness and enforcement

Enhancement Example: Monitoring Related Requirements Control Measures / BMPs Level of Implementation Reporting Monitoring Program - Characterize water quality in urban runoff - Assess impacts - Identify sources - Assess progress - Evaluate Effectiveness  Identify current status and trends in water quality  Conduct long-term Monitoring via SWAMP  Use SWAMP consistent protocols  Perform assessments  Bay-wide monitoring to be coordinated with TMDL implementation Annual Electronic Reporting

“C.3” and HMP Implementation  76 Bay Area municipalities have only recently begun implementing numeric treatment standards down to the 10,000 SF level of projects for all land use types (except single homes) This required a substantial increase in municipal planning staff to review small (< 1 acre) project proposals for compliance This required a substantial increase in municipal planning staff to review small (< 1 acre) project proposals for compliance Unlike elsewhere in the State, the Bay Area approach is not limited to applying these numeric standards only at: Unlike elsewhere in the State, the Bay Area approach is not limited to applying these numeric standards only at: larger sites (> 100,000 SF) with industrial/commercial uses,larger sites (> 100,000 SF) with industrial/commercial uses, housing developments of 10 or more units, andhousing developments of 10 or more units, and significant projects on steep hillsides or located adjacent to sensitive habitatssignificant projects on steep hillsides or located adjacent to sensitive habitats  Desired focus is on solving challenges related to implementation of both C.3 and HMP requirements  Just beginning to gain experience on implementing these controls and need to assess effectiveness  Changing these requirements now would be confusing and burdensome to developers and municipal planning and redevelopment staff

Why Prioritization is Vital  Bay Area municipalities are at or fast approaching stormwater-related assessment caps and the chances of getting more funding via a 2/3rds vote are not good  Municipalities are increasingly using grant funds to pay for projects but these are limited, do not help with O&M, and are not sustainable for the long-term  Given our inability to increase assessments and the competition with other municipal general revenue needs (police, fire, parks), substantially increasing local stormwater funding is unrealistic  The municipalities’ proposals include a number of enhancements that will cost more so some lower priority items need to be capped, reduced, or even sunsetted – everything cannot be a priority at once !

Requests  Request Board member input as part of today’s workshop, particularly with respect to issues of priorities and prioritization  Request circulation of the municipalities’ proposed provisions and performance standard tables as part of the staff draft MRP for comment  Executive Officer to schedule another workshop to: inform the Board of comments received inform the Board of comments received present staff recommendations present staff recommendations obtain direction for Tentative Order content and timing obtain direction for Tentative Order content and timing