SCEC – PG&E-SCE 2013 Research Coordination Meeting Norm Abrahamson Sep 14, 2012.

Slides:



Advertisements
Similar presentations
Line Efficiency     Percentage Month Today’s Date
Advertisements

March 7, 2008NGA-East 2nd Workshop1 RECENT DEVELOPMENTS IN STRONG MOTION SIMULATIONS FOR CEUS Paul Somerville and Robert Graves URS Pasadena MOTIVATION:
Characterization of Ground Motion Hazard PEER Summative Meeting - June 13, 2007 Yousef Bozorgnia PEER Associate Director.
Project Review and Summary of NGA Supporting Research Norm Abrahamson NGA Workshop #6 July, 2004.
11/02/2007PEER-SCEC Simulation Workshop1 NUMERICAL GROUND MOTION SIMULATIONS: ASSUMPTIONS, VERIFICATION AND VALIDATION Earthquake Source Velocity Structure.
Belgrade, Apr 2013 Radmila Salic, MSc. 2 nd Project Workshop Improvements in the Harmonized Seismic Hazard Maps for the Western Balkan Countries|
Comparison of Recorded and Simulated Ground Motions Presented by: Emel Seyhan, PhD Student University of California, Los Angeles Collaborators: Lisa M.
1 The SCEC Broadband Ground Motion Simulation Platform Paul Somerville, Scott Callaghan, Philip Maechling, Robert Graves, Nancy Collins, Kim Olsen, Walter.
IMPLEMENTATION OF SCEC RESEARCH IN EARTHQUAKE ENGINEERING ONGOING PROJECTS SCEC PROPOSAL TO NSF SCEC 2004 RFP.
Major Ongoing Ground Motion Research Programs at PEER Yousef Bozorgnia, Ph.D., P.E. PEER, University of California, Berkeley.
Potential Uses of OEF at PG&E Norm Abrahamson Mar 16, 2015.
Broadband Ground Motion Simulation Plans Paul Somerville URS SCEC Ground Motion Simulation Validation Progress Workshop Sept 9, 2012.
1 SCEC Broadband Platform Development Using USC HPCC Philip Maechling 12 Nov 2012.
EERI Seminar on Next Generation Attenuation Models Role of SCEC Ground Motion Simulation Validation Technical Activity Group (GMSV TAG) in SEISM Project.
Session 1A – Ground Motions and Intensity Measures Paul Somerville Andrew Whittaker Greg Deierlein.
The SCEC Broadband Platform Recent Activities and Developments Philip Maechling, Fabio Silva, Scott Callaghan, Thomas H. Jordan Southern California Earthquake.
SCEC Workshop on Earthquake Ground Motion Simulation and Validation Development of an Integrated Ground Motion Simulation Validation Program.
The SCEC Broadband Platform: From a Research Platform to an Industry Tool 2013 SCEC Annual Meeting Katie Wooddell.
Southern California Earthquake Center SCEC Technical Activity Groups (TAGs) Self-organized to develop and test critical methodologies for solving specific.
Phase 1: Comparison of Results at 4Hz Phase 1 Goal: Compare 4Hz ground motion results from different codes to establish whether the codes produce equivalent.
Unified Structural Representation (USR) The primary mission of the USR Focus Area has been the development of a unified, object-oriented 3-D representation.
Process for 2007 Maps CA Oct 2006 PacNW Mar 2006 InterMtn West June 2006 CEUS May 2006 National User-Needs Workshop DEC 2006 CA Draft maps (Project 07)
Southern California Earthquake Center SI2-SSI: Community Software for Extreme-Scale Computing in Earthquake System Science (SEISM2) Wrap-up Session Thomas.
Fault Segmentation: User Perspective Norm Abrahamson PG&E March 16, 2006.
NGA Project Review and Status Norm Abrahamson NGA Workshop #5 March, 2004.
1 Upper Basin Snowpack as of 3/26/2014
Four files erik_a2_stockholm_temp Erik simulation scenario A2 until 2100 erik_a2_stockholm_prec Erik simulation scenario A2 until.
UID Program Plans.  Template Released after last JACG 14 October  Comments Rec’d from the Air Force and the Army Plans need to address: Cost, schedule.
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Jan 2016 Solar Lunar Data.
NGA-East Tentative Plan
Meeting Objectives Discuss proposed CISM structure and activities
The SCEC Broadband Platform: Computational Infrastructure For Transparent And Reproducible Ground Motion Simulation Philip J. Maechling [1], Fabio Silva.
Philip J. Maechling (SCEC) September 13, 2015
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Broward County Consolidated Communication Committee Update

2017 Safety Group 1 – 5 Year Program Timeline Guide

Mammoth Caves National Park, Kentucky
Iowa College Aid Processing System (ICAPS)
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Wireless Local Number Portability Timeline - Phase 2
Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Capacity Methodologies Review 2019
Back-End Payor Sub-Group


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Objective - To make a line graph.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2

Rev. 5 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY SERVICE PROVIDER JUN JUL AUG SEP OCT NOV DEC JAN.
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Wireless Local Number Portability Timeline - Phase 2
Pilot of revised survey
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

SCEC – PG&E-SCE 2013 Research Coordination Meeting Norm Abrahamson Sep 14, 2012

Objective Set up a more formal process for how SCEC, PG&E and SCE will collaborate on seismic research Set the research topics and budgets in time to meet the schedule for the SCEC RFP. – Is September the best month for this?

SWUS Schedule May – Sep 2012 – Set up validation exercises Jun - Nov 2012 – Additional modules added to broadband platform – Simulations from non-planar ruptures Sep 2012 – Mar 2013 – Validations (parts A and B) – Present plan for numerical simulations at SSHAC Workshop Apr 2013 – SCEC evaluation of simulation methods (combination of modules) that pass the validation May – Oct 2013 – SCEC Workshop (June?) comparison of Initial results from forward simulations from methods that passed validation – SCEC Workshop (September) to evaluate results and understand causes of differences – SSHAC Workshop (October) simulation results and empirical GMPs Nov Feb 2014 – Final results from second set of forward simulations

SWUS 2013 Topics Validation of broadband platform – Part A (compare simulations to recorded eqk) 23 validation earthquakes Reduce scope to 10 eqk if running out of time – Part B (compare forward simulations to NGA medians) 2-4 scenarios (M6.5, M7.0, R=15, R=40, rock site) – Complete Mar 2013 – Evaluation by SCEC panel in Apr 2013 – 2013 Budget $250K each from SCE and PG&E ($500k total) Plus 15% SCEC overhead

SWUS 2013 Topics Application of broadband platform (Forward modeling) – Cases to be set at the Mar 2013 workshop – Should be fairly limited volume of runs 3-4 rupture geometries for DCPP and SONGS 1-2 rupture geometries for PVNGS – Initial set of simulations by Sep 2013 Need workshop to review/compare results – Revised set of simulations by Feb 2014 – Budget in SWUS project plan is $100k

PG&E Topics – SSC Chances of Branch faulting – Use of quasi-static earthquake simulators – Use of dynamic rupture models to evaluate chances of branch faulting Verification of the dynamic rupture models for branch faulting Continuing support for dynamic rupture TAG Will this be ready for application by Nov 2013? – DCPP geometry: Strike-slip faults, degree difference in strike Magnitude pdf for faults – Evaluation of characteristic eqk model as used in the seismic hazard industry Location of 1927 Lompoc earthquake – Other catalog issue – Adequate documentation for the catalog? CFM extending north to San Luis Obispo?

PG&E topics - GM Broadband platform – long term items – Add NL site to the simulations – Add 3-D crustal models to validation Need 3-D models at our sites to be of use – Additional methods – Process needed Evaluation of method – Documentation should be complete Implement module in BB platform – Validation of the variability of source parameters in the rupture generator Needed for replacing empirical GMPEs with simulations Not to be used in SWUS (will use empirical sigma)

PG&E topics - GM Extending dynamic rupture models to high frequencies Need validation Will this go on the broadband platform? Simulations for creeping faults Source parameters for creeping faults from dynamic ruptures? – CVM extending north?