Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.

Slides:



Advertisements
Similar presentations
TEA Facilities Standards
Advertisements

Occupancy Classifications and Loads
MULTIPLE PROFESSIONAL REVIEWS DOCUMENT SOLUTIONS Architectural and engineering review identifies building code and accessibility repairs needed. ($750,000.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
May 6, 2010 Irvine Unified School District HMC Architects.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
 Mechanical  Electrical  Safety/Security  Video surveillance  Fire safety  Access control  Enhanced Programming  Roofing/Structural/Site Work.
1 Capital Budget and Capital Improvement Program Request Public Hearing AGENDA 7:00 - 7:15Presentation of Capital Improvement Program Budget Request 7:15.
Yelm Community Schools  We are at a critical need for safety/security upgrades, more classroom space, and building improvements. ◦ Student growth:
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Ector County Courthouse Needs Assessment Study Status Report Brinkley Sargent Architects Greg Read Gina Irwin January 12, 2015.
SCHEMATIC DESIGN PRESENTATION
Kenmore -Town of Tonawanda Union Free School District PHASE 2 CAPITAL PROJECT DEVELOPMENT PRESENTATION We educate, prepare, and inspire all students to.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
Bay Elementary School Historical School Site (1938)
Fairfax County Public Schools Capital Improvement Plan FACILITIES & TRANSPORTATION August 7, 2013.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Building for Their Future Dublin Unified School District.
1 DeLeon Independent School District Facility Committee Organizational Meeting July 20, 2006.
Managing the Facilities Asset Portfolio Prepared for the Tuition Policy Advisory Committee by The University of Texas Physical Plant September 10, 2003.
1. 2 A look at Katy ISD in square miles –three counties –two cities 47,800+ students 6,300+ employees 44 campuses 12 support facilities.
Raising the Bar for DCPS School Facilities Best Practice in PK-12 Educational Facility and Capital Planning.
Manistee County Library Master Space Plan December 2013 Quinn Evans Architects & GMB Architecture and Engineering.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
Central Texas College Technology Plan by Amy McAnally.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
MMSD Facility Assessment Outline Mission and Goals History –Building Construction Dates Facility Management Process –Previous 5 year Plan –Website –
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Construction Management Copyright © Texas Education Agency, All rights reserved. 1.
Carroll County Public Schools Board of Education Work Session August 27, 2014 FY 2016 Capital Budget and FY 2017 – FY 2021 Capital Improvement Program.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
…BUILDING THE FUTURE THROUGH OUR CHILDREN! WE’VE BEEN BUSY SINCE 2005! * Built on to the H.S./M.S. * Replaced 4 roofs * Upgraded our Heating Systems*
1 Item Th25c Applicant SeaWorld San Diego Project Description Renovate existing guest entrance area to an existing theme park to include construction.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Willard and DiLoreto Hall Renovation and Addition
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Munday CISD Areas Targeted for Improvement. Currently Day Care, Elementary Music and Reading Classes in 3 separate portable, temporary buildings New addition.
White Pigeon Community Schools
JOHN A. HOLMES IMMEDIATE FACILITY NEEDS
High School Capacity Committee
Answer these questions.
February 13, 2017.
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Cornwall Central School District
Joint Schools Construction Board Phase II
Southern Lehigh School District
WOU Budget Committee February,
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
Worcester Public Schools Study and Master Plan
Raising the Bar for DCPS School Facilities
Space Utilization Advisory Committee November 14, 2017
2007 Bond Issue Capital Improvement Program
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Recent Bond Accomplishments
Recap of the Facility Assessment
Performance Measurement Review July 2018
Stoughton Public Library
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013

Klein High School The scope of work includes the following: –Replacing 11 existing buildings that range from 45 to 30 years in age. –Retaining 4 buildings, 3 of which are less than 10 years in age and the +30 year old Natatorium that total 120,133 square feet. –Constructing additional square feet to raise the capacity of Klein High School up to serve 3,500 students. The new total size of KHS will be approximately 636,350 square feet. –Constructing new parking areas, drives, site utilities, and storm detention.

Klein High School Many of the existing KHS instructional spaces such as classrooms, science labs, computer labs, and library do not and have not met the Texas Education Agency space, minimum square foot, and design requirements for many years. The facilities were built to code at the time of construction. The cost to correct these types of items is not included in the amounts quoted below because according to the study they are “not feasible to correct”. Several of the existing buildings were not originally designed with HVAC systems. Accessibility to spaces and restroom facilities do not meet current Texas Department of Licenses and Regulations (TDLR) & the Americans with Disabilities Act (ADA) requirements. The facility assessment study identified $9,200,000 worth of Mechanical, Electrical and Plumbing replacement costs and $8,900,000 worth of renovation costs needs over the next four years. Safety and security are continually increasing issues with a campus with 15 separate buildings. The new facility would be primarily under one roof.

Buildings for further study by assigned architect