OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212)337-2008.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Construction Crane Safety (new requirements 2010)
Working Around/Under Loads
Subpart CC Cranes & Derricks in Construction Effective 11/8/2010.
Tower Crane Safety Regulations
Boom Lift and Scissor Lift UNIVERSAL STUDIOS
1 The New Steel Erection Rule: Highlights. 2 Steel Erection Final Rule Published January 18, 2001 Implemented January 18, 2002 Includes exceptions for.
Presenter Name Presenter Title Event Name
OSHA/C-DAC Requirements for Riggers & Signal Persons
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Scissor Lift Safety Training
Fall Protection Falls 4,628 fatal work injuries were recorded in the United States in deaths a week or 12 deaths every day 806 construction related.
1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Crane Safety Vincent J. Giblin, General President.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
Rigging, Signals, Power Line Safety & Assembly / Disassembly in Construction Safety Standard WAC This presentation is intended to “summarize” the.
Cranes Safety M. Zaman Bhatti Manager HSE, National Refinery Limited
OSHA Office of Training & Education
OSHA Office of Training & Education1 Cranes. 2 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures.
OSHAX.org - The Unofficial Guide To the OSHA
Washington State’s New Construction Crane Rule
Presented by: John Cole General Manager, CICB – Definitions – Crane Inspections – Wire Rope Selection and Inspection Criteria.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
OSHA 29 CFR Part 1926 Cranes & Derricks In Construction
Risk Engineering The proposed OSHA crane standard Zurich Services Corporation.
Morrow Equipment C O M P A N Y, L. L. C. Peter Juhren Corporate Service Manager Morrow Equipment Co. L.L.C. Salem, OR USA Peter Juhren Corporate Service.
Crane Safety, Subpart N
Cranes, Hoists and Truck Hoists
Electrocution 44% Rigging Failure 15% Load Handling 14% Operator Error 7% Overload 7% Dismantling Boom 5% Wire Rope Failure 3% Miscellaneous 3% Struck.
1 Cranes Module 13. 2Objectives After this module you should be able to – identify the most common crane hazards – take the necessary steps to avoid those.
WAC Part L Construction Cranes, Rigging, and Personnel Lifting
Safety : Cranes Introduction to Industrial Technology Spring 2014 Mr. Shubert 1.
Hydraulic Crane Safety. Hydraulic Cranes Can be stationary or attached to trucks, trains and boats Can be stationary or attached to trucks, trains and.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
Subpart CC Qualified person means a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive.
Office of Training & Education1 § SUBPART L SCAFFOLDS.
CFR SUBPART L SCAFFOLDS
Systems of Safety Applied to Focus Four Hazards USDOL-OSHA Susan Harwood Grant SHT21005SH0.
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction.
History of New Crane & Derricks Standard July 30, 2003: C-DAC first meeting July 30, 2003: C-DAC first meeting Committee met 11 times Committee met 11.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
1926 Subpart R OSHA’s Steel Erection Standard Scope
ARE YOU READY FOR 11/10/14? What a Simple Read of OSHA’s Personnel Qualification Rules May NOT Tell You.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
OSHA Crane Rule – Impact on other Machines Steve Neva AEM 25 th Joint Technical Liaison Meeting 16th-17th April, 2015 Tokyo, Japan.
Slide 1 (of 15) Aerial Lift Safety in Construction Michael McCann, PhD, CIH Director of Safety and Ergonomics The Center to Protect Workers’ Rights
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Crane Questions Jim Shelton, HNAO CAS These are not necessarily official OSHA opinions but guidance until official interpretations may or may not be.
Florida Marine Contractors Association
Benjamin Ross, Assistant Regional Administrator for Enforcement Programs February 13, 2012 ASSE FEBRUARY MEETING Federal OSHA Update.
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
Crane & Derricks In Construction
Overview of ASME P Planning for Load Handling Activities
Electronic Report of Injuries & Illness
Cranes and Derricks Safety
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
Presented by: ETTA, OSH Division,
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Working Around/Under Loads
Who is Responsible for Overhead Crane and Hoist Operations
Lifting & Rigging Continuing Education Fourth Quarter 2016
Steel Erection 29 CFR 1926, Subpart R
§ SUBPART L SCAFFOLDS 1.
Personal Protective Equipment
Click anywhere to get started…
Crane Operators Association of Bermuda
Line Clearance Tree Trimming Operations
Steel Erection 29 CFR 1926, Subpart R
Presenter Name Presenter Title Event Name
10-hr. Construction – Cranes
Presentation transcript:

OSHA Cranes & Derrick Review Subpart CC John Frowd Compliance Assistance Specialist United States Dept. of Labor-OSHA Manhattan Area Office (212) ASSE Meeting

Learning Objectives Review highlights of the new crane and derricks standardReview highlights of the new crane and derricks standard Identify crane operator qualification and certification requirementsIdentify crane operator qualification and certification requirements Identify types and frequency of inspections for overhead cranesIdentify types and frequency of inspections for overhead cranes Identify supplemental requirements for tower cranesIdentify supplemental requirements for tower cranes 3

Topics to be Covered New Standard Scope Ground Conditions Assembly/Disassembly Power Line Safety Inspections Rigging Signals Operator Qualification/Certification Tower Cranes (supplemental requirements) 4

Cranes and Derricks 5 Effective Date - November 8, 2010

Important Dates Released – July 28, 2010 Published – August 9, 2010 Effective – November 8, 2010 –Qualification of riggers Phased in over four years – August 9, 2014 –Certification of operators phased in over four years (except for State and local licensing) 6

Highlights Scope Definitions Ground Conditions Assembly/Disassembly Power Line Safety Inspections Wire Rope Safety Devices Operational Aids Operation Authority To Stop Signals Fall Protection Work Area Control Keeping Clear Of The Load Free Fall/ Controlled Load Lowering Operator Qualification and Certification 7 Signal Person Qualifications Qualifications of Maintenance and Repair Workers Training Hoisting Personnel Multiple Crane/Derrick Lifts Design, Construction and Testing Equipment Modification Tower Cranes Derricks Floating Cranes & Land Cranes on Barges Overhead and Gantry Cranes Dedicated Pile Drivers Sideboom Cranes Requirements for Equipment w/ Capacity of 2000 lbs and Less

Subpart CC is Substantial 1075 pages (with preamble) 275,633 words 1,517,395 characters 14,478 paragraphs 36,405 lines 8

What is Covered? Functional Description –Can hoist –Lower –Horizontally move a suspended load Long List of Examples 9

Scope Specific Exclusions Backhoes and forklifts Limited Requirements for: Capacity: 2000 pounds or less Dedicated pile drivers Overhead and gantry cranes Side-boom tractors Supplemental Requirements for: Tower cranes Derricks Floating cranes & land cranes on barges 10

Ground Conditions 11

Ground Conditions Controlling Employer To Inform User and Equipment Operator of Known Underground Hazards (voids, utilities, etc.) 12

Assembly/Disassembly 13

Assembly/Disassembly Two Options: –Manufacturer procedures or –Employer procedures (criteria requirements) 14

Assembly/Disassembly Assembly/Disassembly Supervisor –Must be a competent and qualified person Assembly/Disassembly Supervisor Must Understand Procedures and: –Review procedures (unless they’ve used them before) –Check that crew members understand their tasks and hazards –Follow manufacturer’s prohibitions –All rigging work is by a Qualified Rigger –When using outriggers, fully extended or deployed per the load chart 15

Power Lines 16

17 Could you get within 20 feet of a power line? YESNO Option #1 Deenergize & Ground Encroachment Prevention Measures Option #3 Ask Utility for Voltage and Use Table A (with minimum clearance distance) Option #2 20-foot Clearance No Further Action Planning Meeting If Tag Lines are Used, They Must be Nonconductive Elevated Warning Lines, Barricades, or Line of Signs PLUS (Choose One): Proximity Alarm, Spotter, Warning Device, Range Limiter, or Insulating Link

Operator Qualification/Certification 18

Operator Qualification and Certification - 4 Options OPTION 1 OPTION 1: Accredited Testing Organization OPTION 2 OPTION 2: Employer Qualification Program OPTION 3 OPTION 3: U.S. Military OPTION 4 OPTION 4: State/Local Government License 19

Operator Qualification and Certification (cont’d) 20 OPTION 1: Accredited Testing Organization OPTION 2: Employer Qualification Program OPTION 3: U.S. Military OPTION 4: State/Local Gov License Knowledge (Written Test): –Controls/performance characteristics –Calculate capacity (with or without calculator) –Preventing power line contact –Ground support –Read and locate info in operating manual –Appendix C subjects Practical Test Testing Criteria

Signaling 21

Signals Signal Person - When Required: –Point of operation not in full view of operator –View of direction of travel is obstructed –Site specific safety concerns Signal Types: –Hand, voice, audible or “new” –Only time an operator can use a cell phone while lifting 22

Signals (cont’d) Signal Person Qualifications 3 rd Party Qualified Evaluator Yes Employer Qualified Evaluator YesNo 23 Qualified HowDocumentationPortable

Inspections Modified or Repaired/ Adjusted Qualified Post-assemblyQualified ShiftCompetent MonthlyCompetent AnnualQualified 24 Type of Inspection:Who Inspects: Type of Inspection: Who Inspects:

Inspections Shift = Visual Inspection for Apparent Deficiencies Monthly = Documented Shift Inspection Annual = Comprehensive, Every 12 Months 25

Fall Protection Part CC has its Own Fall Protection Requirements Training Requirement Ties Back to Subpart M Subpart M Reference to Anchor Points 26

Wire Rope Inspections Daily – No Documentation Monthly – Documented Annual – Documented Category I, II or III Deficiencies 27

Tower Cranes 28

Highlights of Supplemental Tower Crane Requirements Foundations & Structural Supports Design & inspection Plumb Tolerance Specification & verification Climbing Procedures Host structure strength verification Wind Post-erection Load Test Monthly Inspection: Tower mast bolts, upper-most tie-in, braces, floor supports, floor wedges 29

Required Documentation Monthly and Annual Inspection Reports for: –Cranes –Wire rope –Signal person training –Tower crane foundation/support design 30

Summary Ground Conditions Ground Conditions Assembly/Disassembly Assembly/Disassembly Power Line Safety Power Line Safety Inspections Inspections Rigging Rigging Signaling Signaling Operator Qualification/Certification Operator Qualification/Certification Tower Cranes (Supplemental Requirements) Tower Cranes (Supplemental Requirements) 31

Resources Cranes and Derricks in Construction Final Rule Associated Training Service Network National Commission for the Certification of Crane Operators National Association of Heavy Equipment Training Schools North American Crane Bureau Group California Crane School 32