Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.

Slides:



Advertisements
Similar presentations
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Advertisements

Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
EU Developments Transmission Workgroup 3rd November 2011.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Electricity Regional Initiative Central Eastern European Region Draft Report on Transparency for the CEE-Region Jan Müller Bundesnetzagentur ERI Central.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Projects and topology Ádám Balogh Adviser How does your data submission translate into a Project in the topology TYNDP 2017 SJWS Energy Community.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Monitoring Fact Sheets DIKE TSG1 04. July 2013, Copenhagen Proposal for the use of web-based monitoring “fact sheets” for the purpose of MSFD reporting.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
European Developments Transmission Workgroup 3 rd May 2012.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
GC0104 – Demand Connection Code (DCC)
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Public Consultation : main conclusions (1/2)
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Enagás, GRTgaz, Reganosa, REN and TIGF
2009 TSO Transparency Gas Regional Initiative North-West
CMP Transparency Requirements
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
Gibraltar Financial Services Commission
Transparency from a practical point of view ENTSOG Transparency Workshop Brussels, September 11, 2012.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
29th April 2014 Teleconference
37th IG Meeting South Gas Regional Initiative
26th February 2015 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
EURELECTRIC transparency requirements
Quality reporting under Regulation (EC) No 1165/2008
Presentation transcript:

Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012

Content 2 >Reasons for the project >Concept of the new database >Additional tools >Web design >Feedback

Reasons for the project 3 >Congestion Management Procedures (CMP)  Published in the Commission Decision of 24 August amending Annex I to Reg. (EC) 715/2009  e) in a downloadable format that has been agreed between transmission system operators and the national regulatory authorities — on the basis of an opinion on a harmonized format that shall be provided by the Agency — and that allows for quantitative analyses’  ‘(h) all data shall be made available as of 1 October 2013 on one Union-wide central platform, established by ENTSOG on a cost-efficient basis.’

Reasons for the project 4  Additional data to be delivered o ‘occurrence of unsuccessful, legally valid requests for firm capacity products with a duration of one month or longer including the number and volume of the unsuccessful requests’ o ‘in the case of auctions, where and when firm capacity products with a duration of one month or longer have cleared at prices higher than the reserve price’ o ‘where and when no firm capacity product with a duration of one month or longer has been offered in the regular allocation process’ o ‘total capacity made available through the application of the congestion-management procedures laid down in points 2.2.2, 2.2.3, and per applied congestion- management procedure’ o points (h) to (k) shall apply from 1 October 2013’

Reasons for the project 5  Additional data per relevant point o Storage systems o Distribution systems o Production facilities  Information has to be provided on a aggregated level  Complexity of the database is increasing…!

The Concept of the New Datawarehouse I 6 Process >Data Collection Process  TSOs, ENTSOG, GSE and other sources are involved >Data Storage  Supported by a Consistency Check Module and a Alert Module >Data Request  Data will be provided to… o …ENTSOG for internal requirements o …interested TSOs o …any interested party for individual purpose  Data will be also prepared to… o …feed ENTSOG’s Network Modeling tool o …publish required information via the Transparency Platform

The Concept of the New Datawarehouse II 7 General schema

The Concept of the New Datawarehouse III 8 >Updating the data model  Relationships between data elements are described  Rules are added  Reference data to match, if information is consistent  Odd / impossible values are detected  Direct comparability of data elements  Filtering of information  Dynamic information Transparency Platform

The Concept of the New Datawarehouse IV 9 >Current >Current Transparency Platform  No cross border flows on a regional basis are possible  No graphical indication of capacities  No graphical information about maintenance activities  … >New >New Transparency Platform  Cross border flows on aggregated level from one country to another country  Graphical information about capacities  Indication of bottle necks due to maintenance  … Example

The Concept of the New Datawarehouse V 10 Current Current Platform

The Concept of the New Datawarehouse VI 11 New New Platform

The Concept of the New Datawarehouse VII 12 New New Platform

Additional Tools of the Transparency Platform 13 >Automatic Download Tool  Already available, but will be integrated in the new platform as well >More information on regional / national level  Aggregation of data  Graphical overview >More ‘user friendly’ way of downloading data  Multiple selection of data points  Individual data sets for users >Advanced information service  Newsfeeds  Newsletter  Statistics  Reports (manual, automatic) Ideas for new features

New Web design 14 >More attractive and user friendly >More flexible layout (e.g. modules) >More advanced technology  Zooming, scrolling, … >Flexible tools for data tables >Geographical maps providing information  Country based  Region based  TSO based New Layout

Benefits 15 >Clear structure of information provided >Faster data availability >Make data of higher quality and consistency available >Promotion of more transparency >Better image for TSOs and the whole gas market >Being prepared for future requirements For stakeholders

What do you think…? 16 >What do you think about the concept in general? >What do you consider as positive / negative? >What are your concerns? >Do you want to have any additional requirements implemented? >Do you have any further proposals for additional tools to be implemented? >… Your feedback is required…

Thank You for Your Attention ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels EML: WWW: Martin Reisner Junior Adviser, Interoperability/Transparency Do you have further questions?