Working Group on Calibration and Validation CEOS-WGCV Activity Report Albrecht von Bargen DLR Agenda Item 7 CEOS-SIT Workshop # 39 EUMETSAT, Darmstadt.

Slides:



Advertisements
Similar presentations
CII status Osamu OCHIAI NASDA/EORC CEOS/WGISS in Chiang Mai.
Advertisements

Working Group on Calibration and Validation Working Group on Cal/Val Update Albrecht von Bargen (DLR) SIT-30 Agenda Item 10 CEOS Work Plan Deliverables.
WGISS CNES SIT-30 Agenda Item 10 CEOS Action / Work Plan Reference 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31 st March – 1 st April 2015.
Introduction to the Nevada SharePoint Site
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
CEOS VC/WG working day – Report on the integrated ocean surface products discussion Julia Figa-Saldaña, Hans Bonekamp EUMETSAT SIT Workshop Agenda Item.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
CEOS Publications & Outreach 1) Newsletter and Brochure 2) CEOS High Profile Doucment CEOS Plenary Doc. 29 Satoko Miura Pakorn Apapant 1 23 rd CEOS Plenary.
Update on OCR-VC Activities & Actions Paul DiGiacomo (NOAA), Paula Bontempi (NASA), Peter Regner (ESA) SIT Workshop Agenda Item #5 CEOS Virtual Constellations.
Committee on Earth Observation Satellites Albrecht von Bargen, DLR Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
Integrated ocean surface products Julia Figa-Saldaña, Hans Bonekamp EUMETSAT CEOS WG/VC working day EUMETSAT, Darmstadt, Germany 16 th September 2015.
Calendar November 2009 – November 2010 Agenda item: 28 Presented by: Hilcéa Ferreira (INPE) 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
SIT Operations survey CNES SIT Workshop Agenda Item 26 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th – 18 th September 2015 Committee.
Task DA Report Stephen Ungar (WGCV/NASA), POC
Space Agency Response to the GCOS IP
Moderate Resolution Sensor Interoperability (MRI) Initiative
Space Agency Response to the GCOS IP
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
Action Item Review for WGCV-44
Action Item Review for WGCV-43
Title Goes Here Name(s), Organization, CEOS Affiliation
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
A WGCV / WGISS process blue print
Status of Carbon Action Items
WGCV Overview K. Thome WGISS#45 / WGCV#43
GSICS/WGCV Linkages K. Thome NASA WGCV Plenary # 44
WGCV Report Albrecht von Bargen (DLR) Kurt Thome (NASA)
WGCV Chair’s Report K. Thome NASA WGCV Plenary # 44
Day 2 Summary K. Thome NASA WGCV Plenary # 44
Day 3 Summary K. Thome NASA WGCV Plenary # 43
WGCV-32 Action Item Review
Review of Key Actions from 28th Plenary and SIT-30
WGISS/WGCV Session summary and WGCV Action Item Status
Action Item Status / CEOS Work Plan Status
WGCV-43 meeting overview, goals, and agenda approval
Carbon Action Items Status
Update about WGClimate #9
Carbon Actions for WGCV
2b. GSICS Coordination Centre (GCC)
Day 3 Summary K. Thome NASA WGCV Plenary # 44
WGCV-44 meeting overview, goals, and agenda approval
Carbon Actions for WGCV
WGCV-GSICS interactions
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
WGISS Working Group for Information Systems & Services
Communicating Terminology and definitions
Atmospheric Composition SG report
CEOS & Work Plan Status Steven Hosford WGCV-44 28th August 2018
Recent activities of OCR-VC
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
WGCV business - Future meetings and vice chair
Working Group on Cal/Val Update
WGCV Work Plan Actions K. Thome NASA WGCV Plenary # 44
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
Technical aspects of the GIRO work: inputs from GRWG
Update on CEOS Pre-Launch Calibration Workshop
SIT Chair Introduction
SAR Subgroup Report Bruce Chapman (NASA-JPL) CEOS – WGCV Plenary #44
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
CEOS Virtual Constellations Process Paper
WGCV-42 meeting overview, goals, and agenda approval
Stephen Briggs European Space Agency SIT Workshop Agenda Item #13
A timeline for the lunar calibration workshop
WG Calibration and Validation
Session 8 Introduction Work Planning and Closing
WGCV Chair’s Report C. Ong CSIRO WGCV Plenary # 45
WGCV-45 meeting overview, goals, and agenda approval
CEOS & Work Plan Status Steven Hosford, ESA/CNES WGISS-48
Presentation transcript:

Working Group on Calibration and Validation CEOS-WGCV Activity Report Albrecht von Bargen DLR Agenda Item 7 CEOS-SIT Workshop # 39 EUMETSAT, Darmstadt September , 2015

Working Group on Calibration and Validation 2 Presentation Outline ●Overview Working Structure CEOS-WGCV ●CEOS-WGCV plenary # 39, May 2015  Interaction with other Entities  Internal Projects ●Deliverables Status  CEOS WGCV internal action items  CEOS Deliverables Status  Carbon Action Items Status ●Upcoming Events ●Future Outlook CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015

Working Group on Calibration and Validation 3 Agencies Scientists Task Team 1 Task Team 2 Task Team 3 CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015 Set-up of WGCV activity Internal WGCV “deliverable” (WGCV work plan) Extract of sub-set to CEOS work plan WGCV internal initiative for ideas suitable to CEOS-WGCV WGCV external initiative for ideas suitable to CEOS-WGCV CEOS plenary approval & feedback

Working Group on Calibration and Validation 4 CEOS WGCV Plenary 39, Berlin, May 6-8, 2015 hosted by DLR ●Agency reports: Introduction of CAST (China) ●Sub-group reports ●Special session: Ocean Color / Calibration and Validation  OCR-VC (Introduction), IOCCG (Calibration), and JRC (Validation)  Follow-on discussion about calibration in collaboration with WGCV/IVOS ●Interaction with GSICS / GRWG  Combined meetings on sub-group level  Doc. describing the contents / levels of collaboration under consolidation ●Interaction with SST and LSI ●Action Group for consolidation of Carbon Action items (see below) ●Update on future task groups (Atmospheric correction, cloud masking, DEM) ●Validation metrics ●Discontinuation of one sub-group (Terrain-Mapping Sub-group) => part of activities will be transferred to one task group for continuation CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015

Working Group on Calibration and Validation 5 Deliverable Status (I) ●Internal deliverables  Action item document defining deliverables are on web page  With implementation of ToR an internal work plan will be implemented ●Carbon Action Items  Original table can not be assigned one-by-one  Some are sub-group specific and some cross-cutting specific items  Sub-groups were invited to comment in terms what they can do  Follow-on step is the identification of common items to combine  Identification of collaboration link within CEOS and outside on working level.  Identification of step-wise approach with defined milestones  Status: Consolidation of the steps high-lighted in Green in a table which allows WGCV and SIT a tracking / Implicitly, many of them ongoing CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015

Working Group on Calibration and Validation 6 Deliverable Status (II) ●CEOS Deliverables (short version)  Closed deliverables: CV-02, CV-06, CV-07, CV-08, CV-11  Partially completed: ●CV-05: GSICS cooperation: consolidation of report is partially open ●CV-10: TanDEM-X product fitness check: part (a) concluded, part (b) awaits final TanDEM-X product (2016/7), part (c) concluded with Sentinel 2 IOCR ●CV-12: Evaluation of validation sites for Sentinel-2: list of new validation sites are complementing the final list; a finalization of LPV core sites is planned for Q4/2015  Open deliverables ●CV-01: New concept for outreach Web-concept under discussion between WGCV secretariat and ESA ●CV-03: On-ground characterisation Workshop: planning delayed ●CV-04: self-analysis: in schedule CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015

Working Group on Calibration and Validation 7 Upcoming Events  CEOS-WGCV plenaries  WGCV # 40, March 14-18, 2016 in Canberra (AUS) hosted by GEOSCIENCE Australia and CSIRO  WGCV # 41, September 2016, hosted by JAXA  Other workshops or meetings  CEOS SAR Cal/Val workshop, October 2015, hosted by ESA/ESTEC  GSICS / WGCV ACSG workshop, October 2015, hosted by NOAA  WGCV IVOS workshop, November 2015, hosted by ONERA CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015

Working Group on Calibration and Validation 8 Future Outlook ●This overview presentation will be consolidated for the CEOS plenary ●CEOS-WGCV secretariat: now with Forschungzentrum Jülich GmbH ●Consolidation phase for CEOS WGCV in  Set-up of work plan, also depending on additional CEOS activities  Systematic set-up of collaboration fields with other CEOS entities if identified from both sides  Intensification of cooperation with GSICS CEOS SIT Workshop EUMETSAT, Darmstadt, Germany September 17-18, 2015