The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

16 June 2006LHC Machine Advisory Committee1/20 LHC Machine Advisory Committee Commissioning the Beam Dumping System Brennan Goddard AB/BT Input from E.Carlier,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
FCC-hh Injection and Extraction
Injection test? Mike Lamont For initial discussion.
Beam Dumping System – Failure Scenarios Brennan Goddard, CERN AB/BT How the dump system can fail Catalogue of primary failures Failure classes and protection.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
B.Goddard LHC MPS review1 Beam Dumping system, operational experience and validation B.Goddard On behalf of the LHC Beam Dump System teams The major contributions.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
B.Goddard LHC Risk Review6 th March 2009 Beam dump dilution failure B.Goddard CERN TE/ABT On behalf of the LHC Beam Dump project team.
The Stripping Foil Test Stand in the Linac4 Transfer Line
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
3 rd March Extended LTC Injection and Beam Dump Brief overview of system components and dependencies Breakdown of tests foreseen in preparation.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
1 Machine Checkout and Setup Periods Jan Uythoven Thanks to: O.Aberle, R.Bailey, F.Bordry, O.Brunner, L.Bottura, E.Carlier, P.Charrue, E.Ciapala, S.Claudet,
Beam absorbers for Machine Protection at LHC and SPS
Commissioning Strategy - Chamonix LHC Commissioning with Beam Overall Strategy Mike Lamont AB-OP 17 th January 2005 Chamonix XIV B.D.S.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Session 8: What we will do for beam preparation in 2009 G. Arduini, R. Giachino 1Session 8 – Summary - GA24/02/2009.
ELENA installation progress F. Butin / ELENA collaboration.
V. Kain AB/OP1Chamonix XV What is required to safely fill the LHC? V.Kain AB/OP Input from: B.Goddard, M.Jonker, Y.Kadi, R.Losito, V.Mertens, B.Puccio,
Aperture measurements during LHC commissioning 2017
LHC Beam Commissioning Meeting V. Kain & R. Alemany
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Beam dump XPOC analysis
Emergency dumping of proton and ion beams in SIS100 F
Surviving an Asynchronous Beam Dump?
The LHC Beam Dumping System
LHC beam dump 7.56 TeV operation
SPS extraction, transfer lines, injection
The LHC - Status Is COLD Is almost fully commissioned
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Chamonix 2009 – LHC Performance Workshop
Jan Uythoven For discussion
M.Jonker CTC MPO-WG status
LHC Risk Review: Kicker Magnet Reliability
Safe Injection into the LHC V.Kain AB/CO
FCC-hh injection group 7
Safe Injection into the LHC V.Kain AB/CO
Machine Protection Xu Hongliang.
Interlocking of CNGS (and other high intensity beams) at the SPS
LHC Injection and Dump Protection
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Chamonix 2006 – LHC Project Workshop
Machine Protection System Commissioning plans
Will We Ever Get The Green Light For Beam Operation?
Machine Protection Issues for LHCb
The LHC Beam Interlock System
Jan Uythoven For the LBDS Team
Presentation transcript:

The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI 8 transfer lines, namely the injection septa MSI, the injection kickers MKI and several sets of collimators and masks for protection of LHC equipment and experiments. The LHC beam dumping system is located in the LHC tunnel in point 6 and in the specially built TD tunnels and UD caverns, and comprises extraction kickers MKD, extraction septa MSD, dilution kickers MKB and the absorber block TDE, together with collimators and masks for machine protection purposes. The injection and extraction processes and system hardware are briefly reviewed. For both systems, the interfaces to the surrounding LHC equipment are described, together with specific issues for other services, in particular vacuum. The requirements and schedule for installation and hardware commissioning are presented. The LHC injection and beam dumping systems B.Goddard, AB/BT With contributions from : L.Bruno, E.Carlier, L.Ducimetiere, D.Gerard, L.Jensen, J.M.Jimenez, O.R.Jones, V.Mertens, J.Uythoven, J.Wenninger, W.Weterings.

Outline For both systems… –Generalities, layout –The injection/extraction process –Equipment subsystems –General issues –Interfaces –Commissioning requirements –Schedule Summary

LHC Injection systems

The injection process H V 12 mrad 1.24 mrad 0.39 mrad Q5Septum (H)Kicker (V) LHC orbit Require: < 1  s rise time (gap between SPS injections), <3  s fall time (abort gap), 8  s flat-top length (1 SPS batch)

Layout (point 8) 5 x MSI septa 4 x MKI kickers TCDD absorber TDI collimator

Injection septum MSI 5 units of 2 types per injection 4 m unit length Total of 12 mrad (H) ~DC during injection Circ. chamber : Cu +  metal screen, baked to 250ºC. Issues: –Inj. chamber positioning –Aperture for injected beam/ septum protection (TCDI) –Vacuum interconnect details Magnet coil Circulating beam Vacuum chamber Laminated yoke Extracted beam Vacuum chamber Status: Magnets series 100% complete ?? Vacuum chamber – prototype OK

Injection kicker MKI 4 units per injection Total of 0.85 mrad (V) 2.65 m unit length 0.9 / 3.0  s rise / fall time Metallized ceramic vacuum chamber Issues –Flashover failure (1 ‘dangerous’ per ~10Y…) Prototype in recuperated ZL tank Status: Prototyping completed (Mag.+Gen.) Magnets series ~20% complete Generators series ~60% complete Transmission lines ~10% complete

TDI collimator Setting - ±10  y (~ ±5 mm) 4m jaw length – in recuperated ZL tank < 300  m non-flatness Materials – hBN, Al, Cu Issues: –Bakeout + beam screen –Loading at injection (OP scenarios) –hBN properties after irradiation Status: Conceptual design completed Prototyping of subassemblies ongoing

TCDD absorber ~35 x 60 mm (V, H) Setting ±10  x,y 1m Cu jaw length Protects D1 from damage / quench Still in conceptual design phase Issues –Fixed / movable jaws? (larger in IP8) –Finalise requirements Status: Conceptual design ongoing

Beam instrumentation (IP 8) BPM BTV (OTR) BCT BLM Status: Standard LHC items – progress OK

System specific issues remaining –Injection collimation system to be finalized (machine protection, collimators, performance); –Injection system (+ LTI) failure modes to be quantified (define LHC collimator loading at injection); –Overall injection oscillations (1.5 s budget) to be quantified (including SPS and transfer lines); –Detailed integration with ICL/MIWG –Details of installation sequencing / schedule with EST/IC –HW commissioning aspects with EST/IC & HCWG –Beam commissioning (sector test?) aspects with AB/OP & LHC-OP

Interfaces Circulating beam vacuum (BI, MSI, MKI, TDI, TCDD) Injection line vacuum (BI, MSI) Machine Protection (BIC); SPS (injection sequences, interlocks); PO (magnet powering); CV (MKI, MSI cooling) RF (Revolution Frequency); Controls system (settings, alarms, timing, postmortem, logging, …); Safety (fire detection, access); Collimators (interdependence of settings with TCDI, TDI);

HW commissioning requirements –General services (cooling water, ventilation, power, emergency stops, phones,…) –All equipment installed and individually tested –Sufficient test time in schedule; –Controlled access conditions (tunnel + galleries); –Other systems operational: Vacuum; Machine Interlock (beam permit); Controls (ethernet, pre-pulse, timing, control room s/w, trims, alarms, logging, post-mortem, sequencer, …); Connection to dump kickers (via BIC + direct);

Schedule required dates as a function of main LHC milestones (rev 1.7) Injection point 8 (UA87): Hardware installation completed Q4 – 2005 Hardware commissioning Q1 – 2006 with sector 8.1 Sector test and injection test (?) Q2 – 2006 Injection point 2 (UA23): Hardware installation completed Q3 – 2006 Hardware commissioning in Q1 – 2007 with sector 1.2 and TI 2

LHC Beam Dumping system

40 m Schematic layout TCDQ Total length : 975m from MKD to TDE 15 x MSD septa15 x MKD kickers TCDS protection 10 x MKB kickers TCDQ protection TDE dump block

The extraction process V 2.4 mrad 0.06 mrad Q4Kicker (H)Septum (V) LHC orbit H 0.33 mrad LHC orbit Require: <3  s extraction kicker rise time (abort gap), >89  s extraction kicker flat-top length (full LHC turn)

Extraction kicker MKD Strip-wound Core Conductor Ceramic vacuum chamber 15 units per beam Total of 0.27 mrad (H) Generators : redundancy, retriggering, self-diagnostics Impedance : metallized ceramic vacuum chamber Issues: –Failure rates (missing, pre-triggering) Prototype magnet Status: Small prototype tested OK (M+G) Magnet series at ~20% Generator series at ~20% Transmission lines at ~10%

Extraction septum MSD Magnet coil Laminated yoke Extracted beam Vacuum chamber Circulating beam Vacuum chamber 15 units (3 types) per beam Total of 2.4 mrad (V) Circ. Chamber to 250ºC Issues: –Aperture for circ / extr beam (investigating larger circ. chamber in MSDC, ±4 mm orbit interlock) –Reworking of connection boxes (QRL interference) –Details of vac. interconnects Status: Magnet prototypes tested OK Magnet series ~60% complete Vacuum chamber prototyping

Dilution kickers MKB Vacuum Tank Strip Wound Core Conductor 10 units per beam (4 x H, 6 x V) ± 0.28 mrad (H), ± 0.28 mrad (V) Reuse MKD technology Issues: –Staged installation (4/10 units) limits LHC intensity to 50% (for ~2 years after green light) Status: M+G detailed design in progress Transmission line series at ~10%

Dump core TDE 7m long C / C-C TDE in steel shrink-cylinder, followed by 1m Al, 2m Fe ~1000 T of concrete shielding Issues: - Containment (N 2 overpressure, possible additional TD diluter?) - No water-cooling (staged) limits power deposition Status: Concrete shielding finished TDE detailed design completed First TDE unit being assembled Ancillary equipment design ongoing

Protection elements TCDS/TCDQ TCDS – 6m fixed diluter, C, C-C, AlN, Ti TCDQ – 9.5m mobile diluter, C, Al Issues: - Vacuum + impedance issues with C, AlN - TCDQ interdependence with collimators, MP Status: TCDS detailed design started TCDQ in conceptual design phase

Beam instrumentation Plus – 2 BCTs per line at MKB – 4 screens (OTR) per line at MSD, MKB, (TD), TDE Status: FS being finalized (mostly standard LHC items except large BTVs and electronics for dedicated position interlock BPMs). BLMs BPM Position Interlock BPM

Extracted beam (TD) vacuum pipe Status: ES being finalized Integration studies started System be built under Indian collaboration agreement ~640m long 110/2 mm -> 610/6.3 mm

–Overall reliability analysis –Energy tracking of MKD, MSD, MKB –MSD aperture –Machine protection (TCDQ settings, additional interlock BPM functionality) –Loading of collimators (asynchronous dump) –Detailed integration with ICL/MIWG –Details of installation sequencing / schedule with EST/IC –HW commissioning aspects with EST/IC & HCWG –Beam commissioning aspects with AB/OP & LHC-OP System specific issues remaining

Interfaces Circulating beam vacuum (BI, MKD, MSD, TCDS, TCDQ) Extraction line vacuum (BI, MSD, MKB, TD62/8, TDE) Machine Protection (BIC); PO (magnet powering, DCCTs for Beam Energy Meter); CV (TCDS, TCDQ, TDE, MSD cooling, TD/UD ventilation) RF (Revolution Frequency and abort gap synchronisation); Controls system (settings, alarms, timing, postmortem, logging, …); Safety (fire detection, access, Emergency stops); Collimators (interdependence of settings with TCDQ);

HW commissioning requirements –General services (cooling water, ventilation, power, emergency stops, phones, …) –All equipment installed and individually tested –Sufficient test time in schedule; –Controlled access conditions (tunnel + galleries); –Other systems operational: Vacuum; Machine Interlock (beam permit); Beam Energy Meter; Controls (ethernet, pre-pulse, timing, control room s/w, trims, alarms, logging, post-mortem, sequencer, …); Connection to injection kickers (via BIC + direct);

Beam Dumping System UA63, TD62 tunnel, UD62: Hardware installation completed Q2 – 2006 Hardware commissioning in Q3 – 2006, with sector 5.6 Beam Dumping System UA67, TD68 tunnel, UD68: Hardware installation completed Q3 – 2006 Hardware commissioning in Q4 – 2006, with sector 6.7 The Beam Dumping System also needs to have a “reliability run” (system validation, check failure/availability predictions, debugging of system, INB, …). For this run the system will have to be connected in their proper operational way: UA63 to TD68, UA67 to TD62. Period foreseen: Q1 – 2007 (together with HC sector 1.2.) Estimated time required for a useful reliability run: 3 months. Schedule required dates as a function of main LHC milestones (rev 1.7)

Conclusions Injection system Hardware production on schedule for main LHC milestones Outstanding issues include - Some collimation and machine protection aspects - TCDD conceptual design to be finalised - Detailed interaction with LHC collimators - Installation, h/w and beam commissioning aspects Beam dumping system Hardware production on schedule for main LHC milestones Outstanding issues include - Reliability analysis and details of dedicated reliability run - TCDQ conceptual design to be finalised - Detailed interaction with LHC collimators - Installation, h/w and beam commissioning aspects