2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.

Slides:



Advertisements
Similar presentations
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Advertisements

MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
Construction and Installation of the CLIC Experimental Area
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
T. Kirk’s 4 Dec 04 letter to DOE Construction Cost - $11M+ –Beam line g-2 ring upgrades etc - $11M –Cost sharing with RSVP of AGS/Booster rehab – discussed.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee. N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
UCN Facility Working Group October 3, 2012 OverviewL.Lee MCNPX and ShieldingP.Carlson Beam MonitorsC.A.Davis / A.Konaka.
UCN Facility at TRIUMF L.Lee October 3, 2012 PLACE UCN LOGO & ACRONYM HERE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Installation of the T600 at Fermilab CSN2, September 22,
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation progress F. Butin / ELENA collaboration.
UCN and SCRF/ISAC interface issues ● proposal for UCN (CFI, 2008) – 10 uA at 25% duty cycle (1 min on, 3 min off) – use BL4A (TISOL) ● duty cycle is incompatible.
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
ELENA installation and commissioning status
News and brief overview of Beamline plans for the next few months
Overarching Commissioning Plan
Injector / Linac Installation Current Status
Extraction Michael Bevins May 17, 2007
LCLS e- Beams System Overview
LCLS e- Beams Systems Manager
Polarized 3He target installation
Presentation transcript:

2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013

Upstream Section of BL1U 2 nEDM Experiment Region

UCN Installation Schedule N 2014 Shutdown 4 months 3

ACTIVITY J A J O J A Schedule( ) Cleanup M11,1A/1B roof-beam Dismantle PIENU & M13-DS MESON HALL (& Vault): Core M13 I-block UCN APPARATUS: Spallation Target & R/H UCN Source BEAMLINE 1U: Kicker Septum Dipole Beamline (incl Quads, PS,…) Design & ReviewOrder/Fabricate/Deliver Test Mod/Fab/Assy Order/Fabricate Design & Review Order/FabricateInstallTest Specify/Conceptual design Design/FabricateInstallMove TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier System He Liquefier System Procure Install/Test & RCNP Procure/Install Install Kicker Beamtube Install Design/OrderFabr Install Test MILESTONES Shutdown Activities Activities Elsewhere (KEK, RCNP, CERN, Acsion) Non-Shutdown Activities Mod. 1VQ4/Q5; BL1V & Shld Install Dismantle M13-US, Mod.Shld UCN Schedule (Draft) Design/Order/FabricateTest Install Design/Fab r Shielding Procure shielding blocksDesign & Review Install 4

2014 UCN Installation Schedule 5 UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section

2014 S/D Schedule & Resources UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section Late Dec/2013Remove large shielding blocks outside (3 days) Start Jan.2/2014 Week 1RPG survey & prepare for S/D work Week 2Remove Warm blocks (layers A-D); Disconn.services; Remove 1A vault comp.’s Week 3Cleanup/Layout BL1U; Specify location for coring of Immovable-block (and tx.) Week 41BVB2 mods (and 1B mods) Week 4 - 6Install stands for kicker,septum,1UB2; Install & Align kicker-beamtube Week 7Install & Align septum magnet Week 8Install & Align 1UB2 magnet and 1UM6 Week 9Reinstall 1A vault comp.’s; Install Notch-monitor; Install 1AUM5,1UBB2 Week 6 - 8Install rough-in services (Electrical, Water, Air) Week Finish Electrical (AC & DC), Water, Air services Week 10Finish all vacuum connections Week 11Leak check & ready to pull vacuum Week 12Pull vacuum & check-out vacuum controls Week 13General check-out and ready to cover Week Restore vault & 1A shielding and prepare for beam Resources:3 Beamlines techs (2 BL + Alignment), 13 weeks [39 person-weeks] 1 Crane Operator + 2 Riggers, 7 weeks [21 person-weeks] Vacuum Group [6 person-weeks] Services: Outside Contractors, 5 weeks [6 person-weeks] Mostly Contractors Close Up Main Work Open Up 2014 UCN Installation Schedule & Resources 6

Resource Requirements 7 Preparations for 2014 Shutdown: (Design, Procurement, Assembly of Subsystems) Items/SubsystemsEng. DWGsProcurementAssy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A ShieldingSaf. / UCN DO UCN n/a Septum ModsUCN UCN MS / UCN BL / UCN Septum Vacuum BoxUCN UCN MS / UCN BL / UCN Septum StandUCN UCN MS / UCN BL / UCN 1UAM5/1UBB2Diag. DO MS /Diag. / ET ET / Diag. 1BVB2 Stand Mod.Eng.Div. DO MS BL Dipole Vacuum BoxUCN UCN MS BL 1AM4(ToF)/1AM4.5Diag. UCN Diag. / UCN Diag. / UCN Kicker BeamtubeUCN UCN UCN BL Kicker StandUCN UCN MS / UCN BL

Preparations for 2014 Shutdown: [ Time Estimate in Person-Weeks ] Items/SubsystemsEng. DWGsProcurementAssy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A ShieldingSaf.[3]/UCN[4] DO [7] UCN [3] n/a Septum ModsUCN [8] UCN [4]MS [2] / UCN [1]BL [10] / UCN [2] Septum Vacuum BoxUCN [3.5] UCN [6]MS [6] / UCN [1]BL [6] / UCN [3] Septum StandUCN [3.5] UCN [6]MS [5] / UCN [1]BL [4] / UCN [2] 1UAM5/1UBB2Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7] 1BVB2 Stand Mod.Eng.Div. DOMS BL [0.5] Dipole Vacuum BoxUCN [1] UCN [6] MS [8] BL [1] 1AM4(ToF)/1AM4.5Diag. [3] Stu. [3]Diag. [2] / Stu. [5]Diag. [2] / Stu. [6] Kicker BeamtubeUCN [3.5] UCN [5.5] UCN [3.5]BL [2.5] Kicker StandUCN [3.5] UCN [6.5]MS [5] / UCN [2.5]BL [4] Resource Requirements 8

Summary: Resource Requirements 9 [ Time Estimate in Person-Weeks ] Meson-Hall Cleanup 2013 ( non-S/D?) M11 Platform (2013 )2013 non-S/D Cleanup PG [12]PG [70] BL [4]BL [34] EL [16] Preparations for 2014 S/D (2013) Safety [3] DO [14] MS [32] BL [28] Diag.[24] ET[7] UCN.Eng [46] UCN.Des [34] UCN.Stu[14] 2014 S/D (UCN Installation) PG [21] BL [39] Vac [6] Con.[6]

FINIS 10

List of Major Milestones 2013 – MayUCN Beamline Review 2014 – MayBL1U US-section (Kicker beamtube, Septum, Dipole) Installed – AugUCN/nEDM RCNP phase completed. Begin Uninstall for transport to TRIUMF – AprUCN Source received at TRIUMF. (Unpack and Begin Cold Tests of UCN Source) 2015 – JulyBL1U DS-section Installed – JulyCommission UCN Facility using low intensity beam. 11

Summary:(Reference Scenario) 1. Vault mods: Cleanup issues; BL1B & Vault mods Jan.2-Mar.29Rewire Vault Quads for Steering Capability Work Estimate2 weeks; 1 BL, 1 Contractor (Electrician) 2. Cleanup: M11 experiment area and above 1A/1B shielding blocks Jan.2-Feb.28M11 Platform Work Estimate4 weeks; 1 crane operator, 2 riggers, 1 BL Mar.1-Aug.30Cleanup M11 expt area and above 1A/1B shielding blocks Work Estimate12 weeks; 1 crane operator, 2 riggers, 1 BL 3. Dismantle: M13 expt area (PIENU,Q6,Q7) and Infrastructure/Services Finish Mar.29PIENU BG/Calib and remove detectors (PIENU personnel) Apr.1-Jun.30Remove PIENU and clear M13 floor area Work Estimate6 weeks; 1 crane operator, 2 riggers, 1 BL Jul.1-Sep.30Remove PIENU-M13 infrastructure & services Work Estimate8 weeks; 1 crane operator, 1 rigger, 2 BL, 2 EL Person-Week Sums Shutdown & Meson-Hall Cleanup 2013 [ Time Estimate in Person-Weeks] 2013 ShutdownM11 Platform (2013 )2013 non-Shutdown BL [2]PG [12]PG [70] Contr [2]BL [4]BL [34] EL [16]

Any possible storage solutions left on-site? MOB ISAC II ISAC I RH M.S. Construction ARIEL A D.O./Stores Plant Grp. Hh Ff Constr. He Fac Cycl MH PH Gg

Comments: 4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section

Comments: 4. UCN Installation 1 (Jan-May/2014): BL1U, Vault and Upstream Section Late Dec/2013Remove large shielding blocks outside (3 days) Start Jan.2/2014 Week 1RPG survey & prepare for S/D work Week 2Remove Warm blocks (layers A-D); Disconn.services; Remove 1A vault comp.’s Week 3Cleanup/Layout BL1U; Specify location for coring of Immovable-block (and tx.) Week BVB2 mods (and 1B mods) Week 5 - 7Install stands for kicker,septum,1UB2; Install & Align kicker-beamtube Week 8Install & Align septum magnet Week 9Install & Align 1UB2 magnet and 1UM6 Week 10Reinstall 1A vault comp.’s; Install Notch-monitor; Install 1AUM5/1UBB2 Week 7 - 9Install rough-in services (Electrical, Water, Air) Week Finish Electrical (AC & DC), Water, Air services Week 11Finish all vacuum connections Week 12Leak check & ready to pull vacuum Week 13Pull vacuum & check-out vacuum controls Week 14General check-out and ready to cover Week Restore vault & 1A shielding and prepare for beam Resources:3 Beamlines techs (2 BL + Alignment), 13 weeks [39 person-weeks] 1 Crane Operator + 2 Riggers, 7 weeks [21 person-weeks] Vacuum Group [6 person-weeks] Services: Outside Contractors, 5 weeks [6 person-weeks] Mostly Contractors (?) Close Up Main Work Open Up

Preparations for 2014 Shutdown: (Design, Procurement, Assembly of Subsystems) Items/SubsystemsEng. DWGsProcurementAssy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A ShieldingSaf. / UCN DO UCN n/a Septum ModsUCN UCN MS / UCN BL / UCN Septum Vacuum BoxUCN UCN MS / UCN BL / UCN Septum StandUCN UCN MS / UCN BL / UCN 1UAM5/1UBB2Diag. DO MS /Diag. / ET ET / Diag. 1BVB2 Stand Mod.Eng.Div. DO MS BL Dipole Vacuum BoxUCN UCN MS BL 1AM4(ToF)/1AM4.5Diag. UCN Diag. / UCN Diag. / UCN Kicker BeamtubeUCN UCN UCN BL Kicker StandUCN UCN MS / UCN BL SEM for BL1BDiag. D.O. Diag. Diag. (M.Trinczek)

Preparations for 2014 Shutdown: [ Time Estimate in Person-Weeks ] Items/SubsystemsEng. DWGsProcurementAssy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A ShieldingSaf.[3]/UCN[4] DO [7] UCN [3] n/a Septum ModsUCN [8] UCN [4]MS [2] / UCN [1]BL [10] / UCN [2] Septum Vacuum BoxUCN [3.5] UCN [6]MS [6] / UCN [1]BL [6] / UCN [3] Septum StandUCN [3.5] UCN [6]MS [5] / UCN [1]BL [4] / UCN [2] 1UAM5/1UBB2Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7] 1BVB2 Stand Mod.Eng.Div. [1.5] DO [3]MS [2]BL [2] Dipole Vacuum BoxUCN [1] UCN [6] MS [8] BL [1] 1AM4(ToF)/1AM4.5Diag. [3] UCN [6]Diag. [2] / UCN [5]Diag. [2] / UCN [6] Kicker BeamtubeUCN [3.5] UCN [5.5] UCN [3.5]BL [2.5] Kicker StandUCN [3.5] UCN [6.5]MS [5] / UCN [2.5]BL [4] SEM for BL1BDiag. [2] D.O. [2] Diag. [3] Diag. [3] (M.Trinczek) UCN Designer (need to hire)

Person-Week Sums: Summary [ Time Estimate in Person-Weeks ] Shutdown & Meson-Hall Cleanup 2013 & S/DM11 Platform (2013 )2013 non-S/D BL [4]PG [12]PG [70] BL [4]BL [34] EL [16] 2014 S/D PG [21] BL [39] Vac [6] Con.[6] Preparations for 2014 S/D (2012,2013) Safety [3] Eng.Div[1.5] DO [19] MS [34] BL [29.5] Diag.[32] ET[7] UCN.Eng [46] UCN.Des [34] UCN.Stu[17]

Preparations for 2014 Shutdown: [ Time Estimate in Person-Weeks ] (Deferral Options - Prioritized) Items/SubsystemsEng. DWGsProcurementAssy./Testing (needed Jan-2014) (incl Modeling) Vault-BL1A ShieldingSaf.[3]/UCN[4] DO [7] UCN [3] n/a Septum ModsUCN [8] UCN [4]MS [2] / UCN [1]BL [10] / UCN [2] Septum Vacuum BoxUCN [3.5] UCN [6]MS [6] / UCN [1]BL [6] / UCN [3] Septum StandUCN [3.5] UCN [6]MS [5] / UCN [1]BL [4] / UCN [2] 1UAM5/1UBB2Diag. [8] DO [7] MS[6]/Diag.[2]/ET[4] ET [3] / Diag. [7] 1BVB2 Stand Mod.Eng.Div. [1.5] DO [3]MS [2]BL [2] Dipole Vacuum BoxUCN [1] UCN [6] MS [8] BL [1] 1AM4(ToF)/1AM4.5Diag. [3] UCN [6]Diag. [2] / UCN [5]Diag. [2] / UCN [6] Kicker BeamtubeUCN [3.5] UCN [5.5] UCN [3.5]BL [2.5] Kicker StandUCN [3.5] UCN [6.5]MS [5] / UCN [2.5]BL [4] SEM for BL1BDiag. [2] D.O. [2] Diag. [3] Diag. [3] (M.Trinczek)

JOAJ 2012 JOAJ 2013 JOAJ 2014 AJO 2015 Oct. 17, 2012 Major Tasks JAJO 2016 ARIEL & Shutdown Plan ( ) - DRAFT Install Kicker, UCN Beam line, Services & Controls Complete Shielding & Commissioning Tests Mod Vault Quads (rem. Steerers), 1BVB2, and BL1A/1B Install Kicker Ceramic beam Tube & Services Install Base Layer of UCN Shielding to Run BL/1A Core through M13 Block 2012 / Complete M20 Front end & M9A Front end work Install Septum & Dipole (with services, where possible) Remove & Store M13 Front end, Hot Blocks & Crumbling Blocks Install UCN Spallation Target & R/Handling System, & UCN Source Install UCN Shielding Legend: Shutdown Jobs Non Shutdown Jobs Reconfigure Vault-to-1A Shld, and beamline Shld to run 1A Cleanup (incl M11 Expt area, above 1A/1B shielding blocks) ARIEL & E-Linac Milestones Tunnel & Bldg Avail LC (50Kw) e-Beam 100Kw e-Beam E-Hall Available Construction Install & Connect ELBT & EINJ-2 in E-Hall Cryogenic Plant (delivery & operational) Test & Commission High Power RF System (Klystron & HVPS) Install EHBT from ACM to Target Hall Install & Connect EACA, Test & Comm Beam in E-Hall (50kW & 100kW) ARIEL & E-Linac Shutdowns Complete IRIS Complete EMMA Hel liquefier system (and UCN upgrade) Procure & InstDsgn 2016 Procure & Inst Upgrades Dismantle M13 Expt area (PIENU,Q6,Q7) & Infrastructure/Services Assess: Cleanup of M11, M13, above 1A/1B; BL1B & Vault mods