Department of Public Works Arroyo Seco Casting Pond Renovations Contract Award to Mallcraft, Inc.

Slides:



Advertisements
Similar presentations
LIBRARY BUILDING Where to Begin?. WHY? Identify the reason for the new/renovated building Quantify the need based on standards, shortfalls and benchmarks.
Advertisements

Critical Approval Commissioner/ State Board of Education Commissioner/ State Board of Education Concept Conference s Concept Review Review and Approval.
Evaluation of Contract Administration for Public Projects in Saudi Arabia By Khaled A. Al-Gunaiyan Nov 1992.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
Issues and Experiences with Infrastructure Grants from Multiple Perspectives – Panel Discussion OPUS D AYTON K NIGHT John W.C. Boyle, M.I.C.E., P.Eng.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
0 FY14 State Budget Discussion EEC Board Meeting May 13, 2013.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
810 Mission Avenue 3 rd Floor Refurbishment October 17, 2013 Related to Agenda Item 14.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
The Dirt Lot Initiative This proposed project was part of last year’s Capital Project Improvement Plan There has been an obvious risk associated with its.
Fox Point Homeowners Association October 30, 2013.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Manistee County Library Master Space Plan December 2013 Quinn Evans Architects & GMB Architecture and Engineering.
September 9, 2009 Report on SWGWTP Deep Well Drilling Phase 2.
State of Alabama Department of Finance Division of Risk Management Kim Huggins Claims Manager.
JOB CORPS HELPFUL HINTS FOR ACCELERATED CLOSEOUT Department of Labor.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption April 27, 2015.
PA-1 Surface Water Control Structure Replacement Final Payment.
GRANT AMENDMENTS Processes and Procedures Robert Compton- Field Services Representative  9/10/2015.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
Residential Construction Mitigation Program State Office of Emergency Management (OEM)
Community Development Department Holland Park Renovations Playground & Splash Park Design.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Department of Public Works CONTRACT AWARD TO RECON ENVIRONMENTAL, INC., FOR LOWER ARROYO HABITAT RESTORATION City Council December 14, 2015.
IMPACT FEE GRANT PROGRAM FOR NFPs Discussion Item March 6, 2012 Board of County Commissioners.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Presented By Public Resources Management Group, Inc. RECREATION IMPACT FEE STUDY Prepared: December 9 th, 2013.
Las Cruces International Airport RESOLUTION A: A RESOLUTION APPROVING THE AWARD OF A CONTRACT FOR DESIGN THROUGH BIDDING PHASE SERVICES FOR AN.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
PORT OF TACOMA. Authorization for 3 actions: 1. Purchase acres at 1300 Taylor Way in the amount of $2,930,000; and, 2. Execute Agreement with City.
Budget Update Mayor’s Budget Office External Stakeholder Presentation April 20, 2007.
Resolution No WATERFALLS REGIONAL POND CHANGE ORDER NO. ONE WATERFALLS REGIONAL POND CHANGE ORDER NO. ONE Contract Cost: $2,969, Contract.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
Pasadena Water and Power Authorization to Enter into MOUs with LACFCD and ASF to Implement Proposition 84 Grant Presented by Natalie Ouwersloot, Engineer.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption & Amendments to FY 16 CIP May 16, 2016.
Cyber Security Studies Building 4/1/20161 Groundbreaking - Oct 21, 2016.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
Holly Street Bridge Retrofit and Rehabilitation Project
2016 Presented by: Raffi Soghomonian
Chapter 14 Budgeting.
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
City of San Jacinto 7th Street Pavement Repairs
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Cottonwood Recycled Water Pipeline (West)
College II Tank Interior Recoating Award of Construction Contracts
2013 Specification Implementation
Mountain Avenue West Recharge Basin Project
Reach 4 Air Valve Replacements Award of Construction Contracts
Joint Finance Committee/ Council May 21, 2018
Schedule of Taxes, Fees, and Charges Annual Update Fiscal Year 2017
2013 Specification Implementation
Capital Construction Project Update March 12, 2019
Delta Water Supply Project
Schedule of Taxes, Fees, and Charges Annual Update Fiscal Year 2015
Council Agenda Item #5 February 4, 2019
Huntsville High School Softball Program Upgrades
IT Lobby Renovation at Merts
Find the Perimeter.
Request for Qualifications (RFQ) Architectural & Engineering Services for Seattle City Hall Plaza Restoration CDCM # Presubmittal Conference June.
Presentation transcript:

Department of Public Works Arroyo Seco Casting Pond Renovations Contract Award to Mallcraft, Inc.

Department of Public Works Existing Pond Built in 1955 Asphalt pond about 24” deep Asphalt perimeter for fly casting practice

Department of Public Works Need for the Project Existing Pond has substantial leaks Pond floor and perimeter are damaged

Department of Public Works Proposed Design Will occupy same footprint About 18-24” deep after renovation Perimeter Improvements

Department of Public Works Construction Specifics Original Design Concept  Add new surface over existing pond  New drainage system Revised Concept  Strengthened lining – thicker, more reinforced  Strengthened access ramp  Enlarged drainage system

Department of Public Works Bid Results Engineer’s estimate  $309,510 Bid results  12 bids received  $283,830 – 8% under Engineer’s Estimate

Department of Public Works Finance Original sources ($265,000 total)  Prop A-$182,107  Prop 40-$ 57,893  Private -$ 25,000 Project Cost ($438,000 total)  Contract Award Not to Exceed Amount-$312,000  Design, Engineering, Administration -$126,000  Shortfall -$173,000

Department of Public Works Recommended Funding Sources Shortfall -$173,000 $100,000 from Impact Fee interest $73,000 State Prop ‘A’ funds from Lower Arroyo – Habitat Restoration fund.