28/07/2015IRENEUSZ RZEPA PH/DT INTERNSHIP FINAL PRESENTATION IRENEUSZ RZEPA JUNE-JULY 2015
MAIN TASKS: LEAK TEST BENCH: -PROGRAMMING IN LABVIEW -PREPARING ELECTRICAL DOCUMENTATION -ELECTRICAL BOX ASSEMBLY -COMPLETING LEAK TEST BENCH ASSEMBLY -CREATING AND COLLECTING DOCUMENTATION OTHER WORK: -TESTS -MANUAL WORK 28/07/2015IRENEUSZ RZEPA PH/DT
28/07/2015IRENEUSZ RZEPA PH/DT LABVIEW PROGRAME
28/07/2015IRENEUSZ RZEPA PH/DT IndicatorsAlarms Start button Sampling rate Stop button Graph Front panel
28/07/2015 IRENEUSZ RZEPA PH/DT Indicators Sampling rate AlarmsSave Measuring : -3 temperatures -2 differential pressures Back panel
28/07/2015IRENEUSZ RZEPA PH/DT ELECTRICAL DOCUMENTATION
28/07/2015IRENEUSZ RZEPA PH/DT
28/07/2015IRENEUSZ RZEPA PH/DT Electrical documentation is fully prepared. Part list
28/07/2015IRENEUSZ RZEPA PH/DT ELECTRICAL BOX
28/07/2015IRENEUSZ RZEPA PH/DT 1. Choose components. 2. Prepare orders 3. Mechanical assembly. 4. Cabling and wiring. 5. Commissioning.
28/07/2015IRENEUSZ RZEPA PH/DT The device has been permanently installed on the leak test bench (on the back plane).
28/07/2015IRENEUSZ RZEPA PH/DT Fully assembled electrical box. Left side Front side
28/07/2015IRENEUSZ RZEPA PH/DT Back side
28/07/2015IRENEUSZ RZEPA PH/DT LEAK TEST BENCH ASSEMBLY Before modifications
28/07/2015IRENEUSZ RZEPA PH/DT Assembling a safety valve Left side Front side
28/07/2015IRENEUSZ RZEPA PH/DT Assembling second differential pressure sensor.
28/07/2015IRENEUSZ RZEPA PH/DT Soldered a temperature transmitters.
28/07/2015IRENEUSZ RZEPA PH/DT Wiring the differential pressure sensor
28/07/2015IRENEUSZ RZEPA PH/DT MODEL VS REALITY
28/07/2015IRENEUSZ RZEPA PH/DT OTHER TASKS Help with start-up the LAUDA chiller unit. e.g. I assembled the housing. Help with TRACI V3 project.
28/07/2015IRENEUSZ RZEPA PH/DT THANK YOU FOR YOUR ATTENTION