Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.

Slides:



Advertisements
Similar presentations
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Advertisements

Susana Izquierdo Bermudez, on behalf of the winding team
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
Focusing Lens for the SSR1 Section of PXIE Preliminary analysis of main options 3/13/2012I. Terechkine1.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
1.Placement of support base for 70 degree-dipole magnet(D) ・ Support base for 70 degree-dipole magnet(D) should be placed horizontally with a spirit level,
Problem Statement/Constraints Design Options Design selection Design layout Analysis Fabrication Testing Results Recommendation Concluding Remarks.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MS-3952 Qualification Parts Susana Izquierdo Bermudez 12/12/2013.
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
Conductor working group video-meeting P. Ferracin, S. Izquierdo Bermudez December 19, 2013.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
Pocket and Metric Hole in End Parts Miao Yu 02/25/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Cable Winding Test and End Parts Design
ERMC/RMM activities May 2017
Discussion session on day 1
MBHSP02 test STATUS and first results
Protection Database Tool
MQXF updates P. Ferracin October 9th, 2014.
Generalized tiebreaker wiring diagram
Creation of simplified parts:
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Creation of simplified parts:
The limits of traditional magnets.
Presentation transcript:

Susana Izquierdo Bermudez

SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the re-work at the scan-company. It makes it easier for us to check the re-work and we can minimize the deviations to 0,2mm or less. It is the magnetic base material. In future we reduce the quantity of parts and we have a higher allowance. So energy input and consequently the delay should be reduced. The wire of wire EDM should be moves through the allowance without contacting the base plate. For the currently parts IL/ OL we use these changes. The Laser beam has a focus diameter of ~0,11mm. So it is better to have a radius over 0,5mm. 1. Deviation up to 0.4 mm in the nose 2. Magnetic material in the end saddle 3. Sharp edges

Susana Izquierdo Bermudez PC2 parts with cuts 3 -They don’t see deformation during build up, nor after heat treatment. -They don’t find impaired delay in the base plate (linked with the issue of magnetic material. End saddles without cuts are not ordered yet

Susana Izquierdo Bermudez Pocket in the IL splice box 4 CERN-V1 had this pocket Last FNAL version does not have it. Why? Do we want to remove it?

Susana Izquierdo Bermudez Pole holes 5 Pin hole (type B): Ø6 in V1, Ø6.35 in FNAL coil In the pole, the pin hole is 1/4"- 1.25” (31.75mm) LG. If change it to metric, only choice is M5, because in US, the max length of SS316 M6 dowel pin is only 20 mm. Personally I prefer to keep this as it is.”

Susana Izquierdo Bermudez Holes end saddles 6 Hole descriptionSizeAimPrecision RELE ILOLILOL 1Instrumentation wire threaded hole: #10-24→M5*x0.8provide strain relief for the instrumentation wires +-0.2mm? x1 2Electrical QA threaded hole: #10-24→M5*-0.8Electrical checks+-0.2mm? 3Winding alignment hole #10-24→M5*-0.8Winding alignment/measure coil packing +-0.2mm? 4Pin hole on the saddle and saddle extension: ¼” → M6Alignment end saddle-splice box Radius: 6.35mm mm/-0 mm Positioning: ?? x2 5Threaded hole on the back surface of LE saddle: ¼”-20 → M6x1Mechanical assembly end- saddle-spice box +-0.2mm?x2 1,2,3? Total: 1 hole on return end saddles 5 holes on lead end saddles * Not sure if we have room considering the cuts…see next slide

Susana Izquierdo Bermudez Cuts 7 We have 7 mm available  M3? M4?

Susana Izquierdo Bermudez Coil length 8 Length (mm) L = L2999 L = L1 L2 L3 L_total = L1+L2+L3=1510-2*0.250= Distance between end saddle and splice box = 2*0.250=0.500mm

Susana Izquierdo Bermudez Quality Check stp files? 10

Susana Izquierdo Bermudez FNAL (green) vs CERN (red) spacers 11

Susana Izquierdo Bermudez 12 FNAL (green) vs CERN (red) spacers