1 LBT Q3 2008 Eng/SW Review ECS: Enclosure Control System.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Hydrogen Workshop for Fleet Operators. Module 3, “Vehicle Operations and Maintenance Facilities”
 Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD  Elastomeric roof material did not completely adhere.
31 October 2006 M. De La Peña Software Cross-Training Session LBT TCS - ECS 1 Enclosure Control System (ECS) Michele De La Peña.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Ocean Dunes Special Assessment 2013 o Problems with Roofs Building Envelope and Generators o Roofs – No Name Storm o Generators – Rust, mechanical problems.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Lifetime Transferable Warranty… for the Life of your Shutters! Lifetime Protection against defects, damage and durability (1)
Copyright © 2009 by Stan Pope Page 1 Pinewood Derby Performance Basics An introduction to making a high performance Pinewood Derby car Copyright 2003,
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
1 LBT Q Eng/SW Review PWR: Site electrical power.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
Torque  If an unbalanced force acts on an object at rest, and: 1)the force does not act along the center of mass of the object, 2)the object is fixed.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Take equipment out of the box Lay out equipment on the table Step 1. Click the colony walls together Step 2. Clip the curtains on both sides - this.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Primary Mirror Cells.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Using 138T Standing Seam Metal Roof in Shingle Recover Application
(LAM Rocker Door Assembly Modify Proposal )
AU Media/ER/Toyota/Tech/Gen 7/06 Toyota Tundra
How to Install a Garage Door.
Quick Solution Dial Now 1(800) QuickBooks Payroll Support
T.K. Hemmick for the Stony Brook Crew
HOW TO FIX AOL 5 ERROR CODE AOL ERROR 5 MAY APPEAR DURING THE INSTALLATION OF THE PROGRAM OR SOFTWARE RELATED TO AOL INSTANT MESSENGER IS RUNNING DURING.
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Presented By: Derek Muelken – Capital Construction
Heating, Ventilation and Air Conditioning HVAC
Presentation transcript:

1 LBT Q Eng/SW Review ECS: Enclosure Control System

2 Highlights (Q3/2008) We continue to monitor enclosure track, recently performed PM on the rail: bevelling the edges, cleaning the track, and torquing all of the bolts We continue to monitor enclosure track, recently performed PM on the rail: bevelling the edges, cleaning the track, and torquing all of the bolts Enclosure rotation runs at 1.5 deg/sec without problems, just a little noisy Enclosure rotation runs at 1.5 deg/sec without problems, just a little noisy The dewpoint of the compressed air lines to the mirror cells is hovering around -100 deg C The dewpoint of the compressed air lines to the mirror cells is hovering around -100 deg C E-stop bypass push buttons have been installed and tested on vent doors and shutter doors E-stop bypass push buttons have been installed and tested on vent doors and shutter doors Installed another two new latch station donuts (SL1011 and SL0704 closed positions). They are performing well. Installed another two new latch station donuts (SL1011 and SL0704 closed positions). They are performing well. Latch stations: no failures for the last two quarters, completed PM on all latch stations again this fall. Latch stations: no failures for the last two quarters, completed PM on all latch stations again this fall. Temporary patch of building roofs Temporary patch of building roofs ECSGUI bugs fixes and improvements will be made when time is available ECSGUI bugs fixes and improvements will be made when time is available

3 Open Issues Technical – almost no change Technical – almost no change Latch station donut installation of inside donuts requires shutter open Latch station donut installation of inside donuts requires shutter open Finish repair of SL0716 Finish repair of SL0716 Enclosure snow melt dampers in enclosure roof Enclosure snow melt dampers in enclosure roof Leaks along the roof Leaks along the roof High bay roof repair High bay roof repair Brush seals for rotating enclosure and vent doors, have potential solution Brush seals for rotating enclosure and vent doors, have potential solution New design for latch stations New design for latch stations Schedule Schedule Time to install new donuts for the latch stations, brush seals Time to install new donuts for the latch stations, brush seals Financial Financial Order parts Order parts Installation of roof panels next year Installation of roof panels next year Resources Resources Roof repair, seal design, … next year Roof repair, seal design, … next year

4 Planning (Q4/2008) Implement software improvements in the ECS GUI for dewpoint sensors and other changes made to the ECS Implement software improvements in the ECS GUI for dewpoint sensors and other changes made to the ECS Install remaining new latch station donuts where needed Install remaining new latch station donuts where needed