Faculty Meeting Monday, April 4, 2011. Deferred Maintenance.

Slides:



Advertisements
Similar presentations
FOD Facilities Operations and Development November 1, 2011 Presented to Senate Cost Distribution Subcommittee.
Advertisements

Planning an athletic facility project for Middle School Kids! Ms. Pauleys 8 th Grade Math – CTMS April 18, 2013.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
SUNY Fredonia Summer 2014 Projects
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Building for tomorrow’s leaders Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Lease-Leaseback Industry Day January 23, 2014.
Fall 2010 Convocation. Budget Transparency Leeward Community College Operating Budget.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
THE COLLEGE AT BROCKPORT Facilities and Planning Capital Update College Senate November 26, 2007.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
Tower 4 Residence Hall Building Renovation & Asbestos Abatement IBC Engineering, P.C.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Bond Election Presentation 2014 Webb Consolidated ISD.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Presented by Executive Director of Facilities Management Chuck Scott.
SCHEMATIC DESIGN PRESENTATION
U-M Construction Forecast; April 2013 U-M Construction Forecast Spring – Fall 2013 As of April 25, 2013 Prepared by AEC Preliminary & Advisory.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
SUNDAY, MAY 17, 2017 ALLAN DOLMAN St. Andrews Episcopal Church Capital Campaign Report Pledge Drive Report.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Facilities Summary of Sightlines’ Report Campus Profile and Customer Service Survey Results
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
 Net Student Revenues  2384 undergraduate students  Comprehensive Fee - $57,900  90% receive institutional aid –average aid $25,300.
Building Plans.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
LESSONS FROM LOURDES FLOOD EXPERIENCE. Repeating the Past Major flooding occurred in April 2005 Major flooding occurred in April 2005 Lourdes remained.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Sinking Fund Millage Renewal Election- May 7, 2013.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Leeward Community College Fall Semester 2011 Convocation.
BEFORE AFTER SHANKLIN – PARAPET RESTORATION FY 15 Before and After SHANKLIN – PARAPET RESTORATION.
Administrative Services Update August 15, 2011 Fall 2011 Convocation.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
Office of Facilities & Property Management STEPHEN SALBER, DIRECTOR.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District March 3, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Tyler Junior College Critical Infrastructure & Renovation Update Spring 2010.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
TCF Volunteers Conference COL G. Dewey Yeatts, Ed.D. Vice President for Facilities and Engineering 25 February 2012.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
Cuba-Rushford CSD Capital Project
Five Year Capital Projects Plan Through
WOU Budget Committee February,
Facilities Report to the Buffalo State College Senate May 6, 2016
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Space Utilization Advisory Committee November 14, 2017
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Carleton College Summer 2018 Science and Campus Construction Plan
2018 Bond Review and Proposal
Projects in the Pipeline
Project S.O.A.R December 10, 2018 Meeting
Operations Department
St. Michael-Albertville School District # 885
Recent Bond Accomplishments
The projects in the following pages have been identified by our Building & Grounds Commission made up of local architects, engineers, contractors and finance.
Presentation transcript:

Faculty Meeting Monday, April 4, 2011

Deferred Maintenance

Campus Profile

Deferred Maintenance

Annual Facilities Budget

Campus Profile

Renovation Planning No. Major Buildings:31 Ave. Age:53 years Ave. Size:48,848 gross square feet Complete renovation every 100 years ($200/gsf) and major renovation every 50 years ($100/gsf) = $4.5M / year One complete AND one major renovation every 3 years Last renovation project: Severance Hall 2003

Facilities Project List Annual Residence Hall Improvements: Goodhue student rooms Townhouse furniture Annual Campus/Grounds Projects: pavement, walks, etc. Construct parking lot at Second and Union Nourse Quad landscaping Install bike racks at the Library Begin Chapel grounds restoration Remove parking along Bald Spot Relocate softball field Remove Arb tennis courts (insurance proceeds) Laird Track replacement (insurance proceeds)

Facility System Replacement and Repair Building Envelope (roofs, windows, exteriors) Willis tuckpointing - last remaining wall Strawbale warehouse - enclose w/permanent sides Nutting House & garage - replace roofs Burton roof replacement Watson window replacement Goodsell Observatory - replace roof, soffits Olin roof (partial) replacement Sevy/Burton decks - abate and replace Laird Hall tuckpointing Library roof replacement Elevators Remaining upgrades (Willis, Nourse, M&D, Sayles-Hill, Evans) Construct Burton/Davis link and install new elevator Mechanical, Electrical, Plumbing Siemens (EMS) system replacements - Year 2 of 5 Other Laird Stadium restoration - 09/24/10 Flood (insurance proceeds)

Watson Hall Windows

Goodsell Observatory Roof & Soffits

Laird Tuck-pointing

Library Roof Replacement ROOFS RECENTLY REPLACED

Burton/Davis Elevator Link