Final General Assembly – Paris, France – September 19, 2014 FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures 1st October 2011.

Slides:



Advertisements
Similar presentations
1 Plans for the European contribution to OceanSITES. FixO 3 Richard Lampitt National Oceanography Centre Southampton UK.
Advertisements

NOAA RESEARCH PERSPECTIVES: AUTONOMOUS TECHNOLOGIES FOR OCEAN OBSERVATIONS Chris Beaverson Acentia, LLC Supporting: Ocean Exploration and Research Program.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
AST 16 March 2015 Deployment Opportunities Deployment Opportunities Update for AST 16 M. Kramp.
First Marine Board Forum – 15 May Oostende Marine Data Challenges: from Observation to Information From observation to data.
» Data buoys measure air pressure, temperature (sea-surface & air), ocean current velocity and wind velocity across all oceans. These observations are.
Mike McPhaden NOAA/PMEL Seattle, Washington
Argo September 2004 The status of the Argo project What is Argo trying to do How is it doing it? What have we achieved so far? What has happened since.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
The MyOcean Concept P.Bahurel, project coordinator.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP9: New Methods to Assess the Impact of Coastal Observing Systems Presented by.
Pierre Testor LOCEAN, CNRS, Paris, France EuroGOOS Joint ROOS-WG-TT, 04 March 2015, Brussels, Belgium 1km ~2-5km Data Centers Land Station users A “glider”
UNDERWATER GLIDERS.
1 EuroSITES to FixO 3. Richard Lampitt National Oceanography Centre Southampton UK.
BPO Science Program14 December 2014Webiinar We cannot manage what we do not measure: Martin Kramp - JCOMMOPS Ship Coordinator.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
MARINERA Marine ERAnet European Research Area Identify research infrastructures Promote exchange between research teams in and outside Europe Organise.
Main components of monitoring and forecasting in Arctic and sub-Arctic regions Modelling and Forecasting capacity From MERSEA IP to the Marine Core Service.
Polar Communications and Weather Mission Canadian Context and Benefits.
Observing System Status- Brief Overview Will post PPts from Mike Johnson and from Eric Lindstrom from the annual review of the NOAA Climate Observations.
ODINBLACKSEA Meeting, Ostende October BULGARIAN ACADEMY OF SCIENCES INSTITUTE OF OCEANOLOGY BGODC 2010 BULGARIAN NATIONAL OCEANOGRAPHIC DATA.
Scientific Needs from the Climate Change Study in the Ocean Toshio Suga Tohoku University (Japan) International Workshop for GODAR-WESTPAC Hydrographic.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
CTD and rosette CLOSING REMARKS Think about huge range of options, e.g. for measuring temperature:
OOI Annual Review Year 2 May 16 – 20, 2011 Ocean Observatories Initiative Surface and Subsurface Mooring Telemetry Inductive and acoustic technology and.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
Glider sustained observations in the Mediterranean Testor P., Heslop E., Gana S., A. Bosse, Hayes D., Ait-Ameur N., Budillon G., Gildor H., Iudicone D.,
“Toward a GOOS glider programme: Tools and methods” General Assembly.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
Laura Beranzoli Istituto Nazionale di Geofisica e Vulcanologia October 5-7, 2009ESONET NoE - 2nd All Region Workshop WP4 – Demonstration Missions.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
S&T cooperation Mediterranean and EU countries Spanish proposal Casablanca, 17th November 2009 Dr Angeles Rodríguez-Peña Deputy European Programmes Ministry.
Bob Keeley Marine Environmental Data Service Dept. of Fisheries and Oceans Ottawa, Canada Jun, 2006 SeaDataNet Meeting.
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
Monitoring atmospheric composition using satellite-ground-based synergies P. Ciais (1), C. Textor (1), M. Logan (1), P. Keckhut (2), B. Buchmann (4), S.
EuroGOOS Annual Meeting 2009/10/ /10/08 ESONET All Regions Workshop 2009, October 5-7 th, Paris Integrating and Enhancing the European capacity for.
IndOOS—a sustained ocean observing system in the Indian Ocean for climate research Howard Cattle for Gary Meyers Co-Chair CLIVAR/GOOS Indian Ocean Panel.
JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
NOAA’s Office of Climate Observation Presented to the JTA XXIII Angra Dos Reis Rio De Janeiro October , 2003 Sidney W. Thurston, Ph.D. National.
Speaker I Organism I adresse mail Date I City I Land Future Strategy for Coastal Observatories From National programme to a pan European.
European Gliding Observatories Network (EGO) Action ES0904: Start date: 01/10/2010 End date: 30/09/2013 Year: 1 Pierre Testor Chair LOCEAN-CNRS / France.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
OCEAN FACILITIES EXCHANGE GROUP Update on a bottom-up approach of research fleet co-ordination & harmonisation Marieke J. Rietveld, NIOZ,
ECOOP annual meeting Feb 13-14, Objectives & Description. Objectives: Collect meta data and historical data for temperature and salinity measurements.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
The Argo Project: An International Partnership Dean Roemmich, International Argo Steering Team The role of partnerships in: Creating Argo Coordination.
U.S. Integrated Ocean Observing System (IOOS ® ) Z Improve safetyEnhance our economyProtect our environment CIMAR-GOMC meeting – 25 Feb 2015 Zdenka Willis.
Summary 26 September 2012 Core Theme 5: Technological Advancements for Improved near- realtime data transmission and Coupled Ocean-Atmosphere Data Assimilation.
Argo is an international program to deploy 3,000 profiling floats to collect observations of the temperature and salinity structure of the upper ocean--globally.
Sensor Web Enablement (SWE) developments for fixed monitoring platforms and research vessels By Dick M.A. Schaap – SeaDataNet Technical Coordinator with.
Workshop Sensor Web Enablement (SWE) for oceanography - introduction Dick M.A. Schaap – MARIS March 2016.
Moving away from the fish-eye view Integrating Surveys for the Ecosystem Approach 29 May 2013, Ingeborg de Boois (WGISUR)
Status of the Global Ocean Observing System – April 2015 David Legler, Director Climate Obs Division NOAA Climate Program Office OOPC – April 2015 Sendai,
Welcome to OceanSITES 11th Steering Committee and 8th Data Management Team Meeting April 2016.
JCOMM in-situ Observations Programme Support Centre www. jcommops
FP7-Infra : Design studies for European Research Infrastrutures
Candyce Clark JCOMM Observations Programme Area Coordinator
IHO-European Union Network Working Group (IENWG)
Patrick Farcy, Simon Keeble, Aldo Drago
Task 2.3 Optimization and coordination of existing TMA systems, improved data delivery for predictions and identification of gaps [Lead: HAV; Participants:
JCOMM in-situ Observations Programme Support Centre www. jcommops
Challenges & opportunities for developping regional cooperation
JCOMM in-situ Observations Programme Support Centre www. jcommops
UNDERWATER GLIDERS.
Presentation transcript:

Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month 18 – month 39) Grant Agreement No: ; Total budget : 3,5 M€ 19 partners from cy, de, fr, gr, it, no, es, uk “Gliders for Research, Ocean Observation and Management” General Assembly

Final General Assembly – Paris, France – September 19, 2014 WP 4.1 / D4.1 The role of gliders in sustained observations of the ocean David Smeed (NOC), presented by Jan Kaiser (UEA)

Final General Assembly – Paris, France – September 19, 2014 WP1 Project S/T Coordination WP1 Project S/T Coordination WP4 Targeted Experiments WP4 Targeted Experiments WP5 Observatory Infrastructure WP5 Observatory Infrastructure WP3 Scientific Innovation WP3 Scientific Innovation WP2 Integration in the GOOS WP2 Integration in the GOOS WP2.1 Assessment of a glider component in the GOOS WP2.2 Legal framework WP2.3 Financial framework WP3.3 Capacity building and training, outreach WP3.2 Data flow and processing WP3.1 New contributions of glider for marine research WP4.2 Fleet missions WP4.1 Endurance lines WP5.3 Mission planning and analysis WP5.2 Glider payload assessment WP5.1 Ground segment description WP1.1 Project coordination WP5.4 Estimated setup and running costs WP1.2 Internal & external communication WP4.3 Synergies with other platforms WP6 Project Management WP6 Project Management

Final General Assembly – Paris, France – September 19, 2014 Sustained ocean observations Motivation Opportunities and challenges for glider technology Examples of sustained observations from gliders Conclusions

Final General Assembly – Paris, France – September 19, 2014 Motivation CLIVAR programme: "Maintain over many decades a sustained ocean observing system capable of detecting and documenting global climate change". Long-term perspective for climate research Long-term monitoring is a fundamental requirement of the European Union (EU) Marine Strategy Framework Directive (MSFD).

Final General Assembly – Paris, France – September 19, 2014 Sustained sub-surface observations Repeat sections, either hydrographic sections by research vessels; XBT sections from vessels of opportunity Fixed observatory sites – e.g. hydrographic data at Ocean Weather Ship Station (OWS) Mike in the Norwegian Sea since ARGO network of profiling floats

Final General Assembly – Paris, France – September 19, 2014 GO-SHIP reference sections

Final General Assembly – Paris, France – September 19, 2014 EuroSITES fixed point observatories

Final General Assembly – Paris, France – September 19, 2014 The ARGO programme

Final General Assembly – Paris, France – September 19, 2014 Opportunities and challenges for glider technology growing range of oceanographic sensors Argo profiling floats cannot sample at specific locations and little data is obtained on the continental slope GROOM partners have tested the capability of gliders to make sustained observations.

Final General Assembly – Paris, France – September 19, 2014 To provide more frequent sampling than is possible with available ship-time or budget. To obtain data with higher spatial resolution. To obtain data in real-time for data assimilation and for increased data security. Why use gliders?

Final General Assembly – Paris, France – September 19, projects by GROOM partners with glider trials or regular use for sustained observations In some cases, glider have replaced other platforms or enabled new programs to start In other cases they naturally found a niche and were combined with other platforms. But there are some cases where gliders were found to not yet be suitable or cost effective. Sustained observations by gliders in GROOM

Final General Assembly – Paris, France – September 19, 2014 Advantages –more frequent sampling per ship-time and budget –higher spatial resolution. –real-time data for assimilation and more data security Disadvantages –navigation in strong currents difficult –reliability –additional resources required –risks of collision with vessels Conclusions from GROOM missions

Final General Assembly – Paris, France – September 19, 2014 ships observations were biased to the summer months (see plot below) now: 3 years of quasi- continuous glider observations Example 1: The Balearic Channels in the western Mediterranean

Final General Assembly – Paris, France – September 19, 2014 RAPID requires continuous data, and the reliability of gliders was not sufficient to replace the moorings. Gliders effective for measuring near surface / very difficult with moored instruments Example 2: RAPID project at 26° N

Final General Assembly – Paris, France – September 19, 2014 The use of gliders is most successful when gliders can completely replace other platforms (e.g. Balearic Channel) there is easy access to deployment and recovery sites close to shore (e.g. Balearic Channel) it is only required to sample the upper 1000 m (e.g. shallow thermocline in the Mediterranean Sea; Ruiz et al., 2012). Conclusions 1

Final General Assembly – Paris, France – September 19, 2014 Types of sustained observation for which gliders are particularly well suited: real-time data thanks to glider data telemetry continental slope where Argo data are rare near surface where moored instruments are difficult to use Conclusions 2

Final General Assembly – Paris, France – September 19, 2014 Future needs include improved reliability (cf. APEX floats) increased depth capability (but: implies reduced repeat sampling frequency) increased endurance to increase repetition frequency and to make larger parts of the ocean accessible from individual glider ports Conclusions 3