Solar Probe Plus A NASA Mission to Touch the Sun End to End Test Agenda April 24, 2014 Elena Adams SPP Payload Systems Engineer.

Slides:



Advertisements
Similar presentations
The Sun Devil Satellite Laboratory Ricky Astrain Mentor: Dr. Iman Alizadeh.
Advertisements

Innovation You Can Count On™ 1 Payload Integration Wendi Otto Systems Engineer, Pegasus and Taurus Launch Vehicles October 4, 2007 All Information Approved.
MAE 491/492 Integrated Product Team Design Examples Bringing the Real World into the classroom.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Hubble Recovery with STS Bryan Palaszewski working with the Digital Learning Network NASA.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
Systems Engineering for Space Vehicles Bryan Palaszewski with the Digital Learning Network NASA Glenn Research Center Cleveland, OH.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
SPP Spacecraft Emulator (SCE) Introduction
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Space unit Life in Space.
Introduction To Engineering Camera Lab #2 - 1 Agenda Shutter Mechanism Review basic statistical methods Opening the camera case Measure flash duration.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
ADCS Review – Attitude Determination Prof. Der-Ming Ma, Ph.D. Dept. of Aerospace Engineering Tamkang University.
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Solar Probe Plus A NASA Mission to Touch the Sun Andy Driesman.
Test-as-You Fly SpaceWire for Solar Probe Plus
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Background  EM16 SGS+TEC met with FD 1 year ago  Both sides agreed that there was a “performance gap:  SGS prepared a TN with 2 main options to bridge.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
Jan 2008 LMSSC - 1 SWEA Plume Impingements Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission.
Engineering Challenge: Thermal Protective System.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
1 The Discovery Dome, sponsored by the MMS Mission and the “Future Space” program, reached over 3100 people during the three days of the USA Science and.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Program Management Agenda
The road to the first E2E tests
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Fault Protection Techniques in JPL Spacecraft
Spacecraft Interface and I&T
Solar Probe Plus FIELDS
Solar Probe Plus – SWG September 2, 2016
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
0.0 Instrument Suite Name Presenter’s name
CRaTER Pre-Environmental Review (I-PER) Programmatics Rick Foster
Current SOC-Ground System Integration Schedule (Jan )
TEMPO’s Commercially Hosted Payload Concept
LRO Mission Operations Concept
Jim Aloise System Programmer
Integration and Test Organization Chart
CubeSat vs. Science Instrument Complexity
TABLE OF CONTENTS TABLE OF CONTENTS: Mission Overview Timeline
1. Process Hazards Checklists
Presentation transcript:

Solar Probe Plus A NASA Mission to Touch the Sun End to End Test Agenda April 24, 2014 Elena Adams SPP Payload Systems Engineer

Solar Probe Plus A NASA Mission to Touch the Sun Agenda 2 Start Time Duration (min)Comments Introductions/ LogisticsAdams8:3010 I&T OverviewDolbow8:4060 Mission SimulationsPinkine9:4015 IRR Checklist WalkthroughDolbow9:5520 Instrument Specific I&T Discussion10:15 SOC and MOC Early Compatibility Testing15 Initial Integration & Test15 Early fit checks? Special GSE needed, proximity to spacecraft Bench Testing- Initial Integration- Normal Operation- Spacecraft Level Testing10:45 Functional15Participation and SOC expectations Aliveness15Participation and SOC expectations CPTs15Participation and SOC expectations Mission Simulations 1-415Participations (2,3,4) and expectations Lunch11:45

Solar Probe Plus A NASA Mission to Touch the Sun Agenda (cont) 3 High/Low Voltage Test12:3015Participation Shock and Separation12:4515Participation and SOC expectations Special Testing1:0030 Deployment testing, timing tests, others? Instrument Specific Autonomy and Fault Protection Testing Thermal Vaccuum and Thermal Balance1:3030Special configuration? Sources? Acoustic2:0015Participation and SOC expectations Vibration2:1515Participation and SOC expectations EMI/EMC2:3015 Shipment2:4515Configuration, blankets, etc.. Testing at the Cape3:0015 MSIM 5 Special Testing LaunchPinkine3:1515 Participation and SOC expectations, layout of the MOC Post-Launch3:3015Participation and SOC expectations Purging/ Contamination Approach4:0030Best configuration, covers Alignments4:3030When, how Start Time Duration (min)Comments

Solar Probe Plus A NASA Mission to Touch the Sun Example of test inputs (CPTs) 4 TE-004 example will be distributed to the teams prior to the meeting We request the teams to bring the filled out information to the meeting (or at least the first stab at it)