Cook Stove for Haiti Enhancements System Level Design Review Friday, January 14 th 2011 11:00 AM – 12:30 PM Project 11461.

Slides:



Advertisements
Similar presentations
Use of solid fuels MICS3 Data Analysis and Report Writing Workshop.
Advertisements

Energy Service Productivity Management ©2007 ESPM Energy Consultants, L.L.C. All Rights Reserved.
MULTIDISCIPLINARY SENIOR DESIGN PROJECTS P12441 & P PowerStove: Cooking for a Third of the World.
P12441: Thermoelectric Power Pack for Next Generation Stove Andrew Phillips – Project Manager Colin McCune – Lead Engineer Lauren Cummings – Electrical.
Thermoelectric Cook Stove for Haiti TESTS Water Boil Test – a test to characterize the performance of a cook stove by boiling and simmering a pot of water.
P10462: Thermoelectric Power System for Cookstove.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
P11451 Week 3 Cook Stove Test Stand Group. Agenda Customer Needs-updated Engineering Specs-updated System Level Work Risk List- version 1 Plans for week.
Thermoelectric Cook Stove for Haiti TESTING TEAM Tests Water Boil Test – a test to characterize the performance of a cook stove by boiling and simmering.
Thermoelectric Cook Stove for Haiti TESTS Water Boil Test – a test to characterize the performance of a cook stove by boiling and simmering a pot of water.
P10462: Thermoelectric Power System for Haitian Stove.
P11462: Thermoelectric and Fan System for Cook Stove Jared RuggProject Manager (ME) Brad SawyerLead Engineer (ME) Jeff BirdMechanical Engineer Tom GorevskiElectrical.
Cook Stove for Haiti Project Jordan Hunter Rob Reid Mike Lagos Brian Knight Stove Construction.
Young Jo Fontaine – ME Dan Higgins – EE Shawn Hoskins – ME Luke Poandl – EE Dan Scannell - ME.
Thermoelectric Cook Stove for Haiti TESTING TEAM Tests Water Boil Test – a test to characterize the performance of a cook stove by boiling and simmering.
Project Initial Overview Presentation Phillip Amsler David Sam Huseyin Zorba.
Thermoelectric Cook Stove for Haiti TESTS Water Boil Test – a test to characterize the performance of a cook stove by boiling and simmering a pot of water.
Cook Stove for Haiti Project Date: February 22, 2011 Location: Time: 8am – 9am Managerial Design Review.
Team P08404: Team Members: Ben Johns (ME) Adam Yeager (ME) Brian T Moses (ME) Seby Kottackal (ME) Greg Tauer (ISE) Faculty Guide: Dr. Stevens Review Date:
LED LIGHTING SYSTEMS FOR DEVELOPING NATIONS: LIGHTING A THIRD OF THE WORLD Ian Frank (ME), Matthew Walter (ME), Jesse Steiner (EE), Luke Spencer (ISE),
Cook Stove for Haiti Project Date: April 22, 2011 Time: 1pm – 2pm Data Review.
Cook Stove for Haiti Project Date: May 13, 2011 Location: Time: 2:15pm – 2:45pm Project Review.
P /20093 Composites Autoclave Brandon Allen (EE) Matt Brady (ME) Brian Cario (ME) Matt DiFrancesco (ME) John Mink (EE) ‏ Chris DeMinco.
Underwater Robotic Fish Week 3 Review Presentation Project #15029 Multidisciplinary Senior Design Rochester Institute of Technology Phase II: Buoyancy.
Release & Deployment ITIL Version 3
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
S/W Project Management
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Basics of OHSAS Occupational Health & Safety Management System
Supply Chain Management: From Vision to Implementation Chapter 4: New Product Development Process: Managing the Idea Infrastructure.
Thermoelectric Stove for Haiti Electrical Engineers: Lauren Cummings, Colin McCune, Andrew Phillips, Xiaolong Zhang Mechanical Engineers: Marissa Blockus,
Shell Company EDSGN 100, Sec. 017 Still Eagles Submitted to Andy Lau December,
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
Ankle Linear Force Comparison A (reference)BCD Current Passive-Dorsi-flex AFO Dorsi-flex assist AFOPlantar-flex assist AFOPlantar/Dorsi assist AFO Segment.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Domestic Energy Consumption North Kivu. Energy Production Charcoal production in Bulengo IDP Camp.
CPSC 372 John D. McGregor Module 2 Session 1 More on requirements and the Investment Decision.
43 rd Annual Western States Highway Equipment Managers Association Conference Washington State Department of Transportation Presentation August 29, 2011.
System Level Preliminary Design Review Friday, January 15, :30am – 12:00pm.
Cook Stove for Haiti Project Date: February 11, 2011 Location: 78:2150 Time: 10:15am – 12:15pm Detailed Design Review.
ROCHESTER INSTITUTE OF TECHNOLOGY Student Team Members: Ian Frank, Matthew Walter, Nicholas Balducci, Lucas Spencer, Jesse Steiner, Mike Celentano Faculty.
Committed to connecting the world ITU-T Study Group 5: the role of green ICT standards for sustainable ICT development: Paolo Gemma Huawei Chairman, Working.
1 Energy Efficient Buildings PPP: Results and outlook from an industry perspective On behalf Stefano Carosio D’Appolonia SpA/E2BA Coordinator EeB PPP AIAG.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Tier 4 and Beyond! (We’re closer than I thought…) Dean Still Aprovecho Research Center.
Berkeley Air Monitoring Group Supportive Environments for Healthy Households & Communities 3-4 November 2010.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
Eight tips for burning wood. Tip 1 Air! The wood is utilised in the best way when the draught control is fully open and the flames are intense. That will.
P Magnetically Levitated Propeller Group Members: Eli, Zach, Mike, Joe, & Bernie.
Port Fuel Injection VS. Direct Fuel Injection The Basics of DFI The main focus of DFI is to effectively and precisely control the fuel-to-air ratio. To.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
1. Rabka-Zdroj for more than a hundred years is a spa town famous for its large resources of medicinal mineral waters. › Disadvantage: geographical location.
Session 2: Developing a Comprehensive M&E Work Plan.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
" The Importance of RM in strategic in sustainable service delivery How to avoid Service Delivery Protest ” Institute of Municipal Finance Officers & Related.
Thermoelectric Power Pack for Next Generation Stove Andrew Phillips Colin McCune Lauren Cummings Xiaolong Zhang.
Thermoelectric Cook Stove for Haiti TESTING TEAM Tests Water Boil Test – a test to characterize the performance of a cook stove by boiling and simmering.
P08441:Thermoelectric Auto Exhaust Power Generation Project Introduction : The motivation for this project stems from an increasing need for highly efficient.
 Dept of Mechanical Engineering  Christopher Brol (Team Lead)  Aaron Dibble  Ian Donahue  Kevin Molocznik  Dept of Industrial Engineering  Neal.
Recent Developments in the Clean Combustion of Coal
Honeywell Fuel/Air Ratio Control System
Equilibrate System upgrade
Team P15441 Mini Air Sub-System Design Review
ENGINEERING ECONOMICS
Next Generation Charcoal Stove for Haiti
Presentation transcript:

Cook Stove for Haiti Enhancements System Level Design Review Friday, January 14 th :00 AM – 12:30 PM Project 11461

Team Members Project Leader Rob Reid (ME) Lead Engineer Jordan Hunter(ME) Team Engineers Alex Seidel (ME) Brian Knight (ME) Mike Lagos (IE)

Presentation Overview Project Background Project Overview Work Breakdown Functional Decomposition Customer Needs Engineering Specifications System Architecture System Integration Risk Assessment Design Concepts Project Plan Traditional Cook Stove

Project Background The World Health Organization estimates 3 billion people use biomass cooking regularly. Approx. 1.5 million people die each year from stove emissions Our main focus is the people of Haiti who’s main method of cooking is open flame stoves, utilizing charcoal and wood. We are partnering with the H.O.P.E. Organization, which works with the Haitian people to help improve their living conditions and save lives. H.O.P.E. is working with RIT to create an improved cook stove design which is more efficient and less hazardous to its users. Image from feaststl.com shows a basic lump charcoal cooking stove

Project Overview Mission Statement Design and construct all mechanical and structural aspects of a thermoelectric biomass cook stove. The stove will utilize a blower/fan powered by thermo-electrics to significantly increase efficiency and reduce fuel consumption and emissions. In comparison with current Haitian stoves, the project stove will have a reduction in emissions and required fuel of 50% Deliverables An improved RIT stove design that has been tested and validated using a working prototype. The improved stove is to reduce fuel use and emissions by more than 50% from traditional Haitian stoves. Build at least two prototype stoves to be sent to Haiti for field testing. Detailed project report. Detailed presentation for Imagine RIT.

Work Breakdown * Everyone Participates in Stove Design and Key Design Decisions in each subsystem.

Functional Decomposition

Customer Needs

Engineering Specifications

System Architecture

System Integration (With Thermo-electric team 11462)

Risk Assessment IDRisk ItemEffectCause Likeliho od Severity Importa nce Action to Minimize RiskOwner Describe the risk briefly What is the effect on any or all of the project deliverables if the cause actually happens? What are the possible cause(s) of this risk? L*S What action(s) will you take (and by when) to prevent, reduce the impact of, or transfer the risk of this occurring? Who is responsible for following through on mitigation? 1Material cost too high. Will not be able to be manufactured or marketed in Haiti. Designed with resources unavailable to Haitians. 326Ensure materials are locally available in Haiti.Rob 2Stove not easily repaired.Life of stove can be altered. Designed as a one piece system. 212 Design pieces with a high potential of breaking to be easily removed. Michal 3 Combustion will not begin in stove. Harmful emissions/ less efficient. Improper air flow.133Begin combustion with a fan run by batteries. Alex 4Does not meet emissions goal.Cannot be used indoors.Insufficient stove design.236 Complete combustion of fuel must be obtained. Brian 5 Does not meet high efficiency goal. Stove needs to be redesigned.Insufficient stove design.236Heat transfer to pot must be maximized.Jordan 6 Thermoelectric fan does not supply sufficient supply of air. Forced air system will not work resulting. Analysis of air flow was incorrect. Didn't interact with other teams enough. 133 Theoretical airflow analysis must include potential losses. Jordan 7Stove too heavy and not mobile.Cannot be marketed to vendors. Overlooked customer mobility need. 236Final product must be made of light materials. Michal 8 Insufficient interaction between SD1 Thermoelectric Stove Teams. Stove does not meet needs or specs. Don't consult other teams.224 Maintain consistent communication with other teams. Rob 9 Heat output by stove is not adjustable. Stove will resemble current stoves. Did not take customer needs into consideration. 326 Coordinate with thermoelectric fan group to ensure flow is adjustable. Jordan 10 Stove not properly designed for Haitian customs/ traditions. Haitians will not adopt the new technology for use. Insufficient knowledge of current cooking practices. 236 Pay close attention to customer needs and engineering specs. Brian 11 Cannot be manufactured within Haitian abilities. Stove cannot be built in Haiti. The stove design is too complex. 236Do not overdesign the stove.Michal 12 Materials unavailable for prototype stove. Cannot build or test a stove with the correct materials. Materials are unavailable to us or ordered too late. 224Do not delay in ordering the materials. Team 13Stove design is unstable. Stove will tip over easily and be dangerous to operate. Stove is top heavy or too narrow. 236 Design stove with a large footprint to ensure stability. Michal

Benchmarking On average the fuel use was reduced 33%, CO emissions by 75%, and PM emissions by 46% in comparison to the three-stone fire. A light insulative material in the combustion chamber generally resulted in decreased levels of emissions. Use of a pot skirt can reduce fuel use and emissions by an additional 25 – 30%. Rocket Stove Forced air stoves reduce fuel use by an average of 40% over traditional 3 stone fires. Reduces emissions by up to 90% compared to the three-stone fire. Accelerates lighting process Forced Air

Concept Development Nordica MacCarty, 2010, Energy for Sustainable Development, testing of fifty cooking stoves, ScienceDirect Stove Comparison

Conceptual Designs Design Elements

Conceptual Design Vertical Combustion Stove Fan Inlet Skirt Combustion Camber Combustion Air Inlet Gap forces channeling of hot gases Air “pre-heats” before entering combustion chamber. Minimal Heat loss around Pot

Project Plan

Questions?