SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Data Acquisition for the ILC G. Eckerlin DESY LCD Group meeting, SLAC, Jan 27 th 2005 Outline Conditions.

Slides:



Advertisements
Similar presentations
Latest Developments from the CCD Front End LCWS 2005 Stanford Joel Goldstein, RAL for the LCFI Collaboration.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
19 March 2005 LCWS 05 M. Breidenbach 1 SiD Electronic Concepts SLAC –D. Freytag –G. Haller –J. Deng –mb Oregon –J. Brau –R. Frey –D. Strom BNL –V. Radeka.
1 Instrumentation DepartmentMicroelectronics Design GroupR. Turchetta 3 April 2003 International ECFA/DESY Workshop Amsterdam, 1-4 April 2003 CMOS Monolithic.
A new idea of the vertex detector for ILC Y. Sugimoto Nov
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
L.Royer– Calice DESY – July 2010 Laurent ROYER, Samuel MANEN, Pascal GAY LPC Clermont-Ferrand R&D LPC Clermont-Fd dedicated to the.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
ALCPG Workshop, Cornell, July '03 1 G. Eckerlin Data Acquisition for an LC Detector Report from the extended ECFA/DESY LC Workshops Cornell, Jul. 15 th.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Snowmass P. Le Dû Next generation of Trigger/DAQ Where are we today? Evolution On/off line boundaries What next ? LC’s Triggers.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
DAQ for 4-th DC S.Popescu. Introduction We have to define DAQ chapter of the DOD for the following detectors –Vertex detector –TPC –Calorimeter –Muon.
Data Acquisition Issues at the International Linear Collider Front End Readout Issues ● Large channel counts require low power consumption power cycling.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
LCWS05 Stanford - P. Le Dû 1 What next  Snowmass Menu Basic parameters and constraints Detector concepts Front end electronics and read out issues Data.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Joel Goldstein, RAL 4th ECFA/DESY LC Workshop, 1/4/ Vertex Readout Joel Goldstein PPd, RAL 4 th ECFA/DESY LC Workshop DAQ Session 1 st April 2003.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
LHCb front-end electronics and its interface to the DAQ.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
Overview of the High-Level Trigger Electron and Photon Selection for the ATLAS Experiment at the LHC Ricardo Gonçalo, Royal Holloway University of London.
Predrag Buncic Future IT challenges for ALICE Technical Workshop November 6, 2015.
Data Acquisition, Trigger and Control
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
Pixel detector/Readout for SuperB T.Kawasaki Niigata-U.
Silicon Tracker Data Acquisition and Electronics for the Linear Collider Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3 On behalf.
Overview of the Data Acquisition Activities
Marcin Chrząszcz Cracow University of Technology Itamar Levy
Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Status of the Beam Phase and Intensity Monitor for LHCb
Electronics Issues & challenges for future linear colliders
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Power pulsing of AFTER in magnetic field
Toward a costing model What next? Technology decision n Schedule
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
VELO readout On detector electronics Off detector electronics to DAQ
Status of n-XYTER read-out chain at GSI
Example of DAQ Trigger issues for the SoLID experiment
SiD Electronic Concepts
SVT detector electronics
LHCb Trigger, Online and related Electronics
Signal processing for High Granularity Calorimeter
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
The CMS Tracking Readout and Front End Driver Testing
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
TELL1 A common data acquisition board for LHCb
Presentation transcript:

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Data Acquisition for the ILC G. Eckerlin DESY LCD Group meeting, SLAC, Jan 27 th 2005 Outline Conditions Software Trigger Concept Front End Readout Examples Central DAQ issues Some Questions

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Credits Work done and reported by mant people in the Linear Collider Physics and Detector Workshops 4 th ECFA/DESY Workshop Amsterdam/Netherlands Apr Cornell Linear Collider Workshop Ithaka/USAJul st ECFA Study Workshop Montpellier/FranceNov Asian Linear Collider Workshop Mumbai/IndiaDec ALCPG 2004 Winter Workshop SLAC/USAJan International Linear Collider Workshop Paris/FranceApr nd ECFA Study Workshop Durham/UKSep Asian Linear Collider Workshop Taipei/TaiwanNov. 2004

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 ILC Physics Processes Physics (M. Thompson): e + e -  qq 330/hr e + e -  W + W -  930/hr e + e -  tt  70/hr e + e -  HX  17/hr Backgrounds : e + e -    X 1000/sec (200/train) VTX : 600hits/BX (due to e + e - pairs) TPC : 6tracks/BX  high precision studies of low cross section physics on a huge 'background'  be ready for the 'unexpected'

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 The ILC Time Structure The ILC is a pulsed machine (from TESLA TDR 500/800GeV) train repetition rate 5 (4)Hz bunches per train2820 (4886) bunch separation337 (176) ns train length950 (860)  s train separation199 (249) ms -> long time between trains (relatively short between bunches) TESLA 500 GeV

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 The Software Trigger Concept Take advantage of the long time between trains 1ms active pipeline (collect data of complete train) No trigger interrupt Sparsification / cluster finding at front end Read complete detector data between trains (~ 200ms) Event selection by software based on complete train and detector information -> Highly efficient and very flexible event selection

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Data Acquisition Conceptual Design up to 1 ms active pipeline (full train), no trigger interrupt, sparcification/cluster finding at FE standardized readout units (RU) software event selection using full information of a complete train define 'bunches of interest' move data only once into PC and relevant data to storage optional subdetector event building readout between trains (200ms) event building network and farm complete train into a single PC !!

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Overview Data Volume (from Tesla TDR) (some numbers outdated but conclusion still holds)  ~ 1 GByte / sec (currently PCs reach 80MB/sec with GbitE !)

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 CMS DAQ System L1 input 40MHz -> L1 output 100kHz(ILC bx rate : 12kHz) up to 500GBit/sec over switched network(ILC : ~10Gbit/sec)  CMS HLT is a good 'prototype' of the ILC software trigger

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Comparing DAQ systems High Level-1 Trigger (1 MHz) High No. Channels High Bandwidth (500 Gbit/s) High Data Archive (PetaByte) LHCb KLOE HERA-B CDF/DO II CDF H1 ZEUS UA1 LEP NA49 ALICE Event Size (bytes) ATLAS CMS L1 Rate (Hz) The Challenge! Fast Networking Moves Data from a local environment to a Global One Cheap DRAM allows for large buffering, and latency Cheap Commodity Processors allow for powerful algorithms with large rejection Btev Ktev ILC ? Patrick LeDu, LCWS 2004

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Some Front End Readout Examples

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Vertex Detector 5 layer pixel detector, Layer 1 as close as possible to beampipe high granularity, hugh number of channels (~1Giga pixels) Main concern : occupancy due to backgrounds (e+e- pairs) Layer 1: 350hits/bx, Layer 2 : 200hits/bx (K. Buesser, Jan.05) To keep occupancy low need readout during train online sparcification, local buffering Data volume per bunch train : ~ 20 Mbytes

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Vertex Detector (example CCD) 5 layer CCD 800 million channels column parallel readout readout ASIC bump bonded Amplifier 5-bit FADCs Filter Sparsification logic local memory 2 optical links 1Gbit/s in total 20 Mbytes / train Joel Goldstein, LCWS 2004

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 TPC Main Tracker Readout channels : 1.2 x 10 6 (for digital TPC : up to ) 200 samples/track, ~ D readout voxels (20MHz sampling) Occupancy ~ % Main concern : reduce ion feedback without gating during train Gasamplification with GEMs or Micromegas Front end electronics from LHC (Alice) as an example: preamp, FADC, zero suppression, digital buffer power consumption (40mW/channel) ? Integrates over 160 bx (total drift time ~50  s) Data volume per train : ~ 100 – 300 Mbytes

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 TPC DAQ at LHC Ron Settles Conrnell 2003

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Silicon Envelope The Silicon Envelope concept = ensemble of Si-trackers surrounding the TPC ( LC-DET ) The Silicon Envelope concept = ensemble of Si-trackers surrounding the TPC ( LC-DET ) The Si-FCH: The Si-FCH: TPC to calorimetry TPC to calorimetry(SVX,FTD,(TPC),SiFCH) The FTD: The FTD: Microvertex to SiFCH Microvertex to SiFCH The SIT: The SIT: Microvertex to TPC Microvertex to TPC The SET: The SET: TPC to calorimetry TPC to calorimetry (SVX, SIT, (TPC), SET TPC Microvertex

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Silicon Envelope Few million channels, occupancy from 1 % to <10 % Main concern : noise power consuption (without power cycling would be ~ 800 W) Front end readout includes analog pipeline, multiplexing 256:1, 10Bit ADC, digital buffers Data volume per train : ~ few MByte (J.F. Genat, H. Lebbolo, Ph. Bailly, T.H. Pham) presented by A. Savoy-Navarro

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Silicon Envelope Front End Electronics Aurore Savoy-Navarro Amsterdam channels/ladder 2560 channels/drawer A/D=0.35µtechno, 8 bits 1MHz clock, 1.2mW

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Silicon Main Tracker & SiW ECAL Main concern : occupancy in forward disks for Si Tracker power consumption (<40mW/wafer) Readout 1K (2K) channels per ASIC on a wafer zero suppession, analog storage, digitization between trains Data volume per train ECAL ~ 4MByte, Si Tracker ? (see talk from Marty Breidenbach on 16 Dec. 04)

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Accelerator Data Acquisition NLC Data Collection ● There are ~11K accelerator sections and 1K BPM’s. ● Data per bunch (Not train, debatable if needed) ● BPM X,Y,I – 2 bytes each + 10 bytes stuff = 16 bytes ● Acc Section - 2 positions + FE + RE + 2 bytes + 20 bytes stuff = 30 bytes ● 200 bunches/train * 120 trains/sec = ~20000 bunch/sec ● Data Rate = 20000*(11K*30+1K*16)=7 Gbytes/sec ● Should not be worse than 10 for the whole machine!! ● Begins to look like a distributed detector data acquisition problem. Some data compression will be needed. ● Rapid access and analysis of this data may be a fun problem. Marty Breidenbach Conrnell 2003 close to CMS !!

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Summary Front End Readout Power consumption (high granularity -> large channel count) power cycling assumed otherwise many kW per system alternatives ? Near beam detectors may have occupancy at the limit readout of sensors during train (some with local storage) sensitive to background variations ? (radial segmentation!) Complex front end electronics zero suppession, analog storage, ADC, digital buffering all designs assume to send digital data to the off detector DAQ highly multiplexed systems to reduce number of cables what about failures, redundancy, alternative designs ?

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 The Central DAQ Parts...

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Detector and DAQ Control (to do list 1) Monitor detector hardware automatic recovery, alarms, automatic configuration ? Distribute control signal to front end central clock, first bunch, run start/stop, reset, initialize, etc Partitioning allow for readout of detector part and local DAQ runs parallel streams to storage (ECAL cosmics, TPC pulser, etc) Download detector constants & calibration data

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Calibration (to do list 2) Calibration (to do list 2) Good online calibration needed for good event selection have to develop strategy Monitor detector performance online avoid degradation of data quality and selection efficiency Alignement data, detector linking check stability, recalibration, special runs needed ?

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Event Selection (to do list 3) Develop filter algorithms Define data to be stored (Bunch of Interest) 1 TPC picture = 160bx! Select monitoring data for detector and machine experts Maybe store everything Data compression for 'uninteresting data' ?

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 some Questions Are cosmic data needed for calibration or Can we catch particles with long lifetimes (captured in ECAL) (power cycling reduces efficiency by 1/100) Fast feedback signals to machine (influencing detector FE ?) Identify relevant data from machine DAQ for physics analysis New technologies, ideas (NOW is the time for developments !!) Power and cooling (How much current draws a power cycle of the full system ?)

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 and even more Questions.... Detector control and monitoring with GDN ? (have remote monitoring and control in mind during design!) Is GRID an issue for the DAQ ? Where will the LCIO data formating be done ? At least the event filter software will use it (or similar).... Did we miss an important point ? Background, Noise, Redundancy,...

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Conclusion Central DAQ I Concept of software trigger seems feasible Have to develop detailed concept Some questions need answers soon, others can wait Need to proof concept rather soon  DAQ demonstrator

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Conclusion Central DAQ II The DAQ demonstrator needs : 'Complete' beam background simulation (or Datasets) Physics simulation (or Datasets) Detector simulation for the different design studies Software for event filter, monitoring, control A bit of hardware (PC farm and a switch) and people to work on 'Front end' to 'Central DAQ' interface (conceptual) Central DAQ Software architecture (Calibration, Filters, etc) Detector control and monitoring (including GDN) Offline data model (what do we want to store and how?)

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 If you are interested please join !

SLAC LCD Meeting, Jan 27 th 2005G. Eckerlin, DESY 1 Thank You !