CAL DQM 18-25 February 2004 Thomas Schörner-Sadenius DESY, 25 February 2004.

Slides:



Advertisements
Similar presentations
Year 10 ISA Controlled assessment Week starting March 4 th 2013.
Advertisements

1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
Arithmetic and Geometric Sequences
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
Random Numbers In today’s lesson we will look at: why we might want a random number whether they really are random how to create and scale random numbers.
Ain't It A Shame 1-4 Aint it a shame to work on Sunday, Aint it a shame, (a working shame,) Aint it a shame to work on Sunday, Aint it a shame, (a working.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
RECENT CAL PROBLEMS (including DQM person confusions) and DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 11 January 2005.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
ALGEBRA II – Week 1 ( Jan. 6 th – 10 th )  Monday – Non-student Day  Tuesday – Overview; Note sheet 1-17  Wednesday – Warm-up 1-4; Notes, Section 7-1;
Flight Traveling By Emily. Surabaya – Auckland Departure time: Monday, September 29 th at 3:00 a.m. Length of flight: 9 hours and 16 minutes Auckland.
ARISE Summer Institute UC Davis June 17-June 22, 2011.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Days of the week instructions. Children can; Order the days of the week. Use sentence strips and activity cards to write sentences about what they do on.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
CAL and SUBCOMPONENTS STATUS OVERVIEW T. Schörner-Sadenius Hamburg University, on behalf of the CAL group ZEUS Meeting DESY 28 February – 4 March 2005.
RUN COORDINATOR’S REPORT Thomas Schörner-Sadenius (UHH) On behalf of the run coordinators’ team: E. Gallo (left the team), J. Loizides, M. Turcato, R.
Saturation in V-calib LED scans CALICE AHCAL – Main Meeting 2010/07/05 Jaroslav Zalesak analysis still in progress but gives global results FNAL & CERN.
CAL OVERVIEW and DATA QUALITY REPORT T. Schörner-Sadenius Hamburg University ZEUS Meeting DESY 28 February – 4 March 2005.
Calibration of the ZEUS calorimeter for electrons Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration of the.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
When you go to the theatre to see a movie, your attendance and how much you paid to see the movie are entered into a database. Data are collected from.
CAL OVERVIEW and DATA QUALITY REPORT T. Schörner-Sadenius Hamburg University ZEUS Meeting Padova, October 2004.
CAL DQM REPORT T. Schörner-Sadenius Hamburg University CAL/HES Meeting, 4 January 2005.
RUN COORDINATOR’S REPORT 1-8 May 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 8 May 2006.
CAL CALIBRATION Overview and Stability Thomas Schörner-Sadenius Hamburg University ESCALE Meeting DESY, 7 June 2005.
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
CAL SHIFT MARCH 2004 Thomas Schörner-Sadenius Hamburg University CAL Meeting DESY 24 March 2004 Think carefully whether you consider being on shift.
Question of the Day! Week 18 5/22 – 5/26. Question of the Day! Monday, May 22nd Which type of cloud is easiest to spot and why?
DQM SHIFT TODO REMINDER T. Schörner-Sadenius Hamburg University CAL Meeting, 18 January 2005.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
7 th Grade Language Arts Monday, October 5, 2015 No DOL this week Harris and Me Begin writing assessment- “Seventh Grade” Must be submitted by Friday at.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Class Time Modules for the Semester Calendar Additional Senate Discussion
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
PeriodTimeMinutes 3 rd Period8:00 – 8: rd Period8:45 – 10:1590 Break10:15 – 10: th Period10:30 – 11: th Period11:10 – 12:4090 PeriodTimeMinutes.
Cal DQM Report 3/03/04 – 3/10/04. What was done March 3-4: Access March 5-6 : Machine studies.
Calibration of the ZEUS calorimeter for hadrons and jets Alex Tapper Imperial College, London for the ZEUS Collaboration Workshop on Energy Calibration.
River Heights Sports Board Welcome! The Sports Board is where you can find the practice and game times of all current sports offered by the Physical Education.
CAL DQM January 2004 Thomas Schörner-Sadenius DESY, 28 January 2004.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
The birthday calendar 2B : Unit 6 Days of the week Days of the week.
Energy Calibration of BESIII EMC  ‘Digi’-calibration Bhabha calibration  0 calibration Radiative Bhabha calibration  ‘Cluster’-calibration.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
Happy Days by Charles Fox and Norman Gimbel PowerPoint by Camille Page.
Daily Math Review September 2-6, Monday Solve the following problems with strategies and/or algorithms 5, = 9, = 3, =
8 th Grade Language Arts Monday, October 5, 2015 No DOL this week Far North Begin essay assessment- “Charles” Must be submitted by Friday at 9 P.M.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
My Plan to Go to Around the world By: Benedict/5C.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Andreas Horneffer for the LOFAR-CR Team
Preparation for CERN test beam
CAL DQM Report June 2nd – June 9th.
Power pulsing of AFTER in magnetic field
Experimental Particle Physics in UM Wan Ahmad Tajuddin Wan Abdullah
Cal DQM Report July 7 – July 14, 2004.
Malaysia in particle physics – particle physics in Malaysia
Current status Minjung Kim.
Cal DQM Report 11/26/03 – 12/03/03.
Presentation transcript:

CAL DQM February 2004 Thomas Schörner-Sadenius DESY, 25 February 2004

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20042 This CAL DQM Week …  … was actually very quiet  … showed only minor problems: 1.Thursday (?): Funny GFLT energy distributions; RunCo asked to check. Beams dumped soon afterwards  probably beam- induced and not indicating CAL problem. 2.Friday/Sunday: Called to ZEUS hall to take calibration run (CAL_QUICK_CALIB) because shift team was busy doing MVD calibration … (?) 3.Monday: Had to restart readout several times after interfering interventions of CFLT and shift leader. 4.Tuesday: Unhappy with FEC: Leaving with 0/1/2 holes.

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20043 Wednesday 18th Bad channel update QINJ 17116: 2/0/6 (1/0/0) UNO 17117:1/4/0 (1/1/0) PED 17118:3/0/0 (1/0/0)  calibration version 3411 with 282 bad channels, 0 holes FEC ec_ ec_  calibration version 3412 Trimming UNO Bad channel update QINJ 17129: UNO 17128: PED 17132:  calibration version 3413 (245 bad channels, 0 holes) UNO scale factor update FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20044 Friday 20th Bad channel update (CAL_QUICK_CALIB 48066) QINJ 1/0/0 UNO 3/9/0 PED 1/1/0  calibration version 3414 with 259 bad channels, 0 holes UNO scale factor update Bad channel update (CAL_QUICK_CALIB with cal version 3413!) QINJ 2/0/0 UNO 6/11/0 PED 1/0/0  calibration version 3415 with 268 bad channels, 0 holes UNO scale factor update FCAL BCAL RCAL Total FEC UNO Qinj PED Total FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20045 Friday 20 th ctd’ Bad channel update QINJ /6/0 UNO /1/0 PED /1/0  calibration version 3416 with 276 bad channels, 0 holes Auto_adc2volt ec_  adc-to-volt constants 2314 (1 bad channel BCAL) Bad channel update QINJ /2/2 UNO /101/22 (0/1/0) PED /8/2  calibration version 3417 with 252 bad channels, 1 hole BEMC2 m22 t4 Update UNO scale factors FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20046 Sunday 22nd Bad channel update QINJ /0/0 UNO /7/0 PED /0/0  calibration version 3418 with 260 bad channels, BEMC2 m22 hole Auto_adc2volt ec_  adc-to-volt constants 2315 Bad channel update QINJ /2/2 UNO /101/22 (0/1/0) PED /8/2  calibration version 3419 with 251 bad channels, 1 hole BEMC2 m22 t4 Update UNO scale factors FCAL BCAL RCAL Total FEC UNO Qinj PED Total FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20047 Monday 23rd Bad channel update QINJ /1/0 UNO /4/0 PED /0/0  calibration version 3420 with 259 bad channels, BEMC2 m22 hole Some checkout runs FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20048 Tuesday 24th Bad channel update (CAL_QUICK_CALIB 48176) QINJ 0/0/0 UNO 2/3/0 PED 0/0/0  calibration version 3421 with 264 bad channels, BEMC2 m22 hole Update UNO scale factors Bad channel update QINJ /0/0 UNO /3/0 PED /0/0  calibration version 3422 with 267 bad channels, BEMC2 m22 hole FEC ec_ ec_  FEC calibration version 3423 FCAL BCAL RCAL Total FEC UNO Qinj PED Total FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/20049 Tuesday 24 th ctd’ Trimming UNO runs – only short trimming, pressure from HERA. After trimming: 1 hole in BCAL (BEMC2 22/4) and two in RHAC module 21) Bad channel update QINJ /3/2 UNO /101/24 (0/1/2) PED /9/2  calibration version 3424 with 266 bad channels, 3 holes Update UNO scale factors FCAL BCAL RCAL Total FEC UNO Qinj PED Total

DESY, 25/02/2004TSS: CAL DQM 18-25/02/ Status I  Calibration version 3424 with 264 bad channels and 3 holes  should go for new full calibration asap.  DQMCOC checked until end of ep runs list (48031).  Zmon checking is far behind because ep runs list not updated (and I do not want to check runs which are not needed, and I would not like to override the script that makes the CAL DQM run list entries).  No major problems  … let’s look at some plots (not from newest calibration but nevertheless they may clarify a few points for us newcomers …

DESY, 25/02/2004TSS: CAL DQM 18-25/02/ Status II list of bad front end cards F7 FEC 16 with 12 used channels Ca Crt Crd Chn Poser Mod Tow Typ Sid Index FEC Ch Nbf Code Message f CE ( 8L) 1 6/6 46 Pipeline gain f CE ( 8L) 2 6/6 42 Pipeline gain spread f CE ( 8L) 3 6/6 42 Pipeline gain spread f CE ( 8L) 4 6/6 47 Buffer gain f CED ( 8L) 6 6/6 42 Pipeline gain spread f CEF ( 8L) 5 6/6 46 Pipeline gain f CF ( 8L) 9 6/6 42 Pipeline gain spread f CF ( 8L) 10 6/6 47 Buffer gain f CF ( 8L) 11 6/6 65 Nonlinearity f CF ( 8L) 12 6/6 46 Pipeline gain f CFD ( 8L) 8 6/6 42 Pipeline gain spread f CFF ( 8L) 7 6/6 42 Pipeline gain spread list of bad adc's/buffer chips RCAL transputer 7 digital card 13 ADC 4 with 6 used channels Ca Crt Crd Chn Poser Mod Tow Typ Sid Index FEC Ch Nbf Code Message r A86A ( 1L) 9 6/6 42 Pipeline gain spread r A86C ( 1L) 8 6/6 42 Pipeline gain spread r A87A ( 1L) 7 6/6 42 Pipeline gain spread r A87C ( 1L) 10 6/6 42 Pipeline gain spread r A88A ( 1L) 12 6/6 42 Pipeline gain spread r A88C ( 1L) 11 6/6 42 Pipeline gain spread

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200412

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200413

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200414

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200415

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200416

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200417

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200418

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200419

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200420

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200421

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200422

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200423

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200424

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200425

DESY, 25/02/2004TSS: CAL DQM 18-25/02/200426