25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.

Slides:



Advertisements
Similar presentations
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
1 GEM Tracker for high luminosity experiments at JLab Hall A Evaristo Cisbani (8), V. Bellini (5), M. Capogni (2), S. Colilli (8), R. De Leo (4), R. De.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
SBS Coll. Meeting - Front Tracker GEM
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
1 Tracking system based on GEM chambers Evaristo Cisbani Italian National Institute of Health and INFN Rome – Sanità Group PAVI – 09 / September.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
MPD HW & firmware status UVa Back Tracker parts status SBS JLAB 1 16 December 2015 Paolo Musico and Evaristo Cisbani GEM Readout Update.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Electronics for GEM R&D at the University of Virginia
Test Boards Design for LTDB
PRAD DAQ System Overview
Production Firmware - status Components TOTFED - status
Readout System of the CMS Pixel Detector
T1 Electronic status Conclusions Electronics Cards:
Status of the Front Tracker GEM
Front-end electronic system for large area photomultipliers readout
Design and Status of the SBS Front tracker
Example of DAQ Trigger issues for the SoLID experiment
Concepts and Status of the GEM trackers
The CMS Tracking Readout and Front End Driver Testing
SALTRO16 activities in Lund
The LHCb Front-end Electronics System Status and Future Development
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo Cisbani - INFN/Rome & Italian National Institute of Health On behalf of: Paolo Musico, Saverio Minutoli, Giuseppe Gariano - INFN/GE Bari 09/October/10 WG5-RD51 Collaboration Meeting

SBS Spectrometer in Hall A SiD Large luminosity Moderate acceptance Forward angles Reconfigurable detectors Large luminosity Moderate acceptance Forward angles Reconfigurable detectors 21 Set 2010 / CSN III JLab12 – - E. Cisbani 2 Electronics for: Small silicon detector (SiD) Front GEM tracker Large backward GEM trackers  >100k channels

Readout Foil 21 Set 2010 / CSN III JLab12 – - E. Cisbani 3 No soldering, very thin connections Laser cutting required

25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 4 Electronics Components GEM  FEC  ADC+VME Controller  DAQ Main features: Use analog readout APV25 chips 2 active components: Front-End card and VME64x custom module Copper cables between front-end and VME 2D Readout Thanks to Michael Böhmer and Igor Konorov from TUM for very productive discussions on the design of the APV25 based FrontEnd card 75 mm 49.5 mm 8 mm Up to 10m twisted, shielded copper cable

25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 5 Front End Card (Proto 1) GEM  FEC  ADC+VME Controller  DAQ Analog Output Panasonic FPC connectors Input Protection diodes APV25 bonding on PCB Voltage regulators Analog Driver Thermometer Digital IN Power Line I2C

25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 6 Front End Card (Proto 1) GEM  FEC  ADC+VME Controller  DAQ Analog Output Input Protection diodes Panasonic FPC connectors Analog driver (not used) Voltage rogulators Thermometer 2 In/Out options APV25 bonding on PCB Digital Input + Power supply Analog out + Digital Input + Power supply APV25

VME64x Controller (Proto 0)  VME controller hosts the digitization of the analog signals coming from the front-end card.  It handle all control signals required by the front end cards (up to 16 FE)  Compliant to the new JLab/12 VME64x VITA 41 (VXS) standard  We intend to make it accessible by standard VME as well  Modular design: with the possibility to easily detach the analog module to extend FEC- VME64x distance  Version 1 submitted for production From the VXS backplane: 1.Trigger L1/L2 2.Synch 3.Clock 4.Busy (OUT) (duplicated on front panel) Digital OUT 16 Analog IN Analog Receivers ADCs 50 MHz 12 bits USB ETH Optical Fiber 2x64Mbyte SDRAM Live Insertion Hot-Swap Oscillators (100 MHz, 62.5 MHz) Flash EPROM Thermometer Voltage Regulators for each module 21 Set 2010 / CSN III JLab12 – - E. Cisbani 7

25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 8 Electronic layout on one chamber Cards and modules are supported by an outer carbon-fiber frame which runs all around the chamber. Front-end cards are electromagnetically shielded by backplane and carbon-fiber (with thin conductive tape)

GEM Electronics Layout 21 Set 2010 / CSN III JLab12 – - E. Cisbani 9 1.Use high density, high quality, standard HDMI (A-type for digital signals, B-type for analogo output) 2.Analog and digital lines rus independently 3.Analog and Digital patch panels collects and reroute channels 4.Similar solution for the SiD planes

Beam DESY (EUDET support) 25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 10 4 front-end cards (proto 0) on a 10x10 2xGEM With 2D readout (a la COMPASS)

Evidence of the beam 25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 11 No BEAM Beam Relevant noise, partially suppressed by common noise subtractio Large pedestal fluctuation

Cable lenght study 21 Set 2010 / CSN III JLab12 – - E. Cisbani 12 Test new electronics Improve noise suppression Test cable length Test 2xGEM chamber

To do list Add PLL for fine clock-ADC convert phase tuning (already implemented in hardware in second version) Coherent event builder Use of external memory Median evaluation and common noise subtraction on FPGA Zero suppression 25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 13

25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 14 Conclusions Front-end card prototype 1: tested, can be considered final version VME-controller prototype 0: –Bug fixed –Most of the basic firmware implemented –New version under production Expect to install in GEM module (40x50cm2) in November – test end of November