Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin 7:00 p.m., March 13, 2013 Aberdeen.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin 7:00 p.m., March 6, 2013 City of Cosmopolis.
Jon Keeling, PE, CFM Carey Johnson, CFM ASFPM 2012 Conference May 22, 2012 The Mission of Dam Safety Hazard Mitigation – Kentucky’s Experience.
Watershed – Level Regional Flood Risk Management Team: Collaborative Risk Reduction Bruce A. Munholand P.E., PMP.
Chehalis River Basin Flood District Formation November 18, 2010 Chehalis River Basin Flood District Formation 1.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Chehalis River Basin Overview of Work Program and Issues September 25, 2013 Aberdeen Rotary Club 12:00 Noon.
Chehalis River Basin Flood Entity Formation Public Meeting Swede Hall, Rochester – October 14,
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
PRESENTATION SUMMARY Introduction – Living with the Red Introduction Introduction – Overview (Mike Ryan) Geography Geography – Living with the Red (M.
Chehalis River Basin Overview of Work Program and Issues July 24, 2013 WA State Department of Ecology.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
Chehalis River Basin Flood Entity Formation Public Meeting Centralia Middle School, Centralia – October 28,
U. S. Army Corps of Engineers Philadelphia District How to start the Corps’ Project Delivery Engine Local Sponsor Identifies A Problem and Requests Corps.
Chehalis River Basin Flood District Formation February 17, 2010.
Chehalis River Basin Flood Entity Formation Public Meeting City Hall, Montesano – October 18,
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Unit 1 Community Capabilities
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Actions and Activities Benefiting the Basin February 2013
Louisiana’s 2012 Comprehensive Master Plan for a Sustainable Coast Path Forward on Nonstructural Program Implementation CPRA Meeting - October 17, 2012.
HAZARD MITIGATION 101 Sandusky County Initial Planning Meeting March 11, 2014.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Oconee County Hazard Mitigation Plan Update Kickoff Meeting Brian Laughlin Hazard Mitigation Planner Georgia Emergency.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
1 The Delta Plan The Delta Plan Presentation to San Joaquin County Dan Ray Delta Stewardship Council June 19, 2012.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
Flood Authority Meeting November 1, Agenda Discuss Background Materials for Governor Recommendations Miscellaneous – EWS URL; EWS Training Next.
Lake County Watershed Management Board Funding Program Mike Prusila, CFM, Watershed Planner.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
1 Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee Actions and Activities Benefiting the Basin 3:00 p.m., July 8, 2013.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin February 2013.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Central Valley Flood Protection Board Meeting – Agenda Item No. 7D Methylmercury Open Water Workplan.
Federal Interagency Floodplain Management Task Force.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
Project Subcommittee Subcommittee Purpose/Goals: – Develop a master inventory of flood-related projects in the Chehalis Basin Seven sets of discussions:
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
District Type and Issues Identification Chehalis River Basin Flood Authority Entity Formation July 15, 2010.
The EU Floods directive -Implementation in Sweden.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
 Welcome/Introductions  Overview of the Plan  Updates on Information Requests  Plan Discussion  Hazards/Gaps/Actions/Priorities  Next Steps.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
2017 HAMPTON ROADS HAZARD MITIGATION PLAN UPDATE BRIEFING
Mahoning County Informational Meeting USACE Programs, Authorities, and Ohio Silver Jackets Program Presented by: Ashley Stephens 16 August 2016.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Silver Jackets Orientation
City of Kingfisher: Using Historic Flooding to Quantify Damages
Local Hazard Mitigation Planning & Disaster Preparedness
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Agricultural Land & Avian Foraging Habitat Mitigation Fee
Sacramento Environmental Commission January 2019.
Presentation transcript:

Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis

What is the Chehalis River Basin Flood Authority? Authorized by the Washington State Legislature Spring 2008 Established by intergovernmental agreement among the member governments Established to “develop or participate in the development of flood hazard mitigation measures throughout the basin”

Who are the Flood Authority Members? Grays Harbor County Lewis County Thurston County Confederated Tribes of the Chehalis City of Aberdeen City of Centralia City of Chehalis City of Montesano City of Oakville Town of Bucoda Town of Pe Ell

What has the Flood Authority Accomplished? Funding studies to aid development of solutions to flood problems: –Evaluating upstream storage facilities –Developing a LiDAR digital elevation model for the basin –Developing a hydraulic model for the lower basin –Conducting an economic analysis to value flood protection and ecosystem services

What has the Flood Authority Accomplished? Evaluated floodplain regulations in the basin Funded an assessment of flood warning systems in the basin Coordinating with Corps projects Considering options for establishing a Flood District for future project funding Developing a Draft Comprehensive Flood Hazard Management Plan

What are the Future Plans of the Flood Authority? Continue to fund existing projects and studies Fund the development of an Early Warning System Adopt the Draft Comprehensive Flood Hazard Management Plan Form a Flood District for future funding of flood projects

What is a Comprehensive Flood Hazard Management Plan? An examination of the cause and effect of flood related problems leading to the development and implementation of feasible solutions Focuses on managing the hazards associated with flooding Considers both non-structural and structural alternatives

Why did the Flood Authority Develop a Flood Plan? Provide a basin-wide evaluation of flood problem areas and potential projects to address the problems Develop basin-wide goals for addressing flood problems Develop basin-wide criteria for evaluating future projects Identify a range of projects to address flood problems in various areas of the basin Identify strategies for funding future projects and establishing a flood district

Based on Flood Plans prepared by member jurisdictions Solicited information from: –Flood Authority members and jurisdictions –Public involvement –Agency coordination How was the Flood Plan Developed?

What is in the Flood Plan? Goals Basin characteristics Previous studies Regulatory overview Basin flood characteristics Flood problem areas Mitigation alternatives Funding options Recommended actions

What are the Flood Problem Areas?

What Types of Mitigation Actions are Recommended? Non-structural Measures –Public information Provide educational materials such as flood proofing guidance –Regulation Improve floodplain regulations, develop floodplain conservation easement programs –Planning and data collection Improve hydraulic modeling, study woody debris and stream gravels –Reduce damage to existing structures Develop home elevation and buyout programs –Emergency response and preparedness Develop early warning system –Natural resource protection projects Protect and restore riparian areas

What Types of Mitigation Actions are Recommended? Structural Measures –Floodplain protection Twin Cities levees, PUD storage facilities –Bank protection Bank stabilization and protection –Conveyance capacity Widen or deepen channels, open channel migration zone

How will the Flood Plan be Used? Provides a project start list for a Flood District Recommended actions can be incorporated into the Corps General Investigation Feasibility Study Flood Plan meets federal and state guidelines; therefore, projects could be eligible for federal and state funding

What Are the Next Steps? Public comments will be incorporated into a revised Flood Plan Flood Authority plans to adopt the Flood Plan in June Flood Authority will recommend that member jurisdictions adopt the Flood Plan as part of their individual plans and as part of the Flood District formation process

What Can You Provide? Comments on the Flood Plan Specific comments about: –Flood problem areas –Recommended actions

Open question and comment period Listening posts Comment forms Questions and Comments?

Contact Information basin-flood-authority