Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: www.cern.ch/r2e RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.

Slides:



Advertisements
Similar presentations
5 th LHC Radiation Day Radiation response of RADMON sensors T. Wijnands (TS/LEA), C. Pignard (TS/LEA) Acknowledgements : UCL Louvain-La-Neuve, PSI Villingen,
Advertisements

Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Abstract: Based on the principle of the RADMON on line radiation monitoring system for the LHC, a new type of low cost, battery powered radiation monitors.
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
1 Integrating Radiation Monitoring System for the ATLAS Detector at the Large Hadron Collider Igor Mandić 1, Vladimir Cindro 1, Gregor Kramberger 1 and.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Online Radiation Dose Measurement System for ATLAS experiment I. Mandić a, representing ATLAS collaboration a Jožef Stefan Institute, Jamova 39, Ljubljana,
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
RADMON 15-Feb-071 RPL dosimeter at CERN M. Fuerstner +, I. Brunner +, F. Jaquenod ‡, N. Liaudet ‡, S. Pernecker ‡, M. Tognolini ‡, G. Triscone ‡, H. Vincke.
Online Radiation Dose Measurement System for ATLAS experiment I. Mandić a, V. Cindro a, I. Dolenc a, A. Gorišek a, G. Kramberger a, M. Mikuž a,b, J. Hartert.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
5th LHC Radiation Day, Passive dosimetry at the LHC 1 D. Forkel-Wirth, M. Fuerstner, F. Jaquenod, M. Silari and H. Vincke CERN Radiation Protection.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)
Institute for Nuclear Research and Nuclear Energy Dimitrov L.P., Iaydjiev P.S., Mitev G.M., Vankov I.V.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
Slide 1 5th LHC RADIATION WORKSHOP, CERN, , Jochen Kuhnhenn, Fraunhofer INT Radiation tolerant fibres for LHC controls and communications.
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
PHYSICS 225, 2 ND YEAR LAB NUCLEAR RADIATION DETECTORS G.F. West Thurs, Jan. 19.
Thermoluminescent dosimetry at the IFJ Krakow P. Bilski, B. Obryk INSTITUTE OF NUCLEAR PHYSICS (IFJ), KRAKÓW, POLAND RADMON, 15 February 2006.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
CERN Converter Control Electronics Setting the Scene
Goal: in view of LS2/LS3/HL-LHC – evaluate possible life-time constraints in IR3/7 radiation levels equipment damage and respective lifetime considerations.
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
Polycrystalline CVD Diamonds for the Beam Calorimeter of the ILC C.Grah ILC ECFA 2006 Valencia, 9 th November 2006.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Status of n_TOF Facility
Radiation Tests on optical fibres for the LHC machine T. Wijnands, D. Ricci CERN EN department Fraunhofer INT.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
The 14 MeV Frascati Neutron Generator (FNG)
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
New Irradiation Test Facility : CHARM June 10 th 2014 CERN R2E project CHARM Introduction June 10 th 2014 New CERN Irradiation facility : CHARM !!! Many.
Planning and strategy for HL-LHC R2E
Matters arising RADWG - 3 July 2009
CHARM facility update 23/04/2015
Project lead by Fusion For Energy (F4E)
Isidre Mateu Suau (EP-DT-DD)
Cryo equipment strategy in the R2E context
Next generation rad-hard links
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
Material irradiation tests meeting R2M, a spin-off from R2E
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
FRAUNHOFER Update on Test-Campaigns
Dosimeters installation during the EYETS 28/03/17
Update on the Ethernet Network Installation Campaign
Irradiation Facilities Questionnaire
C100 Activation Status and Projections JLab Ops Staytreat 2016
Radiation Monitoring in LHC Experiments
Benoît Brichard Instrumentation Department Tel: Secr: Fax: Ooms Hans
Radiation tolerant fibres for LHC controls and communications
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger for the R2E Project

Fraunhofer Test-Campaigns March 25 th 2013 Overview 2 Fraunhofer test facilities Blanket contract Typicial test ‘life-cycle’ On-going tests & Cost Example Tests in pipeline

Fraunhofer Test-Campaigns March 25 th Co-60 gamma sources MDS Nordion GammaMat TK1000 A/B MDS Nordion GammaMat TK100 X-ray sources Febetron 705 (pulsed) Comet MXR-451 (continuous) Neutron generators Thermo Electron D-711 EADS Sodern Genie 16C Pulsed laser SEE test system Lumera STACCATO CryLas DSS1064-Q1 Sun simulator Oriel LS0911 External facilities Proton-irradiation at FZ Jülich Relativistic heavy ions at GSI Darmstadt (currently limited availability) External Co-60 sources Test Facilities

Fraunhofer Test-Campaigns March 25 th 2013 Fraunhofer Test-Campaigns March 25 th Test Facilities

Fraunhofer Test-Campaigns March 25 th 2013 Co-60 Source (TID Tests) 5 Typical activity: 2×10 13 Bq (500 Ci) Maximum dose rate: ~3 Gy/s (300 rad/s) Maximum dose (very small samples): 1 MGy (100 Mrad) in 4-6 days Temperature range: -55°C to +150°C Dosimetry: Calibrated ionisation chambers and TLDs (LiF) Large test volume (~1 m³)

Fraunhofer Test-Campaigns March 25 th Bunker layout with cable feeds, remote control to test equipment possible, etc,… Whole irradiation chamber thermally stabilized  0.2°C Larger test volume resulting in large variation of dose rate Exclusive concrete bunker without interference with other irradiations Measurement equipment close in precision climate chamber Co-60 Source (TID Tests)

Fraunhofer Test-Campaigns March 25 th Co-60 High-Dose Tests (passive) BGS (Wiehl) close to Fraunhofer Goal: tests in the MGy range (& large volume) Only passive radiation tests possible (some possibilities for ‘small’ samples)

Fraunhofer Test-Campaigns March 25 th 2013 Neutron Generator (DD Tests) 8 Neutron generation via fusion reaction T(d,n) 4 He E n  14 MeV D(d,n) 3 He E n  2.6 MeV 14 MeV:Source particles < 4 × n/s in 4  Fluence of n/cm 2 after several hours 2.5 MeV:About a factor of 100 less 14 MeV–n in Si are twice effective as 1 MeV–n Fluence and dose measured with activation foils and fission chambers

Fraunhofer Test-Campaigns March 25 th 2013 Blanket Contract 9 Demand for radiation test campaigns (TID, DD) is steadily increasing Time and man-power constraints are a frequent issue for equipment groups Individual contracts are lengthy and total volume exceeds 200kCHF/y envelope Proposal of blanket contract with Fraunhofer (maximum volume of 700kEUR/3y) accepted by Finance Committee (March 2013) Contract in iteration with Fraunhofer on-going

Fraunhofer Test-Campaigns March 25 th 2013 Test ‘Life-Cycle’ 10 Expected Radiation Environment (levels, spectra, etc.) Component- Equipment Selection Definition of Test Requirements In-House? External Facility? Outsourced? Test Specification Document Setup & Test Campaign Analysis & Reporting Acceptance for CERN Application Additional Test Requirements?

Fraunhofer Test-Campaigns March 25 th 2013 Past and Currently On-Going Tests 11 Qualification tests of optical fibers (production testing) [EN/EL] RadFet calibration campaign [EN/STI] Currently two combined campaigns (active + passive) Aim: combine as many tests as possible New contract: will bring costs further down ensure the availability of the facilities and Fraunhofer

Fraunhofer Test-Campaigns March 25 th 2013 Upcoming Campaigns 12  RadFET additional measurements under biased conditions [EN/STI] (G. Spiezia)  RadMon components, e.g. ADC (full box) [EN/STI] (G. Spiezia)  LED safety lights up to some 100kGy (active or passive) [EN/EL] (J.M. Foray)  IT/Fire Beacons up to 100kGy (ideally active) [IT/CS] (A. Pascal, A.G. Molero)  Fire detection/alarm system: diode active, functional test on switch [GS/ASE] (M. Dole)  Polymers & Resin samples to high doses (10MGy), partly under cryogenic conditions [TE/MSC] - Insulation samples + Cryo (E. Fornasiere)  Flexible pipes (passive up to some MGy) [TE/MSC] Magnet hoases/feeds (D. Schoerling)  Small components for collimation (motors, switches) -> Passive to several MGy [EN/STI] (A. Masi)  LT1084 regulator active measurement up to ~1kGy [TE/MPE] (R. Denz, J. Steckert)  Components used for new power converter design (several ) up to few hundred Gy (to be decided if active or passive) [TE/EPC] (Y. Thurel, A. Dinius, S. Uznanski)  Survey equipment (passive only) -> for cable MGy to be clarified, additional: motor/gearbox optional [BE/MPE] (M. Sosin)  Humidity sensor: [EN/CV] (R. D. Ecclestone)  labeling verification -> interested? [EN/EL] (C. Crommelinck)  components interesting for EAirrad [EN/STI] (J. Mekki, M. Brugger)  possible requirement for BPM components for xCheck – analysis ongoing [BE/BI] (G.J. Focker)  vacuum instrumentation – if cross-check on ‘new’ equipment is required [TE/VSC] (G. Pigny)  RF equipment– to be discussed in context of JPARC tests [BE/RF] (M. Paoluzzi)

Fraunhofer Test-Campaigns March 25 th 2013 Upcoming Campaigns 13 First specification documents received Iteration on few points required Missing ones get ‘urgent’ Will create dedicated website (sub-site of RadWG) Trip to Fraunhofer scheduled for April 10 th (input before!)