Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau.

Slides:



Advertisements
Similar presentations
Sources of Nonpoint Source Water Pollution in forestry and silviculture: - Timber harvesting - Roads - Wildfire - Recreation.
Advertisements

Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: January 2013.
Airport planning.
Emergency Action Plans
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Energy Management Trees Work for. 1. Why do we plant trees? Add Beauty – Spring flowers, fall foliage color, interesting bark, fragrance – Screen unwanted.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management June 2007.
Reclamation Planning for Energy Development Projects: Wamsutter, WY; A Case Study C. Driessen, B. Teson, D. Marshall, R. Antsotegui June 3, 2013.
Reduce Unnecessary Disturbance Part 3 U.S. Department of the Interior Bureau of Land Management November 2006.
U.S. Department of the Interior Bureau of Land Management Wildlife Management November 2006.
Using Land Capability Classifications
Oil and Gas Leasing Jim Albano – Lead Natural Resource Specialist Reservoir Management and Operations Section Montana State Office – (406)
Page 1 Copyright © ALL Consulting, All Rights Reserved January 3, 2003ALL Consulting Overview of Coal Bed Natural Gas Best Practices and Mitigation.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Final Reclamation Part 5 U.S. Department of the Interior Bureau of Land Management May 2006.
Environmental Management Plan. Background Environmental Impact Assessment has made commitments to: –Meet defined standards –Implement defined mitigation.
1 Course Highlights –Introduction –Planning for Erosion and Sediment Control –Erosion Control BMP Implementation –Sediment Control BMP Implementation –Class.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Safety Audit Components Safety assessment for risk Management.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
Choice of Color Part 4 U.S. Department of the Interior Bureau of Land Management May 2006.
Understanding Agronomy. Irrigation Objectives  Describe the benefits of irrigation; Describe the benefits of irrigation;  Identify ways to determine.
Master Development Plans (MDPs) Oil and Gas Projects.
Most Common Conservation Practices Forestry Illinois.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Module 7: Construction Phase
Production Operations U.S. Department of the Interior Bureau of Land Management November 2006.
Seasonal High Tunnel Systems for Crops Interim Standard 798 Technical and Program Guidance National bulletin: National Bulletin: Idaho.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Land Management Framework Project Objective 2 Overview November 22, 2006.
Implementing Conservation Measures to Reduce Impacts to Migratory Birds.
SFS Best Practices Presentation Key “Best Practice” Drivers for the Crop Sector 1.Reduce Nutrient, Sediment and Herbicide Runoff 1.Riparian buffer strips,
Proper Site Selection Part 2 U.S. Department of the Interior Bureau of Land Management May 2006.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
1 Best Management Practices Planning, Leasing, Permitting Jamie Connell BLM Northwest Colorado District Manager District Manager.
Rangeland Management Before, During, and After Drought Larry D. Howery Rangeland & Forest Resources Program School of Renewable Natural Resources The University.
Soil conservation practices Contents Soil conservation practices Soil conservation practices Crop rotation Crop rotation Wind break Wind break Cover.
Lecture 2. Agricultural Pollution Control in the Baltic Sea with Special Emphasis on Manure Management Prepared by Assoc. Prof. Philip Chiverton, SLU and.
Tundra. Climate In the Tundra, the winter temperature averages about -30F In the summer, the average temperature is close to 45F.
Lynne Welsh Massachusetts Department of Environmental Protection.
PIPELINE RECLAMATION REQUIREMENTS Interim reclamation: Achieve healthy biologically active topsoil, control erosion, and restore habitat. Final reclamation:
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
Soil Cultivation and Tillage. What is Tillage? The practice of keeping the soil mellow (soft) and free from weeds mechanically (physically). The practice.
Horticulture II - Landscape UNIT C LANDSCAPE INSTALLATION AND MAINTENANCE.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
BOARD OF OIL, GAS, AND MINING DEPARTMENT OF NATURAL RESOURCES STATE OF UTAH BEFORE THE BOARD: RECLAMATION OF SURFACE DISTURBANCE DIVERSIFIED STONE PRODUCTS.
Introduction Part 1 U.S. Department of the Interior Bureau of Land Management May 2006.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
Preventing Slips, Trips, & Falls
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
U.S. Department of the Interior Bureau of Land Management Wildlife Management Updated: April 2009.
WIND ERROSION. Wind Errosion HASEEB ZAHID Mahies 2008-ag-1708 Semester: 7 th Dept:AGRONOMY.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
Sustainable Agriculture Practices. Conventional tillage  incorporates most of the previous crop’s residue into the ground  leaves the surface exposed.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
Soil Erosion. Objective 1: Explain soil erosion.  What is soil erosion?  I. Soil erosion is the process by which soil is moved.  As soil is eroded,
MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.
Interdisciplinary teams Existing or new roadway
Erosion • outline a cause of soil erosion in  NSW due to: – an agricultural process – urbanisation and identify a management strategy that prevents or.
Prairie Restorations, Inc.
Construction Management & Inspection
CR-GR-HSE-419 Safety of excavation works
Presentation transcript:

Best Management Practice Information Sheets Updated: August 30, 2004 Contact: U.S. Department of the Interior Bureau of Land Management

Best Management Practices (BMPs) Information Sheets The following BMP Information Sheets provide additional guidance on the proper application of BMPs for Fluid Minerals operations. BMPs should be adapted to meet the needs of the site-specific situation. When selecting the appropriate BMP, or its degree of use, consider the least restriction that would accomplish the same resource protection objective. Also, consider the cost of the BMP relative to the value of the resources to be protected. BMP Information Sheets will be added and updated as new information is developed. Field Offices and Operators are encouraged to provide additional technical information and photos to the BLM Washington Office addressing the applicability, limitations, effectiveness, maintenance, monitoring, and cost of the BMPs included within this document. ( or

BMP Index Interim Reclamation of Well Locations and Access Roads. Painting Production Facilities to Minimize Contrast with the Background. Design and construct energy service roads to a safe and appropriate standard, no higher than necessary to accommodate their intended use. Final Reclamation of Well Locations, Roads, and pipelines.

Goal: To minimize long-term loss of habitat, forage, visual resources, soils, and to prevent the introduction of invasive species. Description: Recontour (reshape) all portions of the well location that are no longer needed for future production operations. Recontouring restores the well location back to the original contour or a contour that blends with the surrounding topography leaving only the minimum unrecontoured area necessary for future workover operations and oil, gas, water, or condensate loadout. Salvaged topsoil is respread over the entire well location as soon as practical; except in the very minor areas the operator determines must be surfaced to accommodate year-round traffic. All portions of the well location, excluding surfaced areas, are then revegetated (native plant species are preferred) subject to the exceptions identified below. Re-topsoil and revegetate access road cut & fill slopes, backslopes and road shoulders, and borrow ditches. Also, consider revegetating the travel surface of surfaced roads and turnarounds, where practical. With low traffic roads, this will result in a hardpan, two-track road that is stable and requires less maintenance. BMP: Interim Reclamation of Well Locations and Access Roads

Exceptions: To ensure continued energy production operations, the operator must be allowed to drive, park, and set up future workover and maintenance operations on any newly revegetated areas. Where there is a moderate to high risk of wildfire, a small buffer area may be left around production facilities or grass may be mowed prior to workover setup. Where future wells are anticipated to be drilled from the same well location within a year or two, approval to delay interim reclamation may be granted. At final reclamation, all portions of the well location not previously recontoured to the original contour or a contour which blends with the surrounding topography must be stripped of topsoil and vegetation, recontoured, re-topsoiled, and revegetated. Interim Reclamation of Well Locations and Access Roads View of a well pad which has undergone interim reclamation, and over time, the native sagebrush vegetation has recolonized the disturbed area.

Interim Reclamation of Well Locations and Access Roads View of well pad that has been reshaped, topsoiled, and revegetated. Production tanks have been moved offsite. View of a road which has undergone interim reclamation of the borrow ditches and portions of the road surface.

BMP: Painting Production Facilities to Minimize Contrast with the Background. Goal: To minimize visual contrast by making production facilities less noticeable. Description: Paint above ground production facilities (pumping units, pipes, compressors, tanks, treaters, etc.) a color(s) which allows the facility to blend into the background. All new equipment brought onto the site should be painted the same color(s). Use the following considerations when selecting a color and shade: 1. Semi-gloss paints will stain and fade less than flat paints. 2. The background is typically a vegetated background and seldom a solid soil background. 3. The selected color should be one or two shades darker than the background. 4. Consider the predominant season of public use, but never paint an object to match snow.

Exceptions: The operator may need to paint drill rig anchors and those minor working tips and edges of production facilities that are subject to OSHA safety requirements a red, yellow, or orange color. The operator should not be required to paint wooden, distribution power poles; and electrical lines. To minimize contrast, operators should avoid lighter colors, such as desert tan or brown, white doors or roofs, galvanized silver electrical boxes and guardrails, signs with white backgrounds, etc. Painting Production Facilities to Minimize Contrast with the Background Pumping unit painted “Beetle”, a dark green, to help it blend with the background vegetation.

Painting Production Facilities to Minimize Contrast with the Background Vegetation colors are used, rather than soils colors.

BMP: Design and construct energy service roads to a safe and appropriate standard, no higher than necessary to accommodate their intended use. Goal: To minimize long-term loss of habitat, vegetation, soil, visual resources. Description: All roads should be designed and constructed to the appropriate standard, no higher than necessary to adequately accommodate their intended functions. Design, construction, and maintenance activities should be consistent with national policies for safety and resource protection. Consider the anticipated average daily traffic, vehicle loads, anticipated vehicle speeds, potential for use by the public, soil types, time of year use will occur, topography, etc. In some cases, overland travel within a defined corridor or via two-track roads during dry conditions is preferable to construction of all-weather access roads. Overland travel or two-track roads may be appropriate for exploratory wells or wells where year-round access needs have been reduced due to the use of other BMPs, such as remote monitoring and flowlines to offsite production facilities. Where practical, roads should follow the contours of the land to minimize cuts & fills and visually obtrusive lines in the landscape.

Exceptions: Overland or two-track roads may not be suitable for use in certain soil types or during saturated soil conditions. Consider the balance between economic, visual, and wildlife benefits vs. the potential for resource damage if the road is used inappropriately. However, also consider the guaranteed loss of resource values caused by the construction of a wide, crowned and ditched road vs. the chance that a primitive road may have a few muddy spots.

View of two-track roads to drilling operations. If the wells are dryholes, reclamation needs are minimal. If the well is a producer, the road can be upgraded, if necessary. This technique minimizes loss of vegetation. Note that neither roads are linear (straight line). They follow the natural contour of the land, eliminating the need for cut and fill. Also, your visual focus on the road does not direct your attention down a linear path straight to the well.

View of a two-track road containing buried power and flowlines. Note the vegetation regrowth and lack of vehicle traffic due to remote monitoring of the well and flowlines to production facilities located off site. Design and construct energy service roads to a safe and appropriate standard, no higher than necessary to accommodate their intended use.

BMP: Final Reclamation of Well Locations, Roads, and Pipelines Goal: To restore the landform, vegetation, habitat, soil, and visual resources. Description: Recontour all disturbed areas, including access roads, to the original contour or a contour which blends with the surrounding landform. Even if areas are growing adequate vegetation, do not hesitate to strip topsoil from all areas that have not been previously recontoured. Respread topsoil to a uniform depth across all disturbed areas. Leave a slightly rough surface if broadcast seeding onto the surface or a smoother surface if broadcast seeding into dozer track marks or if drill seeding. Consider the use of a high phosphorous/low nitrogen fertilizer and a mulch for those sites subject to wind or water erosion. Revegetation may result in a color contrast over the short-term, but if you used native seed, the local native plants, including shrub species, can be expected to recolonize over time. Nearly all oil and gas roads should be reclaimed following abandonment of the producing wells. Ripping and seeding roads is usually not sufficient. Most roads need to be recontoured back to the original contour so that they blend back into the landscape. A good job of recontouring, site preparation, and seeding, will greatly reduce the visibility of the well site 3 to 20 years from abandonment.

Final Reclamation of Well Locations, Roads, and Pipelines It is recommended that dryhole markers be monumented below ground level. If you recontour the well pad to the original contour, respread topsoil, and seed with native species, you will have a more difficult time finding your reclaimed well locations over time.  Dryhole Marker  Dryhole Marker Two years after seeding. Several years after seeding Many years after seeding Different well locations.

Final Reclamation of Well Locations, Roads, and Pipelines BeforeAfter Road and pipeline locations recontoured back to the original contour.