Ch 1-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating.

Slides:



Advertisements
Similar presentations
Introduction to Operations Management
Advertisements

Entrepreneurship and Small Business Management
Besterfield: Quality Control, 8 th ed..© 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Supplier Partnership By Engr Mian Khurram.
Strategic Management & Strategic Competitiveness
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall Ch 8 -1 Chapter 8 Implementing Strategies: Marketing, Finance/Accounting, R&D, and.
Identify and Meet a Market Need
Developing a Business Mindset
Chapter OneCopyright 2009 Pearson Education, Inc. Publishing as Prentice Hall. 1 Chapter 1 Introduction.
Chapter 1 Preliminaries. ©2005 Pearson Education, Inc.Chapter 12 Introduction What are the key themes of microeconomics? What is a Market? What is the.
© 2007 Pearson Education O perations as a C ompetitive W eapon Chapter 1 YearExpected Demand Cash Flow 080,000($150,000) 190,000$90, ,000$150,000.
Accounting Information Systems: An Overview
1-2 Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter 1 The U.S. Business Environment.
Introduction to Hospitality, 6e
COURSE OVERVIEW COURSE REQUIREMENTS KNOWLEDGE AND SKILLS STUDENT EXPECTATIONS Global Business.
Chapter 2 the marketing plan Section 2.1 Marketing Planning
Chapter 2 the marketing plan Section 2.1 Marketing Planning
The U.S. Business Environment
Ch 11 IT-390Cost Estimating. 2 Cost Estimating Predictive process used to quantify cost and price and possibly resources –Goal: Minimize the uncertainty.
Ch 11-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
1-1Copyright 2000 Prentice Hall Chapter 1 Welcome to the World of Marketing.
© 2016 Pearson Education, Inc.
Entrepreneurship: Ideas in Action 5e © 2011 Cengage Learning. All rights reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
Copyright © 2015 Pearson Education, Inc., All Rights Reserved Flexible Budgets, Direct-Cost Variances, and Management Control.
7-1 International Strategies Chapter 7 Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall.
Ch 3-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
1 Unit 1 Information for management. 2 Introduction Decision-making is the primary role of the management function. The manager’s decision will depend.
Chapter 1 Accounting Information Systems: An Overview Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 1-1.
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Chapter 2 the marketing plan Section 2.1 Marketing Planning
Introduction to Materials Management
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Copyright © 2015 Pearson Education, Inc. 1-1 # The U.S. Business Environment 1.
Pricing Strategies Chapter 10.
Arben Asllani University of Tennessee at Chattanooga Prescriptive Analytics CHAPTER 8 Marketing Analytics with Linear Programming Business Analytics with.
Ch 6-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Copyright 2004 Prentice Hall 1 Organizational Theory, Design, and Change Text and Cases Fourth Edition Gareth R. Jones.
Ch 9-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
14-1 Copyright © 2012 Pearson Prentice Hall. All rights reserved. C H A P T E R 14 The Federal Reserve and Monetary Policy Copyright © 2012 Pearson Prentice.
Chapter 5 Initiating and Planning Systems Development Projects Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph.
Introduction to Hospitality, Fourth Edition John Walker ©2006 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Chapter 15 Hospitality.
Concepts in Enterprise Resource Planning Fourth Edition
Standard Costs: Direct Labor and Materials
McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
Ch 5-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Ch 8-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Ch 2-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Copyright 2010, The World Bank Group. All Rights Reserved. Producer prices, part 1 Introduction Business Statistics and Registers 1.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
© 2012 Pearson Prentice Hall. All rights reserved. Using Costs in Decision Making Chapter 3.
2.13 The Balance of Payments on Current Account Why do countries trade with each other?
Diamond: Fashion Retailing: A Multi-Channel Approach. (C) 2006 Pearson Education, Upper Saddle River, NJ All Rights Reserved Chapter 5: Classifications.
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Chapter 2.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 1-1 Organizational Theory, Design, and Change Sixth Edition Gareth R. Jones Chapter.
Introduction to Operations Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Introduction to Business Chapter 3 Economic Roles Essential Question: What is our role in the economy?
Entrepreneurship & the Economy
Market Analysis and Target Market
Enterprise Resource Planning, 1st Edition by Mary Sumner
Chapter 3: Cost Estimation Techniques
Identify and Meet a Market Need
Chapter 1 Preliminaries.
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Enterprise Resource Planning, 1st Edition by Mary Sumner
Introduction to Operations Management
Chapter 1 Preliminaries.
Presentation transcript:

Ch 1-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Cost Analysis and Estimating for Engineering and Management Chapter 1 Importance

Ch 1-2 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Overview l The Design Process l Economic Evaluations  Users  Results  Reasons l Business Strategies l Information l International Business

Ch 1-3 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Reasons for Study l The Goal of Business Is to Make Money l Desire to Know Outcome Before Making a Commitment l Need for Cost and Price Estimates

Ch 1-4 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Design l Every Design Is a New Combination of Pre-Existing Knowledge that Satisfies an Economic Want  New Combination – Creativity  Economic Want – Driver

Ch 1-5 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Elements of Design l Identification and Definition of Problem l Development of Concepts l Engineering Models l Evaluation l Design l Implementation

Ch 1-6 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Engineering Design Process

Ch 1-7 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Problem l Recognize a Need  Economic Want l Good Description = Good Solution l Detailed Specification of Requirements

Ch 1-8 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Concept l New Combinations of Existing Knowledge l Need to Collect a Lot of Knowledge  Relative to the Problem l Unrestricted Generation of Concepts l Then Select and Refine

Ch 1-9 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Engineering Models l Representation to Explain an Aspect l Prediction l Discover Pertinent Parameters l Flexibility l Simplistic

Ch 1-10 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Evaluation l Compromise l Iterative Process with Modeling l Satisfies Requirements? l Cost l Profit l Fit with Capabilities

Ch 1-11 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Sources of Cost l Largely Determined by Design l 50% Purchased Material / Parts l 30% Overhead l 15% Factory Labor

Ch 1-12 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Design l Addresses All Requirements through  Computing  Drafting  Checking l Answers  What It Looks Like  How Shall It Be Built  How Will It Work

Ch 1-13 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Implementation l Requires a Decision to Proceed l Must Be Assured:  It Satisfies All Requirements  It Will Yield a Profit l Needs an Economic Evaluation

Ch 1-14 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Economic Evaluation l Market Defines “Economic Want” l Cost Needs to Satisfy l Cost Model Should Parallel the Design l Detail and Accuracy of Estimate  Depends on Amount of Info Available  Depends on the Time for the Estimate

Ch 1-15 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Users l Economic Evaluation Produces:  Dollar Estimates  Labor Hour Estimates  Material Requirements l Used By:  Engineering–Manufacturing  Marketing–Materials Mgmt.  Accounting/Financial Planning

Ch 1-16 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Results from Economic Evaluation l Requires Answers to 2 Questions  “What Does It Look Like?”  “How Many?” l Selects from Design Alternatives l Determines Manufacturing Methods l Decisions to Proceed

Ch 1-17 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Other Reasons l Cost to Manufacture l Profit Prediction l Labor Requirements l Time (Scheduling) l Control of Operations l Improvement l Budgets l Equipment Justification

Ch 1-18 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Strategies l Mass Production  Large Quantities / Little Variation l Batch Production  Smaller Quantities / Large Variation  Similar Processes l Projects  Very Small Quantities / Specialized

Ch 1-19 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Strategies

Ch 1-20 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management What Determines Cost and When

Ch 1-21 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Modes of Competition l Design Uniqueness or Superiority l Price and Cost l Quality l Reliability l Innovation / First to Market l Customer Support l Custom Design / Manufacturing l Commodity Products

Ch 1-22 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Business Classification l Traditional Established Products Slow Evolution Incremental Changes History of Costs l High-Tech Rapid Changes Short Cost Recovery Period Fast Time to Market Flexibility Concurrent Engineering Challenging Cost Analysis

Ch 1-23 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Information l Available Information Varies  By Point in the Development  Amount of Uniqueness of Product l Historical Data (Accounting Records) l Measured Data l Policy Data

Ch 1-24 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Sources of Information l Accounting l Personnel Department l Operating Departments l Purchasing l Sales/Marketing l Supervisors/Managers l Trade Associations / Media

Ch 1-25 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management About the Estimate l Amount of Information Available l Time Allotted to Make the Estimate l Overall Size (Amount) of the Estimate l Intended Use for the Estimate l All Impact the Quality and Accuracy of the Estimate

Ch 1-26 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management International Business l Global Economy  Competitors  Markets l Measurements in SI Units l Monetary Transactions in Multiple Currencies

Ch 1-27 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Currency Exchange l Exchange Rates  Conversion Factors  Constantly Varying l Spot and Future Rates l Rates Obtained from:  Banks, Newspapers, Internet

Ch 1-28 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Effects of Exchange Rates l Strong Dollar Import Goods Cost Less Export Goods Cost More – Lose to Foreign Competition Requires Price Cuts l Weak Dollar Expensive Imports Exports Are More Competitive Higher Trade and Budget Deficits Overall – Worse for the U.S. Economy

Ch 1-29 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Significant Digits l Addition and Subtraction  Round to 1 Significant Digit to the Right of the Number with the Least Significant Digits l Multiplication and Division  No More Significant Digits than the Number with the Least Significant Digits

Ch 1-30 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Layout of the Book

Ch 1-31 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management The Book l Chapter 1 – Introduction l Chapter 2 – Labor Calculations l Chapter 3 – Material Calculations l Chapter 4 – Accounting Practice l Chapter 5 – Statistics and Indexing for Forecasting

Ch 1-32 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management The Book l Chapter 6 – Estimating Methods l Chapter 7 – Operation Estimating l Chapter 8 – Product Estimating l Chapter 9 – Cost Analysis l Chapter 10 – Engineering Economy l Chapter 11 – Enterprise and Entrepreneurship

Ch 1-33 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Summary l How the Design Process Works l Where Economic Analyses Fit l How Businesses Are Organized and Compete l The Role of Information l Global Aspects