MyOcean2 Annual Operation Review # 1 Cork, 16-17 April 2013 MyOcean 2 Project Progress J. Dorandeu – MyOcean2 Project Manager

Slides:



Advertisements
Similar presentations
Marine Core Service MY OCEAN The GMES MyOcean Marine Service Bertil Håkansson SMHI, Core Service MyOcean Core User Requirements.
Advertisements

MyOcean2 First Annual Meeting – April 2013 WP 5 MONITORING & FORECASTING CENTRE for the Global Ocean (GLO MFC) MyOcean2 First Annual Meeting – Cork.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
The EUGENE project and its contributions to the GEO Ministerial 4th GEO European Projects Workshop 29/30 April 2010.
Marine Core Service MY OCEAN MyOcean 2nd Annual Meeting, April 2011, Rome MyOcean Board Activities MyOcean Advisory Committee & Long-term Roadmap.
Marine Core Service MY OCEAN WP 17 progress report on service level management & users’ feedback.
MyOcean2 First Annual Meeting – April 2013 Users support from service desk, service management Dominique Obaton, WP2 leader MyOcean2 First Annual.
Introduction and Project Overview 3rd GEO European Project Workshop Istanbul, October 8-9, 2009.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
PARIS21 CONSORTIUM MEETING Paris, October 2002 Progress Report of the Task Team on Food, Agriculture and Rural Statistics  Objectives  Past activities.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
MyOcean2 First Annual Meeting – April 2013 WP 09 MONITORING & FORECASTING CENTRE for IBI MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
Marine Core Service MY OCEAN WP 1.3 External Communication.
MyOcean2 First Annual Meeting – April 2013 WP2.3 Service Engineering MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
WMO, version 1, 10 July 2013 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
Setting up the Spanish User Group of the Marine GMES/Copernicus Component Enrique Alvarez Fanjul Puertos del Estado.
The Preparatory Phase Proposal a first draft to be discussed.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
The MyOcean Concept P.Bahurel, project coordinator.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
GMES Marine Service MY OCEAN WP 17 Service Level Management & User Feedback – GMES MyOcean First User Workshop Bertil Håkansson, SMHI.
Towards Sustainability Partnership for a European Centre for Ocean Monitoring and Forecasting (ECOMF) 16 April 2013, MyOcean Annual Review, Cork, Ireland.
ENEON first workshop Observing Europe: Networking the Earth Observation Networks in Europe September, Paris Copernicus cross-cutting in situ component.
Project situation analysis and technical reporting UNEP/GEF FNR_Rio project – 3 rd Project Steering Committee, March 13 th, 2012, Tehran, Iran Peter Herkenrath,
MyOcean2 First Annual Meeting – April 2013 Answer to users’ needs in service definition and evolution Dominique Obaton, Vincent Claverie WP2 MyOcean2.
AtGentive – CELN role. CELN Tasks Project web page (WP6) Pilot project at schools (WP5) Assessment & Consolidation (WP6) Exploitation plan (WP6)
GMES Marine Service: MyOcean,MyOcean2 ECOMF P. Bahurel EUMETSAT - MyOcean Meeting – 25 April Darmstadt.
Marine Core Service MY OCEAN WP 2 Central Engineering Central sub-systems: MyOcean Information System & Web Data Acces Portal.
Global Land-cover and Land-cover Change Task (SB-02) Brice Mora (GOFC-GOLD LC) GEO-X Ministerial Summit, Geneva, January 14, 2014.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-6 Agenda item 10 Relations with the Group on Earth Observations (GEO) IHB.
Natural Disaster Management Project Pakorn Apaphant Project and Application Subgroup WGISS 24 DLR, Oberpfaffenhofen, German October 15-19, 2007.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
MyOcean2 WP4.4 ACTIVITIES UPDATE MyO2 ANNUAL REVIEW,CORK, 16 APRIL 2013.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
Authentication and Authorisation for Research and Collaboration Christos Kanellopoulos
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
WP2 – Definition of European DCA strategy EuroVO-DCA Final Review, 29 April 2009 Françoise Genova, Coordinator, WP2 lead WP2 Definition of European Data.
Expanding the knowledge base for policy implementation and long-term transitions Dr Hans Bruyninckx Executive Director, European Environment Agency (EEA)
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
Implementation plan for Strategic Research and Innovation Agenda for Traditional Food Prof. Đuro Kutlača, PhD Institute “Mihajlo Pupin”, University of.
Update to SDCG 3-Yr Work Plan SDCG-8, Session 11 Stephen Ward (Australia) 24 Sep 2015, Bonn.
MENTEP kick off meeting and bilateral discussions Brussels, 13 April 2015 MENTEP in a nutshell …from the partners’ point of view Patricia Wastiau European.
The Lead Agency Council Sports Trust (Sport Otago) Cluster of clubs Interested parties / other.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Brussels, January 16th, Overview and status of the project.
United Nations Environment Programme
PSCE Conference Athens 23th November 2016
Oct 22 Group Leaders Planning meeting
GFOI Status & Issues CEOS Lead & SDCG EXEC SIT-31 Agenda Item 5
ESMF Governance Cecelia DeLuca NOAA CIRES / NESII April 7, 2017
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
CEOS Work planning Steven Hosford, ESA/CNES, CEO
GNC Global Partners Meeting Washington 30/03/16
AMICI WP1 – Management, coordination and dissemination
CEOS Context LSI/SDCG/GEOGLAM Joint Meeting
Current state & Prospects of implementation
Green Infrastructure: Working method
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-34
Brief introduction to the activities of the ETIP-DG Fausto Batini – President ETIP-DG Co-funded by the European Union's Horizon 2020 Research and Innovation.
Presentation transcript:

MyOcean2 Annual Operation Review # 1 Cork, April 2013 MyOcean 2 Project Progress J. Dorandeu – MyOcean2 Project Manager

MyOcean2 Annual Operation Review # 1 Cork, April 2013 First year of MyOcean-2: a very busy year A year of operations: MyOcean-2 started with the operation of MyOcean Service version 2 A year of evolutions: Definition and specification of versions 3 and 4 (resp. April 2013 and 2014), implementation of V3 A year of technical work: Design, development and release of V3, R&D, Product quality, Outreach, communication and training A year of important events: MyOcean science days, MyOcean User workshop, internal technical workshops, ECOMF strategic partnership

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Major project phases AOR 2 1st Annual Review VARR V3 / PDR V4 VARR V4 AOR 1 2d Annual Review T0+24T0+3T0+12T0+30 PDR V3/V4 T0+6 Specification Spec/Design Design V2 V3 V4

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Continuous development in operations April 2012 – April 2013 T0 T0+12 PORPOR PORPOR K O ff AORAOR T0+3 T0+6 PDRPDR PDRPDR PDRPDR EXECEXEC EXECEXEC EXECEXEC Definition of V3 and V4 DWSDWS DWSDWS A cc W S Design of V3 Design of V4 Implementation of V3V4… VaRRVaRR V2 Operations Brussels Cork Barcelona Toulouse Madrid

MyOcean2 Annual Operation Review # 1 Cork, April 2013 A deep internal involvement A improved decision process: – The Executive Committee Bureau (ECB: Marina, Sylvie, Bruce, Alistair, Vincent, Joël): Analyses the issues to be submitted to the Executive Committee -> technical dossiers, preliminary trade-offs Proposes decisions for the Exec. Com. Avoids useless preliminary discussions Some Examples: V3 and V4 requirements, WMS for all products, without authentication, Surface fluxes in reanalyses, Wave parameters, Hindcast definition, Major accounts and Specific Core Products, Merging PUMS and QuIDs, AOR organisation – Work structured and coordinated by cross-cutting work packages – A more mature way of working (within the Executive Committee): Well known decision processes Clear roles and responsibilities

MyOcean2 Annual Operation Review # 1 Cork, April 2013 A deep internal involvement Specific internal work about requirements (for V3 and V4: – In depth analysis of MyOcean status and outputs – Internal consultation at the start of the project (from Kick- Off to June 2012 in Barcelona): significant and relevant feedback from WP leaders – A lot of important decisions taken quite quickly at the Barcelona Executive Committee meeting: user profiles, visualization, Authenticated FTP, archiving, priorities for the CIS, internal interfaces and data flows, etc… – Same process used for evolutions and other decisions (Toulouse and Madrid Exex. Comm. Meetings). Preparation of the MyOcean PDR at T0+3 and T0+6 (while it was T in MyOcean).

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Reviews and meetings External reviews (4): – Kick-off April 2012 – Initial PDR (Design review) July 2012 – Final PDR October 2012 – AOR-1: today and tomorrow; POR (Pre-Operation Review), PDR and VaRR (Validation Readiness Review) on 18-19/04/2013 Internal reviews, meetings and workshops: – Executive Committee meetings (4) : Kick-Off, Brussels, April 2012 Barcelona, June 2012 Toulouse, October 2012 Madrid, January 2013 – Internal Reviews (Production Centres and CIS) (2 + 2): Design Workshops: Barcelona, June 2012, Madrid, January 2013 Acceptance workshop: Madrid, January 2013 – Technical meetings (awareness, training, etc) (1): Service Management Product Management Technical meeting wrt to CIS interfaces and tests ECOMF meetings for the preparation of the Copernicus Operational phase

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Other important events MyOcean Science Days: November 2012 – Strong participation (120 people, many projects) – Observational systems, Numerical modelling, Data assimilation, validation and user related issues – Outcomes relevant to the next phase but also to the long term operational oceanography R&D roadmap MyOcean User Workshop: April 2013 – Good participation – Plenary and splinter sessions and discussions – Final Round table – Main outcomes: actions to be decided wrt MSFD applications and users, Expected reinforcement of the link with the downstream services (end to end value chain), consolidation for a long term and sustainable Marine Service More frequent or coordinated User workshops ECOMF Strategic partnership: the Nicosia declaration: – defines an ECOMF Strategic Partnership between the “national” institutions that deliver data and predictions to their national or local authorities and ECOMF

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Review, meetings and events Summary AORAOR T0+3 T0+6 T0+9 T0 T0+12 PDRPDR PDRPDR VaRRVaRR ExecExec ExecExec ExecExec PDRPDR PORPOR SCDSCD UWSUWS DWSDWS DWSDWS ACCACC Tec WS ExecExec K O ff EC O MF Executive Committee Design Review Operation Review Validation Readiness Review Annual Operation Review Design Workshop Acceptance Workshop Technical Workshop Science Days User Workshop ECOMF strategic Partnership

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Other important events External meetings: – With ESA: GSC-DA (2), Sentinel-1 interfaces, OC-SST meeting – With EUMETSAT: 2 programmatic workshops, technical workshops and teleconferences – Project represented at EUROGOOS and ROOS meetings – With REA and GMES projects: coordination of R&D activities – GMES User Forum (presentation of the MyOcean Marine Service) – Participation to many Exhibitions, Symposiums, Workshops and other communication events…

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Main results: A user driven Service Current Service Status

MyOcean2 Annual Operation Review # 1 Cork, April 2013 A User driven Service A single user interface: Service Desk and Web Portal A specific project organisation: – Collection of user requirements and engineering into Service Definition: User requirements, user surveys, questionnaires User validation (beta testers), user feedback Traceability of each system functionality to user requirements – A Work Package dedicated to user uptake: Downstream applications and national/regional operational centres – Outreach, communication and training – User workshops Véronique Cédric Marc

MyOcean2 Annual Operation Review # 1 Cork, April 2013 A growing number of users Service v Service v1 Service v2 300 Service Level Agreements in April SLAs in March 2013 MyOcean SLAs in April users from 1000 organisations 100 new users every month 2000 users from 1000 organisations 100 new users every month

MyOcean2 Annual Operation Review # 1 Cork, April 2013 An international, multi-sector response Users in 88 different countries (26 EU members) A fair repartition in application areas And 67% of users using the core service in more than one sector

MyOcean2 Annual Operation Review # 1 Cork, April 2013 The MyOcean Service in V3 (V3 – 23 rd April 2013) Products and datasets simplification – 107 products (instead of 201 in V2) with no reduction of information Product upgrades in almost all areas 15 new products (Global, Baltic model forecasts, ocean Colour and InSitu observation products) Each Product is associated with a Product User Manual and a Quality Information Document New search engine, faster access to products, updated FAQs All products available through standard MyOcean interfaces All products can be visualized DISCOVER VIEW DOWNLOAD

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Next steps

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Next steps Main activity: preparation of V4: – Final MyOcean Service version, to be operated 6 months during the project (April 2014 – Sep. 2014) – Intermediate versions for new products or system functions (CIS) will be defined Reporting of the first period (May 2013) Preparation of the post-MyOcean2 phase in the frame of Copernicus: ECOMF

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Some challenges in the year to come Internal: – Involvement, reactivity, acting as a single entity: still needs strong efforts: not an easy task, given the size and the structure of the project – Reduce delays in each delivery or contribution: this is one major issue (example: integration and transition phases) – Keep enthusiasm in our “daily” tasks: this not the end of the story, but the beginning! – Maintain our Service and System State-of-the-Art, well integrated Internal & External: – Prepare, develop and deliver V4 (and intermediate versions) – Take new user requirements into account (from UWS in particular) External: – Engage even more the users in the Service, downstream sector – Maintain and develop relationships with main providers (Space, InSitu), European Agencies, main stakeholders – Be prepared to ECOMF... MyOcean 2 project to prepare a sustained, Service

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Annual review agenda

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Annual Review Agenda

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Annual Review Agenda

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Annual Review Agenda

MyOcean2 Annual Operation Review # 1 Cork, April 2013 Annual Review Agenda