Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Hd Status and Planning TRD Chamber Construction Meeting Clemens Adler.
TRD Status Meeting Münster Clemens Adler TRD ROC Status Status Meeting Münster
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Fgasparini LHCC Review May 041 SUMMARY: Latest results on the Minicrate performance Status of chamber production Torino line The High Voltage Boards problem/status.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
TRD Workshop RomaniaClemens Adler Heidelberg ROC Status Material procurement, Chamber Status TRD workshop Cheile Grandistei, Romania,
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Geneva CMS Week, RPC Operation Review Anton Dimitrov RPC Detector Review Hardware Status and New Technical Procedures.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
University of Wisconsin
DC56 R&D Goals, Schedule and Status
Production ad Quality control of RPCs for the CMS muon barrel system
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
10/month is the present production rate 2 FTE + sporadic contributions
To do list production organization and commitments
RPC HV&LV status Introduction HV power supply tender
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
RPC Readiness for installation
Drift Tubes CSN1 1-2 April 2003 f.gasparini 22/04/2019.
Pierluigi Paolucci & Giovanni Polese
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report

COMPLETED CERNCIEMAT SLs tested SLs being tested SLs mechanically assembled SLs being assembled #1 to #24 #25#26#27 #28 #29 #30 #31 Chamber construction Status CHAMBER Serial Number

Superlayers Chambers Production Rate

SL QC-TESTS

CHAMBER Positive or Negative To be recycled (consider it as Spare) X RPC pads to be glued XXXXXXXXXX Big leaks X Bad HV Boards (16 Ch) XXXXXX ??? HC gluing mistake X MB2 Chambers at CERN (last CMS Week - Feb 2003)

CHAMBER Positive or Negative To be recycled (consider it as Spare) X RPC pads to be glued X Big leaks X Bad HV Boards (16 Ch) XXXXXX ??? HC gluing mistake X MB2 Chambers at CERN (April 2003)

MB2 Chambers at CERN 5 more MB2 Chambers (20–24) since 5th March Tested at CERN (HV) from 6th to 16th March and all found O.K, except one sparking strip (chamber 23). Strip and Wire disconnected, now all O.K A new mobile stand-alone chamber testing system setup at ISR: HV: CAEN SY127 for test 1 SL. (Current Resolution:10nA) DAQ: One V767 TDC for test 1/2SL. TestPulse + Noise It should be improved at the near future. CIEMAT Tecnicians spent several days at ISR for gluing RPC pads Replacement of HVB’s in chambers 7,8,9,11,12,13 Depending on availability of boards and manpower Chambers with pending HV problems at March 1 st to be fixed 3,4,10,12,15 Chamber 10 repaired on March Problems due to HVBoards. 3HVB(1 per SL)  new ones (yellow type first batch)

5 MB2 + & 2 MB4/10YB+2 5 MB2 + & 2 MB4/10YB+1 2 MB2 - YB-1 TOTAL 10 MB2+(Serial numb. 17,18,19,20,21,22,23,24,25,26) 4 MB4/10  To be made 2 MB2-(Serial numb. 10,16) Next Chambers to be produced at CIEMAT: (expected to arrive at CERN before the end of 2003) MB2- : 27,28,29 (for YB0) MB4/10: 30,31,32,33,34,35(Need HC panels) MB2+: 36,37,38,39 First shipment in 2004 MB2- : 40,41,42,43,44 (to complete YB0 and YB-2) MB2 Chambers needed for installation in 2003