California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/15/01 Kyle Hoffman.

Slides:



Advertisements
Similar presentations
1 Minimum Generation Emergency Operating Reserve Proposal Gary Zielanski Markets Committee Meeting September 30, 2004.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Can Today's Demand Response Programs Support Integration of Renewable Energy.
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 Direct Participation Demand Response Tariffs Demand Response Phase IV Workshop March 21, 2011.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
PacifiCorp-CAISO EIM Initiative Overview
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
EMS Auditing Definitions
 High focus on IT talent management and high-quality, professional recruitment service  Strong customer base of end user companies, technology and consulting.
Electricity Markets Overview Lo-Cal seminar, 09/21/2010.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Copyright © 2008 ZigBee® Alliance. All Rights Reserved. ZigBee: Connecting your World July 23, 2008 Bob Heile Chairman, ZigBee Alliance
David I. McGeown "Where's the value in on site generation? Can real time metering and dispatch make a difference?
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
1 Nodal Stabilization Market Call December 28, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Logistic services. 1. Company overview  MSL Logistical Services was founded in 2009 as a response to pharmaceutical market requirements.  Certifications.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Demand Response in Midwest ISO Markets February 17, 2008.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 GENMAP Registration Workshop Jan 14, 2010.
EPSA REGULATORY AFFAIR CONFERENCE 2006 Washington, DC October 25, 2006 Garry Brown Vice President, External Affairs New York ISO.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
CALIFORNIA ENERGY COMMISSION Status Report Demand Responsive Building Program William J. Keese California Energy Commission March 30, 2001.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/29/01 Kyle Hoffman.
1 Overview of Asia Pacific Markets APEx Conference 2008 Sydney Presented by Dave Carlson Chief Executive Officer, Energy Market Company, Singapore.
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Bulk Power Transmission System
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Reliability Demand Response Product February 25, 2011
Regulation Energy Management Overview CPUC Energy Storage Workshop March 9, 2011.
Life cycle services for automation products
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
Nodal Protocol Revision Request (NPRR) TITLE: Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin March.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Electronic Lien and Title (ELT) AB 1515/2009 Overview.
14 Minute Ramp Period Testing Workshop June 30, 2009.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
EE/Econ 458 Market Overview: Time-Line and SCUC, RAC, SCED J. McCalley 1.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
ERRA Workshop on Regulatory Monitoring of the Electricity Sector Almaty, Kazakhstan, January 31 – February 2, Improvement of market relations in.
Real-Time Systems Lab. OSGi overview January 23, 2002 Sung-ho Park.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
Wind Management at MISO
Overview of the NYISO Demand Response Programs
Real-Time Co-Optimization:
The New Texas Wholesale/Retail Market
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Network monitoring service pricing. Table Of Contents 1.Company Overview 2.Network monitoring service pricing 3.Certifications.
Presentation transcript:

California Independent System Operator Participating Generator (PG) Certification Process CDWR Generation Resource Development Workshop 3/15/01 Kyle Hoffman

California Independent System Operator PG Certification Process Overview –Contracts –ISO Metering –SCADA/Telemetry –Ancillary Services Certification –Automated Dispatching System (ADS) Connectivity

California Independent System Operator PG Certification Process Applicable to: –New Generators –Restarts/Repowers –“QF conversions” upon release from IOU Standard Offer contract * ISO expediting PG Certification for Summer 2001 Reliability Generation

California Independent System Operator PG Certification Process Execution of Contractual Agreements with the ISO –Participating Generator Agreement –Meter Service Agreement for ISO Metered Entities –

California Independent System Operator PG Certification Process ISO Metering Installation –Metering Guidelines ( elines/index.html) –Installation of ISO Specification Metering by a certified installer –Certification of meters by an independent certification company –ISO Energy Communications Network (ECN) Connectivity

California Independent System Operator PG Certification Process Energy Management System (EMS) Visibility – SCADA/Telemetry –Remote Intelligence Gateway (RIG) installation - for units providing AGC/Regulation, Regulation Up and/or Regulation Down –Data Processing Gateway (DPG) installation - for units providing Spin, Non-Spin, or Replacement Reserves (

California Independent System Operator PG Certification Process Ancillary Services (A/S) Certification –A/S Certification Testing and Request Form ( /gcp) –ISO Operating Procedure G “Management of Ancillary Services Certification Testing” –Pmax, ramp rates, AGC response

California Independent System Operator PG Certification Process Automated Dispatch System (ADS) Connectivity –“Electronic Dispatch” ( –Required of all dispatchable resources, participating in ISO Real Time (RT) Energy Market

California Independent System Operator ISO Market Services For information on the ISO Participating Generator Certification Process, please contact Client Relations at: – –