Managing Accelerator Quality Matthew Conlon 13 April 2015.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

W E L C O M E.
Course: e-Governance Project Lifecycle Day 1
QA Programs for Local Health Departments
Climate Change Committee WG1 QA/QC terminology and requirements from the IPCC Good Practice Guidance and the Guidelines for National Inventory Systems.
University of Sunderland CIFM03Lecture 1 1 Quality Management of IT CIFM03 Introduction.
1 Software Testing and Quality Assurance Lecture 1 Software Verification & Validation.
Software Quality Matters Ronan Fitzpatrick School of Computing Dublin Institute of Technology.
CBIIT Quality Assurance Process Preston Wood NCI CBIIT Government Quality Representative (GQR) January 2014 RS.
Development plan and quality plan for your Project
ISO 9000 Certification ISO 9001 and ISO
National Inventory System in Finland Workshop on QC and QA of GHG Inventories and the Establishment of National Inventory Systems 2-3 September 2004, Copenhagen.
ISO 9000 Introduction Imran Hussain.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 11 Procurement Management Embedding value into the.
University of Sunderland CIFM03Lecture 3 1 QMS / Standards CIFM03 Lecture 3.
Process: A Generic View
Introduction to ISO New and modified requirements.
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working Vale of Glamorgan Council Final Report- July 2008.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Software Quality Assurance Activities
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
S Q A.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
1 Thomas HottTechnical Reviews Contents, 2 nd CDE-WS, 12 th & 13 th May 09 XFEL Technical Coordinator Technical Reviews – Contents – 1.
Quality Management in the Finland’s Greenhouse Gas Inventory Leena Raittinen, Statistics Finland UNFCCC Workshop on National Systems April 2005 Bonn,
Validation Copyright © 2004 Yokogawa Validation. Copyright © 2004 Yokogawa Page 2 Validation ProjectStandard Project > Validation.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
MANAGEMENT SYSTEM GHANA SC GROUPE 1 TUNISIA, MOROCCO, CANADA, SWITZERLAND, TURKEY, HUNGARY, EGYPT, ESTONIA LUXEMBOURG.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Internal Auditing ISO 9001:2015
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
ERASMUS+ EMREX – Field trial on the impact of enabling easy mobility on recognition of external studies Title and date.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
Software Project Management Lecture # 12. Outline Quality Management ( chapter 26 - Pressman )  SQA  Who does it?  SQA Activities  Software reviews.
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
WP High Beta Cavities Delivery
ANNUAL PRODUCT REVIEW Patchara Kootiratrakarn Independent consultant.
GD211 Training Module 5 Conclusions.
Project Quality Management
Project Management Lifecycle Phases
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
Acc. Collaboration board
Overview of Project Management
Verification and Validation Unit Testing
Lockheed Martin Canada’s SMB Mentoring Program
Learning and teaching – lessons 3 School culture 4
Project Development Quality Program QA/QC – What does ODOT need?
Are we ready to move to the Operation Phase?
ESS Security and Secure exchange of information Expert Group (E4SEG) DIME/ITDG SG ESS IT Security Framework Pascal Jacques ESTAT B2 Local Security Officer.
ISO 9001 Auditing Practices Group
ISO 9001 Auditing Practices Group
Workshop commissioning Installation Coordination at ESS
Bunker Internal Review Welcome & Charge
Internal Audits Management Review Meetings
ISO 9001 Auditing Practices Group
Acc. Collaboration board
Overview of Project Management
ESS-CEA ESSI Coordination Committee
Presentation transcript:

Managing Accelerator Quality Matthew Conlon 13 April 2015

Vision and Strategy Accelerator Systems Project Quality (ACCSYS Q) Vision ’to manage, assure and confirm the quality Accelerator’s systems and components’ Strategy Accelerator shall fulfil its Vision, and the expectations and directions of ESS and ESS Quality Division, by developing and performing a focused-for- Accelerator application of the ESS Management System (ESS MS). This will include Work Package (WP) audits, Quality assessment, technical reviews and other cooperative activity with WPs and partners (collaborators, In- Kind Contributors and suppliers) to assure quality (QA) and to confirm compliance to quality (QC) 2

Definitions Quality (Q) ‘The degree to which a set of inherent characteristics fulfils requirement’ ISO 9000 Quality Management (QM) Coordinated activities to direct and control an organization with regard to Quality ESS Quality Div. Quality Assurance (QA) Activities that attempts to improve and stabilize production (and associated processes) to avoid, or at least minimize, issues which led to the defect(s) in the first place ESS Quality Div. Quality Control (QC) Activities that focus on fulfilling requirements such as testing of products to uncover non-conformities ESS Quality Div. 3

Start Point for Managing Quality Construction Phase since early Design is in detailed stage. ESS Q Div is a small organisation, so ESS projects must manage Quality largely with their own resources within Accelerator, a QA/QC representative was not initially in the staff plan. It is now limited to single resource which is part- time until mid differences in Accelerator WP procurement strategies, scope, budget and capability / resources varied capabilities of IKC and suppliers 4

Conclusions and Way Forward Focussed approach rather than holistic: – more QA/QC on Accelerator systems and components, – less QA/QC on organisation and processes QA/QC assessment then a graded approach for: – ACCSYS WPs – IKC and suppliers ‘Matrix’ available resources from: – ESS Q Div and other ESS projects – ACCSYS WPs – external collaborators – IKC and suppliers 5

ESS Quality Div milestones (including to meet SSM expectations) Implementation of ESS MS phase Q2 Quality requirements for procurement and IKC, 2015 Q2 Supplier/in-kind QA assessment established 2015 Q2 Internal Audits (of ESS Projects) established 2015 Q3 readiness review for installation and SSM Inspection 2015 Q4 6

ACCSYS Q planning, 2015 increase ACCSYS Q resources to 1 x FTE during Q Develop ACCSYS Quality plan by end of Q in parallel with the above, perform or participate in Accelerator’s and partner’s activities for assuring and controlling Quality 7

Outline of activities for Quality (QA/QC) activityACCSYS Q representation Work Packages (WP) auditsparticipates in annual WP audits assessment of capabilities and needs – WPs, IKCs, Suppliers With ESS Q Div, WPs and partners, plans, coordinates and conducts assessment to determine graded approach internal requirements reviewobserves and/or receives copies of reports procurement and IKC agreementparticipates in review of technical SoWs, specifications / requirements design and verification reviews for Accelerator systems and components assist WP planning for technical reviews including readiness and acceptance reviews participates in technical reviews etc. observe / witness verification activities including testing observe / witness regulatory compliance activities 8

ACCSYS Q Questions? 9